Guide with a worked example

Cascading goals and goal alignment: from the company to each person

Short answer

Cascading goals means turning a company goal, level by level, into a goal each facility, department and person can act on. Each level's number adds up to the one above. Goal alignment is the result: every piece of improvement work traces to a company goal, and the work that does not is visible.

Last updated:

  1. Company

    Unplanned downtime from 1,800 to 1,200 hours a year across the three plants

    Measured by: Unplanned downtime, hours, all plants

  2. Facility

    Plant 2: unplanned downtime from 700 to 450 hours a year, with the press shop first

    Measured by: Unplanned downtime, hours, Plant 2

  3. Department or team

    Press shop: unplanned press downtime from 320 to 180 hours a year; PMs completed on schedule from 68% to 95%

    Measured by: Unplanned downtime, hours, presses 1 to 4

  4. Person

    Maintenance planner: next week's PM schedule issued by Thursday in 100% of weeks, from 55%

    Measured by: Weeks with the schedule out by Thursday

An example with sample data.

The definition

What are cascading goals?

Cascading goals is the practice of translating a company goal into a goal for each level below it: company to facility, facility to department or team, department to person. Each level keeps the measure it can move and the share of the number it owns, so a person can trace their key result back to the company goal in three steps.

Most companies believe their strategy is understood. In a 2018 MIT Sloan Management Review study of 124 organizations, only 28% of the executives and middle managers responsible for carrying out strategy could list three of their company's strategic priorities. If the people running it cannot name it, the people on the floor are working from something else: last year's targets, the loudest customer, the project that is already funded (Sull, Sull and Yoder, MIT Sloan Management Review, 2018 (opens in a new tab)).

A cascade fixes that only when it is a translation, not a copy. A company goal pasted onto every facility's scorecard is still the company's goal. The facility's version has to name the lines, the number and the owner, and the department's version has to be something a team leader can see on Monday. Translation takes a round of catchball; a copy takes an email.

Three words, three jobs

Cascading vs aligning vs catchball: what is the difference?

Cascading is the top-down handoff: a goal goes down and each level receives its share. Aligning is the state you want: every goal and initiative links to a company goal, written in either direction. Catchball is how the cascade becomes two-way: each level replies with what it can commit to, and the goal changes if the replies do not add up.

Cascading, aligning and catchball compared
AspectCascadingAligningCatchball
What it isThe top-down handoff of a goal, level by levelThe state where every goal and initiative traces to a company goalThe two-way round that agrees a goal between levels
DirectionDownEither: top-down goals, bottom-up proposals, both linkedDown, then back up, then down again
What each level doesReceives its share of the numberLinks its own goals and work to the level aboveReplies: adopt it, write our own version, or explain why it does not apply
Fails whenThe goal is copied, not translatedWork is linked to goals after the fact to look alignedLeaders send the draft as a decree, or never read the replies
What you see at the endA goal at every levelA short Other listAn owner who agreed at every level

Catchball comes from hoshin kanri; the catchball section of the hoshin kanri guide walks through the round step by step, and the post on the catchball process goes deeper.

Company to person

How many levels should goals cascade through?

Four levels is enough for most manufacturers: the company sets the goal and the KPI it is measured by; each facility adopts it or writes its own version with its share of the number; each department or team takes the part it can move; one person owns each key result. More levels and the chain goes slack in the middle.

  1. Company

    Unplanned downtime from 1,800 to 1,200 hours a year across the three plants

    The goal for the year, the KPI it is measured by, the owner and why it matters.

    Measured by: Unplanned downtime, hours, all plants

  2. Facility

    Plant 2: unplanned downtime from 700 to 450 hours a year, with the press shop first

    Adopts the goal as written, or writes its own version with its share of the number and its lines named.

    Measured by: Unplanned downtime, hours, Plant 2

  3. Department or team

    Press shop: unplanned press downtime from 320 to 180 hours a year; PMs completed on schedule from 68% to 95%

    The part of the facility goal it can move, in its own words, with one or two key results.

