Inspection template in the LeanSuite app
Last reviewed
Gauge r and r preparation checklist
Check before a measurement system study.
The full question list
The 6 questions in the inspection
Every question is answered Yes, No or N/A. Each No is flagged and asks for a photo and a comment, so the finding arrives with its evidence.
Preparation
- 1Gauge is calibrated
- 2Parts cover the range
- 3Operators are selected
- 4Method is defined
Record
- 5Study recorded
- 6Check signed
When to use it
- When it is due on your audit programme, or after a change or a problem.
- The person responsible for the area or equipment answers each question on the spot.
- Each record starts with: Gauge ID.
How it is scored
The template is built with points per answer and a pass mark of 90. In this library every audit is set to pass at 80 and every inspection at 90. Each submitted inspection shows its score and pass or fail, and every No is flagged with its photo and comment.
Change the points or the pass mark after you clone it. How rules and scoring work.
Read and print
More in quality and food safety
- Battery manufacturing dry room checklist5 questions
- Calibration and gauge audit checklist10 questions
- Cleanroom pressure differential checklist6 questions
- Cold chain vehicle temperature checklist6 questions
- Cold storage temperature checklist11 questions
- Customer audit readiness checklist6 questions
Use this template in LeanSuite
It is ready in the Template Marketplace inside Lean Creator as “Gauge R and R Preparation Check”. Clone it into your plant, change any question, then schedule it to a person, role or asset with reminders. Auditors complete it on a phone or tablet, with photo evidence where required.
Not on LeanSuite yet? On a 90-day pilot our team sets up your account and digitizes the forms and checklists you use today, this one included.

