Practical guide · Safety management
Job hazard analysis (JHA): steps, example and how it differs from a JSA
Short answer
A job hazard analysis (JHA) breaks a task into steps, finds the hazards at each step, and decides the controls that remove or reduce them, so the task is done safely. Job safety analysis (JSA) is the same method under another name in most workplaces.
A job hazard analysis, or JHA, is a written review of one job. The team breaks the job into its steps, lists what could hurt someone at each step, and decides what to do about each hazard, starting with the strongest control. The result is a record and a safer method for the task. OSHA publishes guidance on the method under the title Job Hazard Analysis. In most workplaces JSA, job safety analysis, means the same thing. Some safety professionals reserve JHA for a version that also rates the risk, so state which you mean in your own procedure.
Last updated:
How to do a job hazard analysis in four steps
- 1
Choose the job
Start with the jobs that have hurt people, nearly hurt people, or could hurt someone badly, and with new or changed jobs. The near miss and injury records tell you where.
- 2
Break the job into steps
Watch the job being done, with the person who does it. Write the steps in order, each as a verb and an object, such as "lift coil onto the stand". Keep to the main steps. Around ten is plenty for most jobs; if you need many more, split the job.
- 3
Identify the hazards at each step
For every step ask what could go wrong and how someone could be hurt: struck by, caught in, falls, strains, contact with energy, chemicals, noise, heat. Also ask what the person does when the step goes wrong, because that is when injuries happen.
- 4
Decide the controls
For each hazard write what will be done, and prefer controls in this order: eliminate the hazard, substitute something safer, put in engineering controls, use administrative controls such as procedures and training, and last, personal protective equipment. This is the hierarchy of controls. Give each action an owner and a date.
Then use the result: put the safe method into the procedure, train the people who do the job, and review the analysis whenever the job, the equipment or the people change, or after an incident. The free job safety analysis template lays out the table.
Worked example: loading a coil onto an uncoiler
This example is made up for this page and is illustrative. The 1 to 5 scales are our own; use your site's scales. Risk score is severity times likelihood.
| Step | Hazard | Before (S x L) | Control | After (S x L) |
|---|---|---|---|---|
| Move the coil to the uncoiler with the lift truck | Struck by the truck or a falling coil | 4 x 3 = 12 | Marked route, spotter at the crossing, coil secured on the forks (engineering and administrative) | 4 x 2 = 8 |
| Lift the coil onto the mandrel | Coil drops while lifted | 5 x 2 = 10 | Rated lifting device with a lifting eye replaces the manual lift (substitution) | 5 x 1 = 5 |
| Cut the banding | Cut hands; the coil springs open | 4 x 4 = 16 | Cut with the coil restrained by the hold-down arm, cut-resistant gloves (engineering and PPE) | 4 x 1 = 4 |
| Feed the strip | Hands caught between strip and rolls | 4 x 3 = 12 | Guard on the entry roll, interlocked; hands out of the zone at start-up (engineering) | 4 x 1 = 4 |
Illustrative. S is severity 1 to 5, L is likelihood 1 to 5.
Read it row by row. Cutting the banding scored 4 times 4, which is 16, the highest, so it gets fixed first. The hold-down arm drops the likelihood from 4 to 1, so the score falls from 16 to 4. Adding the four before scores, 12 plus 10 plus 16 plus 12, gives 50; the four after scores, 8 plus 5 plus 4 plus 4, give 21. The total fell by 29, but the bigger point is that the two worst steps now rely on a physical control, not on someone remembering. Notice also what did not change: the first row's severity stays at 4 because a truck strike is still serious, and only the likelihood can move.
JHA vs JSA: are they different?
In most workplaces, no. Both describe the same technique: break a job into steps, find the hazards, set controls. Different industries and companies picked different names. OSHA's published guidance on the method is titled Job Hazard Analysis, and many companies and safety bodies say Job Safety Analysis. Others say job safety analysis, task hazard analysis or activity hazard analysis for the same thing. Check the current publication from your regulator or safety body.
Some practitioners draw a line: a JSA lists steps, hazards and controls, and a JHA also scores the risk of each hazard before and after, as the example above does. That is a useful habit, but it is a choice, not a rule you can cite. Whichever name you use, define it in your procedure so everyone means the same document. Our template is named job safety analysis and has a risk column.
