Skip to content
LeanSuite

Enterprise Yokoten: Stop Reinventing the Wheel at Every Plant.

Yokoten software shares a proven improvement from one plant with every other plant and tracks who adopted it. LeanSuite records the local win, turns it into a standard, and shows each plant's status.

By clicking "Schedule Demo," you agree to the use of your data in accordance with LeanSuite's Privacy Notice, including for marketing purposes.

Yokoten, step by step

What yokoten means and how to run it

Yokoten, roughly horizontal deployment in Japanese, means copying an improvement that has been proven in one area to every other line, shift or site that runs the same or a similar process. It is more than sharing a good idea: the receiving team goes to see the original, adapts it to its own equipment and people, measures its own result and changes its own standard work.

  1. 1

    Check it is ready to copy

    A full PDCA cycle, a measured result that met its target and held, and a write-up with the root cause and exactly what changed. An improvement still being tested spreads doubt, not capability.

  2. 2

    Pick the candidates

    Someone who sees every area lists the lines and sites that run a similar process and marks each one applicable or not, with the reason when it is not.

  3. 3

    Go and see, then adapt

    The receiving team visits the source, measures its own before value and adapts the change to its own conditions before it touches anything.

  4. 4

    Measure and close with the standard

    Record the after value and compare the improvement with the source's. Close the deployment only when the result is good enough and the area's standard work shows the new method.

Illustrative yokoten of quick-release die clamps from press 1 to three other presses
PressChangeover beforeAfterImprovementShare of the source's improvementStatus
Press 1 (source)48 min22 min54.2%100%Held for eight weeks
Press 246 min24 min47.8%88%Closed, standard updated
Press 352 min27 min48.1%89%Closed, standard updated
Press 444 min31 min29.5%55%Below the 80% the site set: go and see again, adapt, retry

Improvement = (before − after) ÷ before. Share = the press's improvement ÷ the source's. Numbers from the worked example in the free yokoten tracker; the 80% threshold is that site's choice, not a standard.

The same clamps gave three presses between 55% and 89% of the source's gain, which is why a multiplier on one plant's saving is a ceiling, not a forecast. Track each candidate's own before and after in the yokoten tracker.

The Replication Gap

The true cost of siloed factories

Multi-site manufacturers fund the same improvement projects at different plants because they have no system to share what works.

The disconnected enterprise

  • Isolated Wins

    A good improvement stays inside the plant that made it.

  • Wasted CI Resources

    Three engineering teams spend months solving the same machine defect.

  • Inconsistent Standards

    Customers get different quality depending on which plant made their order.

The LeanSuite network

  • Centralized Knowledge

    One searchable library of validated improvements and standards.

  • One-Click Deployment

    Corporate CI leaders push a new SOP or checklist to every plant at once.

  • Tracked Adoption

    Each plant marks a practice as applicable, implemented or not applicable, with a reason.

Schedule Demo

HOW IT WORKS

Three modules, one yokoten rollout

Kaizen & Projects records the win. Lean Creator turns it into a digital SOP or checklist. Best Practice & LMS shares it with every plant and tracks adoption.

Kaizen & Projects
Lean Creator
Best Practice & LMS

Kaizen & Projects

Local Validation & Documentation

Validate the local win

One plant runs a Kaizen that cuts scrap. The project records the new process steps and the verified savings, and an expansion section can copy it to another line or plant with a new lead.

  • Run and validate Kaizen events at plant level

  • Record the validated savings and the new process steps

  • Attach the documents that prove the result

  • Copy a finished project to another area with a new lead, keeping the link to the original

  • Searchable by machine type, defect code or department, so other plants find it

A digital SOP built from the Line A4 Kaizen, with photo and video steps and a linked audit checklist

Lean Creator

Digital Standard Creation

Digitize the new standard

The winning process becomes a visual, digital Standard Operating Procedure (SOP) or an updated audit checklist that any line can repeat.

  • Convert validated improvements into digital SOPs

  • Photo and video steps that travel between plants with little translation

  • Updated audit checklists confirm the new standard is followed

  • Local plants can add site-specific steps, with permission

Best Practice & LMS

Global Deployment & Adoption

Deploy and track globally

Corporate makes the win a best practice and shares it with sister plants. Each plant marks it applicable, implemented or not applicable, and training goes out through the LMS.

  • Elevate local wins to global best practices

  • Push the new standard to every plant through the LMS

  • Supervisors verify training at each site

  • Each plant records applicable, implemented or not applicable, with a reason

  • Adoption, benefit and cost reports show which plants have adopted it

A global best practice pushed to sister plants, with training verified and checklists deployed at each plant
The page's example worked through: a $50,000 saving at one plant repeated at ten identical plants

Multi-Site Excellence

Scaling the "One Best Way"

Your best day at your best plant becomes the baseline for every plant.

Break Down Language Barriers

Standards built from photos and video, not dense text, travel easily between a plant in Ohio and a plant in Monterrey.

Multiply Your ROI

Illustrative: a Kaizen that saves $50,000 a year at one plant is worth up to $500,000 across ten plants running the same process. Copies rarely match the source, so each plant's own result is tracked.

Enterprise Ready

Enterprise architecture for multi-site manufacturers

Scaling across plants takes strong security, strict permissions and reliable uptime. LeanSuite has a SOC 2 Type 1 report and is cloud hosted, with several plants in one workspace and single sign-on (SSO) through Microsoft Entra ID or Okta.

  • SOC 2 Type 1 report

  • SSO with Entra ID and Okta

  • Unlimited users per facility

  • 99.5% monthly uptime commitment

FAQs

Frequently Asked Questions

  1. It shares a proven improvement from one plant with every other plant and tracks who adopted it. LeanSuite records the validated win, turns it into a digital standard, shares it with every plant and tracks adoption.

  2. Each plant marks a shared best practice as applicable, implemented or not applicable, with a reason. Adoption reports show the status at every plant, and benefit and cost reports show what it delivered.

  3. Yes. The expansion section copies a finished project to another area with a new lead, and keeps the link to the original so results can be compared.

  4. Yes, with permission. Corporate sets the non-negotiable standard, and local managers can add site-specific steps, such as local safety rules, to the checklist.

  5. Yes. The Kaizen portfolio is searchable by machine type, defect code or department, so engineers can check whether another plant has already solved a problem.

  6. Yes. Each user can choose their interface language, and photo- and video-first SOPs and checklists need little translation between plants.

Run it in LeanSuite

Ready to Multiply Your CI ROI?

See how LeanSuite's enterprise architecture connects your facilities and scales your most profitable improvements globally.