Local exhaust ventilation checklist
Monthly check of local exhaust ventilation and fume or dust extraction.
The full question list
The 9 questions in the inspection
Every question is answered Yes, No or N/A. Each No is flagged and asks for a photo and a comment, so the finding arrives with its evidence.
Hoods and ducts
- 1Hoods and capture points are in the right position and undamaged
- 2Ducts are intact with no leaks or blockages
- 3Dampers are set as marked
Performance
- 4Airflow or pressure gauges show normal readings
- 5Smoke or tissue tests show air is drawn into the hood
- 6Extraction is on whenever work is being done
Filters and records
- 7Filters are clean and changed on schedule
- 8The last thorough test is in date
- 9Faults are reported and recorded
When to use it
- Once a month.
- The person responsible for the area or equipment answers each question on the spot.
- Each record starts with: Extraction system.
How it is scored
The template is built with points per answer and a pass mark of 90. In this library every audit is set to pass at 80 and every inspection at 90. Each submitted inspection shows its score and pass or fail, and every No is flagged with its photo and comment.
Change the points or the pass mark after you clone it. How rules and scoring work.
Read and print
More in safety inspections and audits
- AED inspection checklist9 questions
- Emergency lighting inspection checklist8 questions
- Eyewash and safety shower weekly checklist12 questions
- Water heater inspection checklist: hot water safety6 questions
- Compressed gas cylinder storage checklist11 questions
- Crane hook and sling pre-use checklist8 questions
Use this template in LeanSuite
It is ready in the Template Marketplace inside Lean Creator as “Local Exhaust Ventilation Check”. Clone it into your plant, change any question, then schedule it to a person, role or asset with reminders. Auditors complete it on a phone or tablet, with photo evidence where required.
Not on LeanSuite yet? On a 90-day pilot our team sets up your account and digitizes the forms and checklists you use today, this one included.