    Measured by: Unplanned downtime, hours, presses 1 to 4

  4. Person

    Maintenance planner: next week's PM schedule issued by Thursday in 100% of weeks, from 55%

    One or two key results that are theirs alone, which the team's number depends on.

    Measured by: Weeks with the schedule out by Thursday

An example with sample data.
  1. Company

    The goal for the year, the KPI it is measured by, the owner and why it matters.

  2. Facility

    Adopts the goal as written, or writes its own version with its share of the number and its lines named.

  3. Department or team

    The part of the facility goal it can move, in its own words, with one or two key results.

  4. Person

    One or two key results that are theirs alone, which the team's number depends on.

A worked example

A worked cascade: one goal through four levels

One company goal, unplanned downtime from 1,800 to 1,200 hours a year across three plants, cascaded to each plant's share, then to the press shop at one plant, then to the maintenance planner's key result. The plant shares add up to the company numbers, and the planner's measure is one she alone controls. Illustrative figures.

  1. CompanyOperations director

    Cut unplanned downtime by a third: Unplanned downtime, hours a year, all plants, 1,800 to 1,200

    • Unplanned downtime is the largest single reason the company misses deliveries and pays overtime.
  2. Facilities

    Three shares that add up

    • Plant 1: 600 to 420 hours. Adopt as written. Takes a 30% cut, the same share as the company.
    • Plant 2: 700 to 450 hours. Write own version. Takes a larger cut because the press shop has the most hours to recover.
    • Plant 3: 500 to 330 hours. Write own version. Takes a slightly larger cut on its two oldest lines.
  3. DepartmentPress shop, Plant 2

    Keep the four presses on their PM schedule and stop repeat failures

    • Unplanned downtime, presses 1 to 4: 320 hours a year to 180 hours a year
    • Preventive maintenance completed on schedule: 68% to 95%
  4. PersonMaintenance planner, Plant 2

    One key result that is hers alone

    • Weeks with next week's PM schedule issued by Thursday: 55% to 100%
An example with sample data. Illustrative numbers; the plant figures add up to the company figures.
  1. 1

    Company: the goal and its KPI

    Unplanned downtime from 1,800 to 1,200 hours a year across three plants. That is 600 hours off, or a third of 1,800 (600 divided by 1,800 is 0.33). Measured by one KPI, owned by the operations director.

  2. 2

    Facilities: three shares that add up

    Plant 1 goes from 600 to 420, Plant 2 from 700 to 450 and Plant 3 from 500 to 330. Today's figures add to 1,800 (600 plus 700 plus 500) and the targets add to 1,200 (420 plus 450 plus 330). Plant 1 adopted the goal as written; Plants 2 and 3 wrote their own version in catchball, and Plant 2 took a bigger share because its press shop has the most hours to recover.

  3. 3

    Department: the part it can move

    Plant 2's press shop owns 320 of the plant's 700 hours and commits to 180, a cut of 140 hours. That is more than half of Plant 2's 250-hour reduction (700 minus 450), which is why the plant manager put the press shop first. Its second key result, PMs on schedule from 68% to 95%, is the leading measure.

  4. 4

    Person: one number that is theirs alone

    The maintenance planner cannot promise downtime hours; too many hands touch that. She can promise that next week's PM schedule is out by Thursday every week, from 55% of weeks today. If that key result hits and PM completion still does not move, the problem is somewhere else, and the review knows where to look next.

  5. 5

    Back up the chain

    Each level reports its own number at its own review. The press shop's hours roll into Plant 2's, Plant 2's into the company's. Nobody re-keys a figure, and when the company KPI is red, the grid shows which plant, and the plant's grid shows which department.

The alignment measure

How do you see work that is not aligned with the goals?

List every live initiative, project and kaizen in one place and ask which goal each one serves. Anything with no answer goes in a list called Other. The length of that list is the alignment measure: a long Other list means the plant is busy on things nobody chose. Review it monthly and either link, stop or consciously keep each item.

