Skip to content
LeanSuite

Strategy module

Strategy deployment software: from the X-matrix to every person's work, judged every month

Short answer

LeanSuite's Strategy module takes the year's goals from OKRs, an X-matrix or hoshin kanri, cascades them to every plant, team and person, ties each initiative to the goal it serves (or to Other), and shows Met or Missed from the KPI every month.

Last updated:

An example with sample data. A concept animation, not a screen recording. Silent, 17 seconds, loops.

The problem

Five goals on the whiteboard in January, two of them done by December

Today

  • The plan is a photo of a whiteboard

    By March the photo is the plan, and nobody updates a photo.

  • Nobody on the floor can say which goal their project serves

    Goals in a deck, projects in a tracker, KPIs in Excel.

  • We set five things and execute two

    Nobody saw the other three slip while there was still time.

With LeanSuite

  • One X-matrix, cascaded to every plant, team and person

    Each goal has its KPI and a reply-by date. Every level replies.

  • Every initiative is tied to a goal, or lands in Other

    Work that serves no goal goes in Other, where everyone can see it.

  • A monthly verdict and a meeting built on it

    Met or Missed from the KPI, and a leadership review built on it.

Start from what you already use

OKRs, an X-matrix or hoshin kanri: the year starts on one page

Each objective becomes a goal measured by a KPI. Everything below works the same, whatever you call it.

  • Hoshin kanri and the X-matrix

    The few initiatives that matter, on one page, agreed through catchball.

    In LeanSuiteThe X-matrix is the company's page for the year. Every annual objective is a goal measured by a KPI.

  • OKRs

    An objective with measurable key results, set per cycle.

    In LeanSuiteWrite each objective as a goal and pick its KPI. The monthly Met or Missed is the grade.

  • KPIs and the bowling chart

    The numbers the plant already runs, plan against actual.

    In LeanSuiteA goal is measured by the plant's own KPI, so nothing is typed twice.

The X-matrix in LeanSuite

One page per year, read clockwise from the bottom

  1. Breakthrough objectives3 to 5 year objectives (Bottom)
  2. Annual objectivesThis year's goals and their KPIs (Left)
  3. Improvement prioritiesKaizens and projects that move them (Top)
  4. Targets to improveKPIs and targets (Right)
  • Strong and Weak links
  • Measured by a KPI
  • Lead and Support people
  • Select an item to see what it connects to

Hoshin kanri guide · Free X-matrix template

The cascade

Company, facility, department, person: every level gets the goal and answers it

Each level replies by a date, and its answer becomes a goal of its own with the parent attached. That is catchball, run as a reply (method).

  1. Company

    Level 1: The year's goals on the X-matrix

    Owner, pillar, KPI. Draft until published.

  2. Facility

    Level 2: Cascaded with a reply-by date

    Each plant replies by a date.

  3. Department or team

    Level 3: A facility goal cascades on to its teams

    The same three replies, one level down.

  4. Person

    Level 4: Down to the individual

    Every goal ends with a name on it.

A company goal, Deliver on time, in full, measured by On-time in-full delivery (OTIF) %, cascaded to three facilities. Plant 1 adopted it as written, Plant 2 wrote its own version and Plant 3 marked it not applicable.

2026 goals: company goalPublished
DeliveryDeliver on time, in full
Measured by
On-time in-full delivery (OTIF) %
Owner
Operations director
Why it matters
Late and short deliveries are the complaint our largest customers raise most.
Cascaded to 3 · 3 of 3 repliedReply by 16 January
  • Plant 1Adopt as written

    Uses the company goal unchanged, measured by the same KPI.

  • Plant 2Write own version

    Deliver on time, in full from the finished goods warehouse

    A facility goal with the company goal as its parent. Recommended.

  • Plant 3Not applicable

    This site ships only to the other two plants, so customer OTIF does not apply here.

An example with sample data.

