Skip to content
Try LeanSuite for 90 days for $3,000
LeanSuite - Lean Manufacturing Software

Appliances and consumer durables: Lean manufacturing software for appliance and consumer durables plants

LeanSuite connects kaizen, best practices, line balancing and quality across every plant in an appliance or consumer durables network. Whirlpool tackled project visibility and continuous improvement across 14 manufacturing plants with LeanSuite.

By clicking "Schedule Demo," you agree to the use of your data in accordance with LeanSuite's Privacy Notice, including for marketing purposes.

The problem

What slows appliance and consumer durables plants down

Appliance and consumer durables makers often run several plants building similar products on long assembly lines. Here is where that slows them down.

  • Sharing what works between plants

    One plant solves a problem and another is still fighting it months later, because improvements travel by email and slide deck, if at all.

  • Running kaizen at scale

    Hundreds of kaizen events and projects across plants and departments are hard to see in one place. Leaders cannot tell which projects are late, who is overloaded or what the program actually saved.

  • Line balancing on assembly lines

    Mixed-model assembly lines shift with the product mix and demand. Rebalancing with a stopwatch and a spreadsheet is slow, so lines can run out of balance for weeks.

  • Defects, rework and cost of poor quality

    Cosmetic damage, leaks and failed functional tests turn into rework, scrap and warranty cost. Engineers end up working on the loudest problem instead of the most expensive one.

  • Ideas from a large workforce

    Assembly workers see waste every day, but suggestion boxes and spreadsheets leave ideas unanswered, and people stop sharing them.

How LeanSuite helps

How LeanSuite helps appliance and consumer durables plants

Each problem maps to a LeanSuite module you can start with on its own, then connect to the rest.

  1. Sharing what works between plants

    In LeanSuite: Best Practice Management turns a local win into an approved, step-by-step standard and pushes it to every relevant site at once. Each team is notified, the new procedure goes straight into their workflow, and a dashboard shows which plants have adopted it.

    Best Practice ManagementYokoten

  2. Running kaizen at scale

    In LeanSuite: Kaizen & Projects runs every improvement with A3, DMAIC and PDCA templates, Kanban and Gantt views, and projected and actual savings. Savings can go to Finance for sign-off before a project closes, with hard and soft savings tracked separately and rolled up for leadership.

    Kaizen & ProjectsCI Portfolio

  3. Line balancing on assembly lines

    In LeanSuite: Upload a video of the line and Vision AI produces a Yamazumi chart, a takt comparison and rebalancing recommendations. It balances mixed-model lines by weighting elements by product mix. Vision AI is priced separately from the facility plan.

    Line BalancingAI Video Analysis

  4. Defects, rework and cost of poor quality

    In LeanSuite: Issue Management logs each defect where it is found. The Quality Matrix puts a cost on it across product lines and processes, and Kaizen & Projects runs the root-cause project and verifies the fix.

    Cost of Poor QualityQuality Prioritization MatrixNon-Conformance (NCR)

  5. Ideas from a large workforce

    In LeanSuite: Employees submit ideas from the shop floor, a reviewer approves or rejects each one with feedback, and an approved idea launches a Kaizen project. Campaigns, points and a leaderboard keep people taking part.

    Idea Management

Customers

Companies that use LeanSuite

  • Whirlpool logo
  • Haceb Whirlpool logo
  • Maytag logo
  • KitchenAid logo
  • Amana logo
  • Hotpoint logo
  • Indesit logo
  • Bauknecht logo
  • Consul logo
  • Jenn-Air logo
  • InSinkErator logo

Whirlpool case study

How Whirlpool tackled project visibility and continuous improvement across 14 manufacturing plants with LeanSuite.

Its Global Kaizen Power Pitch saw 150 Kaizen presented, $14.8M in hard savings and $17.6M in soft savings.

Read the Whirlpool case study
  • 14

    Manufacturing plants

  • 150

    Kaizen presented at the Global Kaizen Power Pitch

  • $14.8M

    Hard savings

  • $17.6M

    Soft savings

What getting started looks like

  • Under a week

    Until your first module is live; our team does the setup

  • $3,000

    90-day pilot per facility, credited in full to the annual plan

  • One flat price per facility

    Unlimited users, so adding people does not change the price

  • 99.5%

    Monthly uptime commitment in the service agreement

SOC 2 Type 1 audited, hosted on secure cloud infrastructure, with single sign-on through Microsoft Entra ID or Okta and employee-ID sign-in for operators without email. Details on the security page.

FAQ

Questions from appliance and consumer durables plants

See LeanSuite across your plant network

Bring the improvement program you want to connect first. We will show you how LeanSuite handles it and what a 90-day pilot would cover.