Connected to a company goal: 4 of 7
  • PM schedule standard for presses 1 to 4Maintenance plannerServes: Cut unplanned downtime by a third
  • SMED on Press 2EngineeringServes: Cut unplanned downtime by a third
  • Error-proofing at final testQualityServes: Ship nothing the customer has to sort
  • Near-miss reporting on every shiftEHSServes: Nobody goes home hurt
Other: 3 of 7
  • New canteen layoutFacilitiesServes no company goal
  • Visitor badge printerReceptionServes no company goal
  • Line 4 relabelling for a new customerProductionServes no company goal

Reviewed monthly: link it to a goal, stop it, or keep it and say why.

An example with sample data.
  1. 1

    List everything that is live

    Projects, kaizens, A3s, capital requests, the things the CI team is doing this month. If it has a person's time against it, it is on the list.

  2. 2

    Ask one question of each

    Which company goal does this serve? One answer per item. Serves everything is the same as serves nothing.

  3. 3

    Put the rest in Other

    Some of it belongs there: a legal requirement, a customer demand, a repair. The point is not that Other is empty; it is that Other is visible and chosen.

  4. 4

    Review Other monthly

    For each item: link it to a goal it genuinely serves, stop it, or keep it and say why. A list that grows every month means the goals are not the ones the plant is actually working on.

What goes wrong

Cascading goals anti-patterns

  • The copied goal

    The company goal appears word for word on every facility scorecard. Nobody translated it, so nobody owns it. A facility's version names its lines and its share of the number.

  • The cascade that stops at the plant manager

    Goals reach the plant leadership team and stay there. The floor sees the same posters as last year. Cascade at least to the department, and name the person for each key result.

  • Shares that do not add up

    Three plants each take a 20% cut on a company goal of 33%, and the gap is found in December. Add the facility targets before the goals are fixed; if they fall short, catchball is not finished.

  • Alignment by relabelling

    Every existing project is tagged to a goal the week before the review. The Other list is empty and nothing has changed. Alignment means some work stopped.

  • Too many levels

    Company, region, division, plant, department, cell, person: by the sixth level the goal has been rewritten six times and means something different at each. Four levels, and a person who can see the company goal from their own.

  • Catchball with no reply date

    The draft goes down and comes back when it comes back, which is after the year has started. Set a reply-by date two to three weeks out and fix the goals the week after it.

Keeping it alive

What does the monthly review rhythm look like?

One rhythm with four beats a month: the KPIs close in the first week; departments review their goals in the second; the plant reviews in the third, against the bowling chart; the company reviews in the fourth. Each review passes up only what it cannot fix. Quarterly, the company steps back and asks whether the goals are still the right ones.

  1. Week 1KPI owners

    The month closes: every KPI gets its actual against plan.

    Passes up: Nothing yet; the numbers are made ready.

  2. Week 2Departments and teams

    Their own goals and key results, red or green, and the countermeasure for each red.

    Passes up: A red the department cannot fix alone.

  3. Week 3Plant leadership

    The bowling chart for the plant and each department's reds, plus the Other list.

    Passes up: A goal the plant will miss for the year, with its reason.

  4. Week 4Company leadership

    Goals by facility: which plant is Met, which is Missed, which has missed two months running.

    Passes up: Nothing; this is where the decision is made.

Four beats a month. Each review passes up only what it cannot fix.

Every quarter, the company review adds a step back: are these still the right goals, and is the Other list telling us something? Changes to a goal are made here, with the reason written down, and nowhere else. The hoshin kanri review cycles post covers the monthly and quarterly reviews in depth, and the tiered meetings page covers the daily and weekly meetings underneath them.

Sources

In LeanSuite

Cascading goals in LeanSuite

LeanSuite's Strategy module is built around this cascade.

  1. Four levels, one starting point

    Everything starts from the company's OKRs, X-matrix or hoshin kanri plan, then cascades to each facility, then to each department or team, then to the individual person.

  2. A cascade with a reply-by date and three replies

    A company goal is cascaded to the facilities you choose, or from a facility to its teams, with a message and a reply-by date. Each one replies: adopt it as written, write its own version (a goal of its own with the company goal as its parent) or mark it not applicable and say why. Requests show as pending or answered.

