Integrations: Connect LeanSuite to the systems your plant already runs
Machines, MES and ERP, the spreadsheets your team fills in, the BI reports your analysts built, and your company sign-in. The data comes in, and LeanSuite is where the plant acts on it.
What it connects to
Six ways data gets in
Machines and production systems
- PLCs
- MES
Stops, counts and downtime come straight from the line, so nobody types them. Each connection is set up for your plant and your equipment.
ERP
- Your ERP, by API
Connected case by case. For example, a purchase order received in the ERP can trigger the right incoming inspection, and ERP figures can feed your KPIs.
Feeds: Supplier Quality, KPI Dashboards
Spreadsheets and files
- Excel on SharePoint or OneDrive
- Google Sheets
- CSV upload
Keep the sheet you already fill in. KPI values are read from it, and data in a database or a spreadsheet can be pulled in on a schedule.
Feeds: KPI Dashboards, SQDC boards
BI reports
- Power BI
- Looker Studio
Embed the reports your analysts already built on the boards your teams use every day, next to their actions.
Feeds: Lean Studio, Tiered Meetings
Sign-in
- Microsoft Entra ID
- Okta
Single sign-on, so people use the company login they already have.
Feeds: Security & trust
People
- Bulk upload from a template
Admins load users and managers from a template, and add skills in bulk, so a large plant is set up in one go.
Feeds: Competency Management, Trainings (LMS)
Where LeanSuite fits
Not an ERP or an MES. The place the plant acts.
Your ERP and MES record what happened. LeanSuite is where people decide what to do about it, every shift.
| System | Its job | With LeanSuite |
|---|---|---|
| ERP | Orders, inventory, costs and finance | Uses ERP data where it helps, for KPIs, costs and inspections |
| MES | Running and tracking production orders on the line | Takes counts, stops and downtime from it |
| BI tools | Analysis and reporting across the business | Shows those reports on the daily boards |
| LeanSuite | The daily lean work: issues, checks, audits, KPIs and meetings, improvement projects, skills and standard work | Where the plant acts on what the data shows |
Setting up a connection
Three steps, one line at a time
Tell us the system and the data
Which system, which numbers, and which LeanSuite module should use them.
We set up the connection
For your plant, your equipment and your IT rules.
Check it on one line
You confirm the numbers on one line or area before it goes plant-wide.
FAQs
Integrations
Yes. LeanSuite can connect to your PLCs, set up case by case for your plant, so stops, counts and downtime come in without anyone typing them. Operators can still log a stop with a tap where there is no connection.
Yes, by API, set up case by case. For example, a purchase order received in the ERP can trigger the right incoming inspection, and ERP figures can feed your KPI dashboards.
Yes. MES data such as counts, stops and downtime can feed LeanSuite, set up for your plant. LeanSuite does not replace your MES; it is where the team acts on what the data shows.
No. LeanSuite runs the daily lean work: issues, checks, audits, KPIs and meetings, improvement projects, skills and standard work. It connects to your ERP and MES rather than replacing them.
Yes. KPI dashboards read from Excel on SharePoint or OneDrive, Google Sheets and CSV uploads, and Power BI or Looker Studio reports can be embedded on your boards.
Admins bulk upload users and managers from a template, and people sign in with single sign-on through Microsoft Entra ID or Okta. Ask us about connecting your HR system.

