Skip to content
Whirlpool logo

Driving manufacturing excellence: A Whirlpool case study

How one connected system for project management and continuous improvement helped Whirlpool Corporation win national recognition.

  • Headquarters

    United States of America

  • Industry

    Manufacturing

  • Employees

    15,009

Global Kaizen Power Pitch

Hard Savings
$14.8M
Soft Savings
$17.6M
Kaizen Presented
150
Project Team Members
612
Winner of a 2022 Manufacturing Leadership Award

Client Overview

Whirlpool Corporation

Whirlpool is a global leader in home appliances, with a large manufacturing network across the U.S. and Mexico and a long record of innovation and operational excellence.

Read More

This case study details our partnership with Whirlpool's North American Manufacturing leadership team to address key challenges and drive transformative change.

Key results

Award-winning excellence

LeanSuite helped Whirlpool drive millions in savings and win industry recognition for operational excellence.

  • Winner of a 2022 Manufacturing Leadership Award

  • Millions in savings from Kaizen projects

  • Unified project management across all plants

The challenge

Whirlpool had to manage a large project portfolio and build one culture of continuous improvement across 14 manufacturing plants, without full visibility, with uneven resource allocation and piecemeal sharing of best practices.

  • Lack of visibility

    No single, connected place to track every project, so total workload and project status were never fully visible.

  • Resource misalignment

    Project leaders weren't matched to work by knowledge and workload, which risked delays and weaker project outcomes.

  • Disconnected improvement

    Successful Kaizen projects and best practices were shared piecemeal, which limited savings at scale.

The solution: a system and a competition

We worked with Whirlpool on two fronts: a connected project tracking system, and a global competition that got teams sharing their improvements.

  • 1. Whirlpool project tracking system

    Built on LeanSuite, one connected system for every project: real-time visibility, project leaders matched to assignments, and a clear view of timing and delays. It is what made the Global Kaizen Power Pitch work.

  • 2. Global Kaizen power pitch

    A global competition that motivated employees and changed how they delivered process improvements, giving teams a structured stage to present their work and share best practices worldwide.

Each challenge, and the part of the solution that answered it

  • The challenge: Lack of visibility: no single place to track every project.What answered it: Project tracking system: one connected system with real-time visibility of every project.
  • The challenge: Resource misalignment: leaders not matched to work by knowledge and workload.What answered it: Project tracking system: project leaders matched to assignments, with a clear view of timing and delays.
  • The challenge: Disconnected improvement: successful Kaizen shared piecemeal.What answered it: Global Kaizen Power Pitch: a structured stage to present work and share best practices worldwide.
Two of the three challenges were answered by the tracking system; the third by the competition, which the tracking system made possible.

The impact: By the numbers

What the Global Kaizen Power Pitch, run on LeanSuite, delivered:

  • 84

    Kaizen Battles

  • 150

    Kaizen Presented

  • 612

    Project Team Members

  • 191

    Committee Members

  • $14.8M

    Hard Savings

  • $17.6M

    Soft Savings

Savings from the Global Kaizen Power Pitch, in millions of dollars

  • Hard savings: $14.8M
  • Soft savings: $17.6M

Two columns: hard savings $14.8M, soft savings $17.6M.

Hard savings show up in the budget, such as less scrap, material or overtime. Soft savings are real but indirect, such as hours freed up or costs avoided, which is why the two are reported separately.

Expert Guidance

Plan your own improvement program

Book a free 30-minute consultation to pin down your biggest challenges and sketch a roadmap for tackling them.

  • Benefit from our expertise

    Talk to the team behind the platform Whirlpool used for its award-winning Kaizen program.

  • A no-pressure conversation

    Not a sales pitch. We look at your specific challenges and give you insights you can act on right away.

Pick a time that works for you

Loading Calendar

Please wait while we prepare your scheduling options...

Trusted by industry experts

“The Project Tracking System generates significant savings while ensuring seamless delivery... The Global Kaizen Power Pitch completely transformed our ability to share best practices.”

- Ramsey Aljahmi

Sr. Director of NAR Operations Excellence, Whirlpool Corporation

FAQs

About this case study

  1. Whirlpool's North American manufacturing leadership team used LeanSuite to track every continuous improvement project across 14 plants in one connected system. The same system ran the Global Kaizen Power Pitch, a competition where teams presented their Kaizen and shared best practices.

  2. There was no single place to see every project, so workload and status were never fully visible. Project leaders weren't matched to work by knowledge and workload, and successful Kaizen were shared piecemeal, which limited savings at scale.

  3. 84 Kaizen battles, 150 Kaizen presented, 612 project team members and 191 committee members, with $14.8M in hard savings and $17.6M in soft savings. Whirlpool was also a winner of a 2022 Manufacturing Leadership Award.

  4. Hard savings show up in the budget, such as less scrap, material or overtime. Soft savings are real but indirect, such as hours freed up or costs avoided. LeanSuite records each Kaizen's benefits as hard or soft, so the two are reported separately.

  5. The project tracking, savings roll-up and best-practice sharing Whirlpool used are LeanSuite's continuous improvement modules. You can test them on your own lines with the 90-day pilot: $3,000 per facility, set up by our team, with your first module live in under a week.