  3. Goal health, by facility

    Goal health is a grid of company goals by facility for the last closed month, each cell Met, Missed, No facility KPI or Not judged, with counts of goals missed this month, missed two or more months in a row and goals without a KPI.

  4. Initiatives connected to the goal they serve, or in Other

    Kaizen projects are tagged to the goal they serve, and a goal lists the projects, work orders, best practices and issues that support it. An initiative that serves no company goal goes in Other, so everyone can see whether they are working on something the company chose.

A company goal, Deliver on time, in full, measured by On-time in-full delivery (OTIF) %, cascaded to three facilities. Plant 1 adopted it as written, Plant 2 wrote its own version and Plant 3 marked it not applicable.

2026 goals: company goalPublished
DeliveryDeliver on time, in full
Measured by
On-time in-full delivery (OTIF) %
Owner
Operations director
Why it matters
Late and short deliveries are the complaint our largest customers raise most.
Cascaded to 3 · 3 of 3 repliedReply by 16 January
  • Plant 1Adopt as written

    Uses the company goal unchanged, measured by the same KPI.

  • Plant 2Write own version

    Deliver on time, in full from the finished goods warehouse

    A facility goal with the company goal as its parent. Recommended.

  • Plant 3Not applicable

    This site ships only to the other two plants, so customer OTIF does not apply here.

An example with sample data.
  • Adopt as written
  • Write own version
  • Not applicable

See it on your own goals

Try the interactive demo in your browser with sample data, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.

FAQ

Questions about cascading goals and alignment

  1. Cascading goals is the practice of translating a company goal into a goal for each level below it: company to facility, facility to department or team, department to person. Each level keeps the measure it can move and its share of the number, so the facility targets add up to the company target and a person can trace their key result back to the company goal.

  2. Cascading is the top-down handoff: a goal goes down and each level takes its share. Alignment is the state you want at the end: every goal and every initiative links to a company goal, whichever direction it was written in, and the work that does not is visible in an Other list. You can cascade without aligning (copied goals) and align without cascading (bottom-up goals that are linked up).

  3. Catchball is the back-and-forth that turns a cascade into an agreement. Leaders send a draft goal down with a reply-by date; each level replies with what it can commit to, what it needs, or why the goal does not apply; leaders adjust the goal or find what is missing; and it goes round until every target has an owner who agreed to it. It comes from hoshin kanri.

  4. Four for most manufacturers: company, facility, department or team, person. Each level translates the goal into its own words and its own number. With more levels the goal gets rewritten too many times and the person at the bottom can no longer see the company goal from their own.

  5. Both, in that order. The company sets the few goals for the year and the KPI for each; facilities and departments write their own version, propose their own goals and say what they need. Catchball is where the two meet. Pure top-down produces compliance; pure bottom-up produces departments pulling the same line in two directions.

  6. List every live initiative, project and kaizen and ask which company goal each one serves. Anything with no answer goes in Other. Review the Other list every month: link each item to a goal it genuinely serves, stop it, or keep it and say why. A long or growing Other list means the plant is busy on things nobody chose.

  7. Yes, at the quarterly step back, with the reason written down, and not at the monthly review when a number goes red. A red month gets a countermeasure, not a smaller target. If the target was wrong, say so once, at the step back, and record why, so the miss is not hidden.

  8. The company goal for the year and its KPI stay fixed. Each facility and department writes quarterly OKRs that are its step toward that goal: an objective in its own words and key results using the same KPI, with a baseline and a quarter-end target. The person level owns one or two key results. The OKR guide works through eight examples this way.

  9. In LeanSuite everything starts from the company's OKRs, X-matrix or hoshin kanri plan, then cascades to each facility, then to each department or team, then to the person. A company goal is cascaded to chosen facilities, or from a facility to its teams, with a message and a reply-by date. Each one adopts it as written, writes its own version with the company goal as its parent, or marks it not applicable. Goal health shows the goals by facility as Met or Missed each month, kaizen projects are tagged to the goal they serve and an initiative that serves no goal goes in Other.