What a facility goal carries

  • Parent goal
  • Why it matters, owner, pillar
  • Measured by a KPI
  • January to December, target vs actual
  • Team and person goals below it
  • Linked projects, work orders and best practices

Work tied to a goal

Is the thing I am working on moving a company goal?

28%

of the executives and middle managers responsible for executing strategy could list three of their company's strategic priorities

LeanSuite connects each initiative to the goal it supports. Work that supports none goes in Other, where everyone can see it.

Source: Sull, Sull and Yoder, No One Knows Your Strategy, Not Even Your Top Leaders, MIT Sloan Management Review, 12 February 2018 (124 organizations, 4,012 respondents).

One person's initiatives

Connected to
  • Cut changeover time on Line 3DeliveryDeliver on time, in full
  • Replace the guard interlock on Line 3SafetyCut the recordable injury rate
  • Stop pallet label mix-upsQualityRaise first-pass yield
  • Repaint the break roomOtherNot connected to a company goal
An example with sample data. The goals are the same three the cascade above carries; the fourth initiative serves none of them, so it sits in Other.
  • For the person

    See the goal behind every initiative.

  • For the plant

    Projects read against plant goals, then company goals.

  • For leadership

    Other is a list the review can read.

Judged every month

Met or Missed from the KPI, and one grid that shows where it slipped

Nobody types a status. The review starts from this grid: goals by plant, for the last closed month.

Goal health

Last closed month
  • 2Missed this month
  • 1Missed 2+ months in a row
  • 1Goals without a KPI
  • SafetyCut the recordable injury rateMeasured by Recordable injury rate (TRIR), all sites
    Plant 1Met
    Plant 2Met
    Plant 3Missed2 months, missed this month and the month before
  • QualityRaise first-pass yieldMeasured by First-pass yield %, all sites
    Plant 1Missed
    Plant 2Met
    Plant 3Met
  • DeliveryDeliver on time, in fullMeasured by On-time in-full delivery (OTIF) %
    Plant 1Met
    Plant 2No facility KPI
    Plant 3Met
  • CostCut scrap costNo KPI attached
    Plant 1Not judged
    Plant 2Not judged
    Plant 3Not judged
An example with sample data. A cell with a red ring missed this month and the month before; a goal with no KPI shows Not judged until one is attached.

Leadership meetings

The review, prepared before anyone sits down

An example with sample data. A concept animation, not a screen recording. Silent, 13 seconds, loops.
  • Your own schedule

    Its own schedule, above the daily tiers.

  • The KPIs reviewed, with their owners

    The agenda is the goals' own numbers.

  • A reporting order

    Everyone knows their slot.

  • Prepared in the system

    Presenters write up their part first.

The huddles below it run as tiered meetings on Lean Studio boards

Home pages by persona

A simpler home page for operators, a decision page for leadership

  • Operators

    A simpler home page for the people who run the line.

  • Leadership

    A home page built around decisions.

Individual goals

A goal with a person's name on it, next to the work

Each goal sits with a person and the initiatives they work on for it. The module does not run performance reviews, one-to-ones or pay; people development lives in the skills matrix and training.

FAQ

Strategy deployment software: buyer questions

  1. Strategy deployment software holds a company's goals for the year, carries them down to each plant, team and person, and tracks every month whether each goal is being met. In LeanSuite the year's objectives sit on an X-matrix, each goal has an owner, a pillar such as Safety, Quality, Delivery, Cost or People, a Why it matters statement and the KPI it is measured by. A goal is cascaded with a reply-by date, each level replies, each initiative a person works on is connected to the goal it serves, and every month the goal shows Met or Missed from its KPI.

  2. Yes, and most plants that try end up doing so. Hoshin kanri sets the three to five year breakthroughs and this year's objectives through catchball; OKRs give a team a measurable objective for the cycle; KPIs and the bowling chart track ongoing health. They are three vocabularies for one thing: the few goals that matter, carried to every level and checked on a cadence. In LeanSuite you start from whichever you use. The objectives sit on the X-matrix, each one is a goal measured by a KPI, and the cascade, the replies and the monthly verdict are the same whatever you called the goal.

