Practical guide · TPM and maintenance
Preventive vs predictive maintenance, and the other types, explained
Short answer
Preventive maintenance is work done on a fixed schedule, by time or by usage, to stop equipment failing. Predictive maintenance is work done when the measured condition of the equipment shows it is wearing out. Reactive maintenance waits for the failure. Planned maintenance means the work is prepared ahead, and autonomous maintenance and total productive maintenance (TPM) share the care with operators. You choose per machine, not per plant.
Last updated:
Preventive vs predictive maintenance in one table
The difference is the trigger. Preventive maintenance starts because the calendar or a usage count says it is due. Predictive maintenance starts because a reading, such as vibration, temperature or oil condition, says the part is deteriorating.
| Type | What it is | What triggers the work | When it fits | Illustrative example | Cost profile |
|---|---|---|---|---|---|
| Reactive | Fix it after it breaks, also called run to failure | The breakdown itself | Cheap, non-critical items that are easy to replace | Replacing a failed indicator lamp | Low upkeep cost, but each failure is unplanned and often rushed |
| Preventive | Inspect, lubricate, adjust or replace parts at set intervals | Time or usage, such as monthly or after a set run count | Wear that follows a steady pattern and is cheap to service | Greasing a gearbox and changing its filter every quarter | Steady, predictable spend, with some parts changed early |
| Predictive | Service the machine when its measured condition says it is needed | A reading that crosses an agreed limit | Critical assets where failure gives warning and a reading is practical | Replacing a bearing when its vibration trend climbs | Needs readings and skill to interpret them, but parts last longer |
| Planned | Any maintenance that is prepared in advance: job, parts, tools, people and time | A schedule or a finding, then preparation before the stop | Every strategy above except pure run to failure | A crew with the parts staged for a Saturday shutdown | Shorter stops and fewer rush orders |
| Autonomous | Operators clean, inspect, lubricate and tighten their own machines | A daily routine and what the operator notices | Every machine with an operator on it | Wiping down a filler, then tagging a small leak | Little spend, mostly time, and it frees technicians for harder work |
| TPM | A plant-wide system that makes operators, maintenance and management jointly responsible for equipment | Its pillars, such as autonomous and planned maintenance | A plant that wants fewer breakdowns, small stops and defects together | Operators on daily care, technicians on planned work | An investment in routines and training, repaid over time |
Planned maintenance is not a rival to the others. It is how you organise them: preventive and predictive tasks, and repairs you can see coming, are all planned when the work is prepared before the machine stops. The preventive vs predictive differences post goes into each in depth.
Why preventive maintenance is important
Preventive maintenance is important because it turns a surprise into a scheduled job. A planned stop at a convenient time costs less than a breakdown in the middle of an order, and it catches wear while the repair is still small.
The cost is that some parts get changed a little early. The benefits of preventive maintenance post covers them. To start a routine, the preventive maintenance checklist gives you tasks, frequencies and sign-off.
Planned maintenance and planned downtime, with examples
Planned maintenance is maintenance prepared before it starts, with the steps, parts, tools, skills and time worked out. Planned downtime is the stop that goes with it: time a machine is deliberately stopped on a schedule. Because it is known in advance, the production plan can allow for it.
- Scheduled preventive maintenance, such as a lubrication and inspection round.
- Changeovers between products.
- Cleaning stops, trials and breaks that stop the line.
Plants decide for themselves which of these count against OEE, so write the rule down and apply it everywhere. See what is planned downtime and what is planned maintenance, and how the rule feeds the OEE calculation. Planned downtime is the opposite of unplanned downtime, which is the stop nobody scheduled; reducing machine downtime shows how to attack that.
Autonomous maintenance and TPM
Autonomous maintenance is the TPM pillar in which operators take on basic care of their own machines: cleaning, inspecting, lubricating and tightening, and reporting anything abnormal. It is usually introduced in seven steps, starting with an initial clean. The routine is often shortened to CILR, for clean, inspect, lubricate, retighten. Start with the autonomous maintenance checklist, and see the autonomous maintenance page and the seven steps post.
TPM is total productive maintenance: the plant-wide approach that makes operators, maintenance and management jointly responsible for keeping machines in top condition. It is organised in pillars, and OEE is its usual measure of progress.
People often search for "total preventive maintenance". The method is called total productive maintenance. Preventive maintenance is one of the tools inside it. The total productive maintenance post covers the pillars, and the TPM software guide shows what to look for in a tool for each pillar.
How to choose a strategy for each machine
Choose by asset, using three questions. How much does it hurt if this machine stops? How does it usually fail? What does it cost to look after? Rank your machines first with the equipment criticality analysis.
- 1
Rank by criticality
Ask what stops if this asset stops: the line, the customer order, safety, quality. Put the machines that stop the most at the top.
- 2
Look at how it fails
If wear follows time or usage, a schedule works. If failure gives warning in a reading you can take, predictive work fits. If failure is random with no warning, neither helps much, so keep a spare and fix it fast.
- 3
Weigh the cost of failure against the cost of care
Spend more care where a failure is costly and less where it is cheap. A cheap, non-critical part can run to failure on purpose.
- 4
Review after each failure
A failure that surprised you means the strategy for that machine was wrong. Change it and record why.
