Lean examples, sorted by type
Most lean methods are easier to get once you have seen a few. Each gallery below has illustrated cards sorted by type, with what the example does and where you would see it. For the words themselves, see the glossary.
Which gallery to open, by the problem on your line
- The same mistake keeps getting throughPoka-yoke examples (28 examples)
- Changeovers take too long, so batches stay bigSMED examples (16 examples)
- Small machine problems turn into breakdownsAutonomous maintenance examples (24 examples)
- One thing people must know or do the same wayOne point lesson examples (20 examples)
- A problem with data behind it and no obvious causeDMAIC examples (16 projects)
- Good work and ideas go unrecognizedEmployee rewards examples (24 examples)
- People ask what lean looks like on a real lineLean manufacturing examples (21 examples)
- New operators learn the job by asking aroundWork instruction examples (16 examples)
- Nobody can say who is trained to cover which jobTraining matrix examples (17 examples)
- Two shifts work out the same KPI in two different waysManufacturing KPI examples (19 examples)
- Tools and parts take a search to find5S examples (19 examples)
- Small problems wait for a project that never startsKaizen examples (18 examples)
- Nobody can tell at a glance if the area is ahead or behindVisual management examples (18 examples)
- The same job runs a different way on each shiftStandard work examples (16 examples)
- 28 examples
Poka-yoke examples
28 illustrated poka-yoke examples from daily life and the shop floor, sorted into contact, fixed-value and motion-step methods, each marked prevention or detection.See the examples - 20 examples
One point lesson examples
20 one point lesson (OPL) examples sorted into basic knowledge, safety, problem case and improvement case, each with the mistake it heads off, the picture it uses and who it is for.See the examples - 16 projects
DMAIC examples
16 illustrative DMAIC projects, from scrap and changeovers to invoices and clinic waiting times, each outlined phase by phase through Define, Measure, Analyze, Improve and Control.See the examples - 24 examples
Employee rewards examples
24 employee reward examples sorted into intrinsic, monetary, non-monetary, incentive schemes and wellness, each with what it is good for and the usual pitfall.See the examples - 16 examples
SMED examples
16 worked SMED changeover examples sorted by Shingo's stages and filterable by technique and machine, each with a before and after timeline of internal and external work.See the examples - 24 examples
Autonomous maintenance examples
24 illustrative autonomous maintenance examples sorted by the seven AM steps and filterable by equipment, each with the defect tag, the fix, a before and after drawing of the visual control, who checks it and how often, and the minutes it saves.See the examples - 19 examples
5S examples
19 illustrative 5S examples sorted by Sort, Set in order, Shine, Standardize and Sustain, each with a named station, a number before and after, what changed, who keeps it and what the materials cost (a red tag sweep, a shadow board, a changeover cart, min and max labels, a clean and inspect route, a photo standard, one floor marking colour code, a weekly audit with a posted score out of 125).See the examples - 18 examples
Kaizen examples
18 illustrative kaizen examples sorted into quick kaizen, team kaizen and kaizen events, each with a named station, a number before and after, what changed, who keeps it and what the materials cost (a tilted bin stand, a tool balancer, a low-roll mark, a go/no-go gauge, a kit tray, a timed material route, a 3-day changeover event, an office event on quote turnaround).See the examples - 18 examples
Visual management examples
18 illustrative visual management examples sorted into visual displays, standards, metrics and controls, each with a named station, a number before and after, what changed, who responds and what the materials cost (a next-jobs board, pipe labels, boundary samples, green zones on gauges, an hour-by-hour board, an SQCDP board, a safety cross, an andon light, a two-bin kanban, a FIFO lane, a T-card PM board).See the examples - 16 examples
Standard work examples
16 illustrative standard work examples sorted into single stations, cells and lines, support work, and leaders, training and audits, each with a named station, a number before and after against takt time, what changed, who keeps it and what the materials cost (an assembly station with three sequences, a lathe and mill cell on a combination table, standard WIP in a weld cell, a 4-station line rebalance, a changeover, trailer loading, team leader standard work, a job breakdown sheet).See the examples - 21 examples
Lean manufacturing examples
21 lean manufacturing examples sorted by the five lean principles (value, value stream, flow, pull, perfection) and filterable by the waste removed and the plant type. Each card names the place, the number before and after, and what the change took. 19 are illustrative cases and 2 summarize published history with a source.See the examples - 16 examples
Work instruction examples
16 manufacturing work instruction examples with the text written out: the header, the numbered steps with spec values, the key points with reasons, and what to do when a step fails. Grouped by assembly, machine operation, quality checks, safety and maintenance, packing and handling, plus two before and after rewrites. All illustrative.See the examples - 17 examples
Training matrix examples
17 training matrix examples for manufacturing with the rows written out: matrices by role (operators, machinists, maintenance, warehouse, quality, new hires, team leaders), required training with dates including forklift and lockout matrices built on the OSHA standards, three level scales with definitions, and four ways to read a finished matrix for cover and gaps. Crews, names and dates are illustrative.See the examples - 19 examples
Manufacturing KPI examples
19 manufacturing KPI examples across safety, quality, delivery, cost, equipment and people. Each gives the formula, one worked calculation with numbers, the owner and review rhythm, and the usual way the KPI gets miscounted: recordable incident rate, first pass yield, rolled throughput yield, on time in full, schedule attainment, OEE, MTBF, MTTR, inventory turns and more. The plants and numbers are illustrative.See the examples
Complete worked examples
PDCA examples
Six complete plan-do-check-act cycles from the shop floor, each with a baseline, a target, a prediction written before the trial, a small-scale test, the check against all three and the decision that followed. Two miss their target.See the examplesFishbone diagram examples
Five worked fishbone diagrams from plant problems, each drawn with its 6M or 4P bones, then the vote that set the order of checks, how each top cause was confirmed or ruled out with evidence, the action and the result, plus the five weak spots that make fishbones fail.See the examplesGemba walk examples
Twelve worked gemba walks, filterable by area (receiving to office) and purpose (safety, standard work, quality, 5S, flow, people), each with a route, what to look for and why, questions to ask, what not to do and a filled-in observation log.See the examplesA3 examples
Three complete A3 reports (problem solving, proposal and status) laid out left side and right side, with a coach's note on every box and the weak spots reviewers see most.See the examples5 whys examples
Ten worked 5 whys chains in manufacturing, quality, safety and maintenance. Each gives the evidence that checks every why, the verified cause, the countermeasure and how the fix was verified, with the wrong turn that was available.See the examples
How to use these examples
From reading an example to using the method
- 1
Start from the problem in front of you
Pick the gallery for the method your team is about to use, then read the two or three examples closest to your own area and the kind of problem you have. Skip the rest for now. - 2
Copy the shape, not the numbers
The worked examples are illustrative, written from conditions common in plants rather than from one company. Keep the structure, such as the questions asked or the evidence behind each step, and put your own data in. - 3
Walk one through with the team first
Before you run the method for real, go through one example at a huddle or at the start of a kaizen. People see what a finished one looks like, and the first real attempt goes faster.
Next step
Want these examples running on your own lines?
See how LeanSuite runs lean routines like these in one place, on a 45-minute call with Q&A.
Ready to put one to work?
The free templates turn each method into a sheet your team can fill in on the floor this week.