When to do a JHA
- Before a new job or a new piece of equipment starts.
- When a job has produced an injury, a near miss or a close call.
- When a job changes: new material, tool, layout, people or procedure.
- For non-routine and high-risk work, such as maintenance, confined spaces and work at height, usually together with a permit system where your rules require one.
- On a regular review cycle for high-risk jobs, set by your own procedure.
A JHA is a planning tool. It is not a substitute for a risk assessment matrix at the area level, a lockout procedure for energy control (see the lockout tagout template), or a stop on the job when something unexpected appears. See stop-work authority.
Common mistakes
- Doing it at a desk. The people who do the job know the hazards and the workarounds. Do it at the job, with them.
- Steps too broad. "Operate the press" hides the hazards. Split until each step has a clear action.
- Naming the person as the hazard. "Operator inattention" is not a hazard. Ask what made the mistake easy, and fix that. See unsafe acts and unsafe conditions.
- Every control is PPE or a warning sign. These are the weakest controls. Look up the hierarchy before writing them down.
- Filing it. A JHA in a binder changes nothing. Put the controls into the procedure and the training.
- Never reviewing it. When the job changes, the analysis is wrong.
How LeanSuite fits
LeanSuite's safety improvement module runs safety inspections, gemba walks and LOTO checks from ready-made templates, with a failed item raising a safety tag automatically, and a floor-plan heat map shows where hazards cluster. Its near miss reporting tracks each reported hazard to closure. It is not a permit-to-work system, and it does not tell you what the law requires of your site.
Regulations on hazard assessment vary by country and industry. This guide names no section of any regulation. Read the current text of the rule that applies to you.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Five Common Manufacturing HazardsThe usual hazards to look for at each step.
- Five Ways to Improve Safety on the Shop FloorPractical changes that follow from a JHA.
- Building a Proactive Safety Culture in ManufacturingWhy people tell you the real steps.
- Near Miss Reporting That Prevents Future IncidentsA second source of jobs to analyse.
- Preventable Shop Floor Incidents Plants MissCommon hazards that a task review would have caught.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Job safety analysis (JSA) templateJob steps, hazards, risk scored before and after the controls, the hierarchy of controls, PPE and sign-off.
- Risk assessment matrix template (5×5)A color-coded 5 × 5 severity and likelihood matrix, a scoring guide and a risk register.
- Lockout/tagout (LOTO) procedure templateA machine-specific LOTO procedure: energy sources and isolation points, the steps from shutdown to restart, and the annual review.
- Toolbox talk templateA record of a short safety talk: topic, key points, questions raised, actions and an attendee sign-in sheet.
- Safety audit checklistThirty-four plant-wide safety checks answered Yes, No or N/A, scored by area, with a risk rating and an action for every No.
- Near miss report formA two-page near miss report from the first report to closure, and an Excel log with status and days open.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Noise dose and TWA calculatorDose and 8-hour TWA for a shift of noise levels under OSHA and NIOSH, which limits are reached and how much loud time to cut.
Doing this in LeanSuite
Safety Improvement
Keeps employees alert to hazards and gives leaders the visibility to drive safety improvements.
See Safety ImprovementNear Miss Reporting
Anyone logs a near miss, unsafe act or unsafe condition on their phone in seconds, and each corrective action is tracked until it is closed.
See Near Miss Reporting
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about job hazard analysis
A job hazard analysis is a written review of one job. The team breaks the job into steps, lists the hazards at each step and decides the controls, starting with the strongest. It produces a safer method and a record.
In most workplaces they are the same method with two names. Some safety professionals use JHA for a version that also rates the risk of each hazard. There is no single rule, so define the term in your own procedure.
Choose the job, break it into steps, identify the hazards at each step, and decide the controls, preferring elimination and engineering controls to procedures and protective equipment. Then put the controls into the procedure, train the team and review the analysis when the job changes.
The people who do the job, a supervisor who knows how it is meant to be done, and someone with safety or engineering knowledge. The person who does the job knows the shortcuts and the real hazards, so a JHA done without them misses things.
Whenever the job, equipment, material or people change, after any injury or near miss on that job, and on a regular cycle that you set for high-risk jobs. Check any rule from your regulator or customer that sets an interval.
Related guides and tools
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon and jidoka
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- What is an NCR?
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