  3. A KPI tracks the ongoing health of a process: first-pass yield, OTIF, the recordable injury rate, every month, for years. An OKR describes a change you want in a cycle: raise first-pass yield to a new level by year end. The two meet when the key result is measured by the KPI. That is how LeanSuite works: a goal is the change, the KPI it is measured by is the number, and once the month closes the goal shows Met or Missed from that KPI.

  4. Use the X-matrix when leadership plans the year as a whole: it puts the breakthrough objectives, the annual objectives, the improvement priorities and the KPI targets on one page with the correlations and the owners between them. Use OKR wording when a team needs one objective and a few measurable results for the cycle. In LeanSuite the X-matrix is the company's page per year, read clockwise from the breakthrough objectives at the bottom, and every annual objective on it is a goal that cascades and is measured by a KPI, so a team that writes its own version in OKR words is still linked to the matrix through its parent goal.

  5. Cascade this goal asks who should act on it, the facilities or, from a facility goal, that plant's teams, and when, with a reply-by date and a message. The goal then shows how far the cascade has got, for example cascaded to two facilities, two of two replied. Each facility sees the request under My goals, pending until it answers, and a facility goal cascades on to its teams the same way. From there the goal goes down to the individual person.

  6. Catchball is the back and forth that makes a cascade two-way: the level above proposes a goal, the level below says how it will take it on, and the plan improves on the way down. In LeanSuite it is each level's reply to a cascaded goal: adopt the goal as written, write its own version, which creates a goal with the parent goal attached and is the recommended reply, or mark the goal not applicable and explain why. Requests show as pending or answered, so leadership sees who has not replied yet.

  7. As people work on their initiatives, each one is connected to the company goal it supports. An initiative that serves no company goal goes in Other. That is the point of the module: everyone, the person doing the work and the leaders reviewing it, can see whether the work is moving something the company set out to do.

  8. The cascade runs from the company to the facility, the team and the individual person, so each goal ends with someone's name on it and the initiatives they work on for it show the company goal they serve. The Strategy module does not run performance reviews, one-to-ones or pay from those goals. People development in LeanSuite lives in the skills matrix and the training module.

  9. From its KPI. Once a month closes, the goal shows Met or Missed for that month, and the current month shows the results so far. The goal's page carries a January to December table of target versus actual with a tick or a cross per month and year to date. A goal with no KPI attached cannot be judged, which is why Goal health counts goals without a KPI.

  10. A grid of company goals as rows and facilities as columns for the last closed month. Each cell reads Met, Missed, No facility KPI or Not judged. Three counts sit above it: missed this month, missed two or more months in a row, meaning facility KPIs that missed this month and the month before, and goals without a KPI.

  11. The review starts from the Goal health grid and the goals' own KPIs. Leadership sets up its own meeting schedule; the meeting links the KPIs it reviews and their owners, in a reporting order, and the people speaking prepare their part in the system before the meeting. A red KPI opens an action, an A3 or a project from the same screen, so the decision and the follow-up are recorded where the number lives.

  12. Excel holds the X-matrix well for one person on one day. It cannot cascade a goal with a reply-by date and collect the replies, it cannot link a person's initiative to the goal it serves, and the monthly Met or Missed has to be typed in by whoever remembers. Each plant ends up with its own sheet in its own words, and the review becomes a round of emails. In LeanSuite the goal, its KPI, the replies, the initiatives and the verdict are one record, the same one the huddle boards and the bowling chart already use.

  13. The KPIs behind the goals are the plant's own KPIs, with KPI trees that roll up from department to plant to company, KPI boards and the bowling chart. A red KPI opens an action, an A3 or a project, kaizen projects are tagged to the goal they serve, and a fix that worked at one site can be shared as a best practice with the others, with adoption tracked.

Want the year's goals, every person's work and the plant's KPIs on the same page?

Bring your goals, as OKRs, an X-matrix or a whiteboard photo, and we will show how they cascade to each plant, team and person, how the replies come back and what Goal health shows at month end.