An illustrative example: one packaging line
This example is made up. A packaging line has three machines that matter and each gets a different answer.
| Machine | How it matters | How it fails | Strategy |
|---|---|---|---|
| Guide rail motor | Cheap, and a spare sits on the shelf | Without warning, rarely | Reactive: swap it when it fails |
| Gearbox on the main conveyor | Stops the whole line | Wears steadily with running time | Preventive: lubricate and inspect on a schedule, change the filter on a set interval |
| Main drive bearing | Stops the line and takes a day to replace | Gets noisy and hot before it fails | Predictive: take readings on a route, plan the change when the trend climbs |
On all three, the operator does the daily CILR check and tags what looks wrong. The team then prepares each job, which makes the work planned. A record of readings and findings can be kept on the condition monitoring route sheet and the weekly maintenance schedule.
Common mistakes
- Using one strategy for the whole plant. Different machines fail in different ways.
- Treating predictive as better in every case. It adds cost and skill, and a cheap asset does not need it.
- Servicing on a calendar a machine does not follow, so parts are changed early or failures still arrive between visits.
- Not logging stops with a reason, so there is no evidence to pick a strategy. The equipment downtime log is a place to start.
- Never reviewing. A strategy chosen once and never checked drifts out of date.
LeanSuite covers the operator side and the loss side of this: its autonomous maintenance checklists and its loss and cost views. It does not diagnose machines for you; the readings are taken and entered by your team.
Go deeper
This page is the short version. These guides cover each part in full.
- Preventive vs Predictive Maintenance: Key DifferencesA longer comparison of the two, with how each is set up and where each goes wrong.
- What are the Benefits of Preventive Maintenance?The benefits of a preventive program and what it costs, beyond the summary here.
- Planned Maintenance: Optimization Strategies for ReliabilityHow planned maintenance is organised and how it sits inside TPM.
- Planned Downtime: What it is, the BenefitsWhich stops count as planned and how the rule affects your availability figure.
- Autonomous Maintenance: The Seven-Step ProcessEach of the seven steps in turn, from the initial clean to autonomous management.
- Total Productive Maintenance: A Complete Manufacturing GuideThe pillars of TPM and how to start, which this page only introduces.
All our articles on this subject are in the tpm and maintenance topic.
Free templates and tools
- Preventive maintenance checklist templateA PM checklist per machine with readings and sign-off, and a PM schedule that works out the next due date.
- Autonomous maintenance (CILR) checklist20 clean, inspect, lubricate and retighten checks with a box per day, an abnormality log and sign-off.
- Equipment criticality analysisAssets scored 1 to 5 on six criteria with your own weights, ranked and sorted into classes A, B and C with a safety override and a suggested maintenance strategy.
- Condition monitoring route sheetA route of measuring points with baselines, alert and alarm limits, a check interval from the P-F interval, readings with rising and overdue flags, and an exceptions list worst first.
- Weekly maintenance schedule templateNext week's maintenance jobs, scheduled only when ready, loaded against each craft's hours by day, with schedule compliance and break-ins at week end.
- Equipment downtime log (MTTR and MTBF)A breakdown and downtime log, with MTTR, MTBF and downtime by machine and cause worked out in Excel.
- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
Doing this in LeanSuite
Autonomous Maintenance
Rolls out visual CILR (clean, inspect, lube, retighten) checklists so operators catch small abnormalities before they cause downtime.
See Autonomous MaintenanceMicro-stops
Log the brief jams your ERP and MES never report, and see which micro-stops cost the most so you can win back OEE.
See Micro-stopsLoss & Cost Management
Shows where your plant loses money, puts a cost on each loss and gives you the tools to remove it.
See Loss & Cost Management
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about preventive vs predictive maintenance
Preventive maintenance is done at set intervals of time or usage, whether or not the part needs it. Predictive maintenance is done when a measured condition, such as vibration, temperature or oil condition, shows the part is deteriorating. Preventive follows the calendar and predictive follows the machine. Predictive avoids changing good parts but needs readings and someone to interpret them.
Neither is better everywhere. Use preventive maintenance where wear follows time or usage and the service is cheap. Use predictive maintenance on critical assets where failure gives warning in a reading you can take. Use reactive maintenance on cheap, non-critical parts. Most plants run a mix, chosen machine by machine.
It turns breakdowns into scheduled jobs. A planned stop at a convenient time costs less than a failure in the middle of an order, wear is caught while the repair is small, and parts and people can be ready. The trade-off is that some parts are replaced a little early.
Planned maintenance is maintenance prepared in advance: the job is defined and the steps, parts, tools, skills and time are worked out before it starts. It covers preventive and predictive tasks and repairs that can be prepared ahead. In TPM it is also one of the pillars.
Scheduled preventive maintenance, changeovers, cleaning stops, trials, breaks and meetings that stop the line, and planned shutdowns for larger overhauls. They are known in advance, so the production plan can allow for them. Each plant decides which count against OEE and should write the rule down.
Autonomous maintenance is the TPM pillar in which operators take on basic care of their own machines: cleaning, inspecting, lubricating, tightening and spotting abnormalities early. It is usually introduced in seven steps, starting with an initial clean. It frees maintenance technicians for planned and more skilled work.
TPM stands for total productive maintenance, not total preventive maintenance. It is a plant-wide approach that makes operators, maintenance and management jointly responsible for equipment, aiming for no breakdowns, no small stops, no defects and no accidents. Preventive maintenance is one tool used inside it.
Related guides and tools
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon and jidoka
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- What is an NCR?
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?