Environment poster
Updated · Free to print and share
Compressed air leak load test poster
The simplest way to measure compressed air leakage is the load test from the US Department of Energy's compressed air sourcebook: with no production using air, time how long the compressor runs on load and off load over a few cycles. Leakage as a share of output is on-load time × 100 ÷ (on-load + off-load time). This poster sets out the test and works one example: three minutes on load and seven off is 30% leakage, where the DOE says a well-maintained system should lose under 5 to 10%.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Three steps for the test, a worked example from on-load and off-load minutes to 30% leakage, and the DOE target.The words on the poster
How much air leaks?
The load test: run it with no production, before and after a leak walk.
The test
- Stop every air user Nothing should need air. Keep the system pressurised.
- Time the compressor Minutes on load and off load, over several cycles. Average them.
- Work it out Leakage % = on-load time × 100 ÷ (on-load + off-load time).
Worked example
- 3 min on load
- 7 min off load
- 3 × 100 ÷ 10 = 30%
- Well-maintained systems leak under 5 to 10% of output (US DOE). Find the leaks, fix them, test again.
Method and target after the US DOE compressed air sourcebook. Example figures; for load and unload compressors.
On the floor
How to use it
Putting the Compressed air leak load test poster to work
- 1
Run the test on a weekend or a planned stop, before and after a leak walk.
- 2
Post the result next to the poster, and re-test each quarter.
- 3
If the compressor modulates instead of loading and unloading, ask maintenance for the pressure-decay test instead.
- 4
Pair it with the air and water leaks poster and the free compressed air leak survey log.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
The worked figures are an example. The load test fits compressors with load and unload control; for other controls the sourcebook describes a pressure-decay method. Under 5 to 10% is the DOE's level for a well-maintained system; poorly maintained systems can lose 20 to 30%.
Templates, decks and guides to go with it
- Compressed air leak survey logWalk sheet, printable leak tags and a tracker that puts an annual cost on every leak and follows it to a verified fix.
- Energy use and EnPI trackerMonthly electricity, gas and fuel in one unit, a 12-month regression baseline, expected against actual energy for each month, an EnPI ratio, the running saving and the tests that say whether the model can be trusted.
- TPM tag logEvery abnormality tag with type, who fixes it, priority and dates, with days open and counts by type and week.
- Topic: Lean manufacturing fundamentalsEvery guide we have on the subject, sorted.
- Topic: TPM and maintenanceEvery guide we have on the subject, sorted.
Terms on this poster
More environment posters
All posters
Waste hierarchy poster
Energy waste at work poster
Spill response poster
Waste segregation poster (bin colours)
Compressed air and water leaks poster
Green lean poster: the 8 wastes and the environment
Weekend shutdown energy checklist poster
Compressed air: the right tool poster
Water saving at work poster
Hazardous waste storage rules poster
Green purchasing poster: four questions
Environmental aspects and impacts poster
kW and kWh poster: power and energy
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo