Inspection template in the LeanSuite app
Last reviewed
Net content and weight checklist
Check that packs meet the declared net content or weight.
The full question list
The 10 questions in the inspection
Every question is answered Yes, No or N/A. Each No is flagged and asks for a photo and a comment, so the finding arrives with its evidence.
Equipment
- 1The scale is level, clean and verified with a test weight
- 2The scale is in calibration
- 3The check is done by a trained person
Sampling
- 4The sample size and frequency follow the plan
- 5Samples are taken across the run and from all heads or lanes
- 6Pack weight includes or excludes packaging as the procedure says
Results
- 7Average and individual weights are within limits
- 8Results are recorded on the chart or log
- 9Out-of-limit results led to adjustment and a recheck
- 10Product since the last good check was held if needed
When to use it
- Every day, before first use or at the start of the shift.
- The person responsible for the area or equipment answers each question on the spot.
- Each record starts with: Product, Line.
How it is scored
The template is built with points per answer and a pass mark of 90. In this library every audit is set to pass at 80 and every inspection at 90. Each submitted inspection shows its score and pass or fail, and every No is flagged with its photo and comment.
Change the points or the pass mark after you clone it. How rules and scoring work.
Read and print
More in quality and food safety
- Product weight check audit checklist8 questions
- Battery manufacturing dry room checklist5 questions
- Cleanroom pressure differential checklist6 questions
- Cold chain vehicle temperature checklist6 questions
- Cold storage temperature checklist11 questions
- Customer audit readiness checklist6 questions
Use this template in LeanSuite
It is ready in the Template Marketplace inside Lean Creator as “Net Content and Weight Check”. Clone it into your plant, change any question, then schedule it to a person, role or asset with reminders. Auditors complete it on a phone or tablet, with photo evidence where required.
Not on LeanSuite yet? On a 90-day pilot our team sets up your account and digitizes the forms and checklists you use today, this one included.

