Free tool
First pass yield (FPY) calculator
First pass yield (FPY) is the share of units that get through a process step right the first time, with no rework, repair or scrap. Rolled throughput yield (RTY) multiplies the FPY of every step together: the chance that a unit gets through the whole process without a single fix.
FPY (each step)equalsUnits passed first time divided by Units in × 100
RTYequalsFPY step 1 × FPY step 2 × … × FPY step n
Pre-filled with the worked example. Passed first time means no rework, repair or scrap at that step; a reworked unit that later passes does not count.
Rolled throughput yield
81.3%
Of every 100 units started, about 81.3 get through all 4 steps with no rework or scrap.
Lowest step
Step 2
90.0% first pass yield
Reworked or scrapped
200 units
Across all steps
First pass yield by step
How to calculate it
Count what went right the first time
For each step, count the units in, every unit that entered the step in the period, and the units passed first time, the ones that needed no rework, repair or scrap there. Their ratio is that step's first pass yield.
Multiply the step yields together for the rolled throughput yield. Steps that each look fine on their own can still leave a low RTY, because the losses compound: a unit has to survive every step.
The step with the lowest FPY is usually the place to start, and a root cause analysis there pays off fastest. To put a money value on the rework and scrap, use the cost of poor quality calculator.
Worked example
Illustrative numbers, not a benchmarkA four-step process handles 1,000 units at each step. First time through, 950 pass step 1, 900 pass step 2, 980 pass step 3 and 970 pass step 4.
- 1FPY step 1 = 950 ÷ 1,000 = 95%. Step 2 = 900 ÷ 1,000 = 90%.
- 2FPY step 3 = 980 ÷ 1,000 = 98%. Step 4 = 970 ÷ 1,000 = 97%.
- 3RTY = 0.95 × 0.90 × 0.98 × 0.97 = 0.8128 = 81.3%.
Embed this calculator
Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.
<iframe src="https://www.theleansuite.com/tools/first-pass-yield-calculator/embed" title="First pass yield (FPY) calculator by LeanSuite" width="100%" height="1580" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/first-pass-yield-calculator">First pass yield (FPY) calculator</a> by LeanSuite</p>How LeanSuite helps
LeanSuite lets you log quality issues from the floor, trace each one to its root cause and follow the corrective action through to closure.
See Quality ImprovementFAQ
First pass yield (FPY) calculator: common questions
More free lean tools
All tools- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Cost of poor quality (COPQ) calculatorTotal COPQ and cost of quality, and each as a share of revenue, from the four quality cost categories.
- Process capability (Cp, Cpk) calculatorCp and Cpk against your specification limits, plus Pp and Ppk from pasted measurements, with a distribution chart.
- MTBF and MTTR calculatorMean time between failures, mean time to repair and availability from operating time, failures and repair time.
- Lead time calculatorManufacturing lead time from WIP and throughput (Little's Law), and the share of it that adds value.
- Manufacturing ROI calculatorAnswer a few questions about your shop floor, shifts and downtime to estimate your potential ROI with LeanSuite.