Skip to content
Try LeanSuite for 90 days for $3,000
LeanSuite - Lean Manufacturing Software

Free tool

First pass yield (FPY) calculator

First pass yield (FPY) is the share of units that get through a process step right the first time, with no rework, repair or scrap. Rolled throughput yield (RTY) multiplies the FPY of every step together: the chance that a unit gets through the whole process without a single fix.

FPY (each step)equalsUnits passed first time divided by Units in × 100

RTYequalsFPY step 1 × FPY step 2 × … × FPY step n

A unit that fails, is reworked and then passes is not a first-pass unit. Final yield, which counts reworked units as good, hides that rework.
Units at each process step, in order
  1. Step 1
  2. Step 2
  3. Step 3
  4. Step 4

Pre-filled with the worked example. Passed first time means no rework, repair or scrap at that step; a reworked unit that later passes does not count.

Rolled throughput yield

81.3%

Of every 100 units started, about 81.3 get through all 4 steps with no rework or scrap.

Lowest step

Step 2

90.0% first pass yield

Reworked or scrapped

200 units

Across all steps

First pass yield by step

Step 195.0%
Step 290.0%
Step 398.0%
Step 497.0%

Email me my results

Optional. Get these inputs and results in your inbox, with a link back to this calculator.

We may follow up about LeanSuite. See our Privacy Notice.

How to calculate it

Count what went right the first time

For each step, count the units in, every unit that entered the step in the period, and the units passed first time, the ones that needed no rework, repair or scrap there. Their ratio is that step's first pass yield.

Multiply the step yields together for the rolled throughput yield. Steps that each look fine on their own can still leave a low RTY, because the losses compound: a unit has to survive every step.

The step with the lowest FPY is usually the place to start, and a root cause analysis there pays off fastest. To put a money value on the rework and scrap, use the cost of poor quality calculator.

Worked example

Illustrative numbers, not a benchmark

A four-step process handles 1,000 units at each step. First time through, 950 pass step 1, 900 pass step 2, 980 pass step 3 and 970 pass step 4.

  1. 1FPY step 1 = 950 ÷ 1,000 = 95%. Step 2 = 900 ÷ 1,000 = 90%.
  2. 2FPY step 3 = 980 ÷ 1,000 = 98%. Step 4 = 970 ÷ 1,000 = 97%.
  3. 3RTY = 0.95 × 0.90 × 0.98 × 0.97 = 0.8128 = 81.3%.
Rolled throughput yield is 81.3%: about 19 of every 100 units need rework or are scrapped somewhere, although no single step is below 90%. Step 2, at 90%, is the one to fix first.

Embed this calculator

Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.

<iframe src="https://www.theleansuite.com/tools/first-pass-yield-calculator/embed" title="First pass yield (FPY) calculator by LeanSuite" width="100%" height="1580" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/first-pass-yield-calculator">First pass yield (FPY) calculator</a> by LeanSuite</p>

FAQ

First pass yield (FPY) calculator: common questions