Quad chart: what it is and what goes in the four boxes

Short answer

A quad chart is one landscape page split into four boxes that summarises a project, idea or plan in short text and one picture, so decision makers can take it in at a glance. A common layout puts the idea and its owner top left, the problem top right, the approach with a picture bottom left, and cost, schedule and result bottom right. There is no universal standard.

Last updated:

What a quad chart is

A quad chart is a single page in landscape orientation, divided into four equal boxes. It describes one project, invention or plan using brief text and usually one picture. The reader is someone who has a few minutes: a reviewer, a sponsor, a committee. The page lets them decide whether to read further.

According to Wikipedia, the format was developed at NOAA and is used by NASA for SBIR (Small Business Innovation Research) projects, and government agencies and large firms ask contractors for one in bids, often with a white paper. School science fairs and university research posters borrow the format too.

The phrase is also used for other things. Some people mean a 2x2 matrix such as a SWOT or an impact and effort grid. Others mean a lean dashboard of four KPIs. This page is about the project summary, and the section on other four-box charts shows how the rest differ.

The four boxes, filled in

No standard fixes what goes in each box. Whoever asks for the chart usually supplies a form, so follow it if you have one. When you do not, this layout works for most projects.

A default layout for a quad chart
BoxQuestion it answersWhat to put in itKeep it to
Top left: the ideaWhat is this, and who is behind it?Project title, owner, team, date and one sentence on what you proposeTitle plus two or three lines
Top right: the needWhy does it matter?The problem or need in plain words, with the gap against the targetThree to five short bullets
Bottom left: the approachWhat will you do?The method in a few steps and one picture, such as a diagram, a photo of the area or a sketch of the new layoutThree to five bullets and one image
Bottom right: cost, schedule and resultWhat does it need, and what will we get?Cost or resources, key dates, the expected or actual result and what you ask the reader to decideThree to five short bullets

A common variant swaps the boxes for objective, approach, benefits and results. Pick one and use it for every chart in the same review.

Example: a changeover reduction project on one page

This example is illustrative. It shows how the four boxes carry a project built around a PDCA cycle and a SMED study. It has no figures because a real chart takes them from the plant's own measurements. You can plan the project itself with the PDCA template and the SMED changeover worksheet.

Illustrative quad chart: filler changeover reduction
BoxWhat it says
The ideaShorten the changeover on the filler line. Owner: line supervisor. Team: operators from both shifts, a maintenance technician, quality.
The needChangeovers take the line off schedule several times a week. Short runs mean more of them. The goal is a changeover time set from the first study, not from a guess.
The approachFilm one changeover. Sort the steps into work that needs the line stopped and work that can be done while it runs. Move or remove steps, trial the new sequence, write it down. Picture: the filmed changeover split into stopped and running steps.
Cost, schedule, resultCost: team time and small fixtures. Schedule: study in week one, trial in week three, standard in week five. Result so far: to be filled in from the trial. Ask: approve a second line.

Writing each box so it can be read fast

The format forces short writing, and short writing is harder than long writing. A few habits keep the page readable.

  • Write the need as a gap, not a complaint: what the standard is, what happens now, and where. Leave the cause out until the approach box.
  • Start each bullet with a verb or a noun the reader can picture, and cut any bullet that would still be true of every other project.
  • Pick the picture last, and pick the one that would answer the first question a reviewer asks. A before and after photo, a process sketch or a layout drawing all work; a stock image does not.
  • State the ask in the last box in plain words: approve the second line, release the budget, take the escalated issue.
  • Give every number a unit and a date, and say whether it is a measurement, an estimate or a target.

Example: a kaizen event readout

A second illustration, again with no figures: a five-day kaizen event on a kitting area, summarised for the plant manager on the Friday. It shows how the same four boxes work for a readout and not a proposal.

Illustrative quad chart: kaizen event readout
BoxWhat it says
The ideaKitting area layout kaizen. Event leader and team named, with the week's dates.
The needKits are late to the line and pickers walk long routes. The target is a kit ready before the line needs it, every shift.
The approachWalk the picking route, move the fast movers to the front, add a marked staging lane. Picture: the area sketch before and after.
Cost, schedule, resultCost: shelving moves and labels. Result: trial run complete; the measure to watch is late kits per shift. Ask: sign off the layout and a 30-day follow-up.

The chart does not replace the A3 behind it. It is the page the plant manager reads in the minute before deciding whether to ask for the A3.

How to read one in 30 seconds

  1. 1

    Start top left

    Read the title and the owner. If you cannot tell who is responsible, that is the first problem.

  2. 2

    Move to the need

    Is the problem stated as a gap against a target, in words you would use? A box that describes the solution here is a warning.

  3. 3

    Look at the picture

    Does it show the approach or only decorate the page? One clear image should explain what changes.

  4. 4

    Finish with cost, dates and the ask

    A missing owner, a missing date or no stated result are the red flags. The last box should say what you are being asked to decide.

Quad chart or something else?

Several lean tools look similar on a wall. The difference is the job each one does. A quad chart summarises one thing once. An SQDC board tracks results every day. They are not interchangeable.

Quad chart compared with four similar tools
ToolPurposeWho reads itHow often it is updatedLeanSuite page
Quad chartSummarise one project or idea in four boxesA sponsor, reviewer or committeeAt each review, or once for a bidQuad chart template
A3Tell the full story of one problem on a page, from background to follow-upThe owner, a coach and stakeholdersThroughout the projectA3 template
SQDC or SQCDP boardTrack safety, quality, delivery, cost and people results by dayThe team at the daily huddleEvery daySQCDP tier board
Impact / effort matrixSort many ideas on two axes to decide what to do firstA team prioritising a listWhen ideas are addedImpact / effort matrix
SWOTSort strengths, weaknesses, opportunities and threats about a situationA team planningAt planning timeSWOT analysis

Quad charts in a lean plant

In a lean plant the quad chart is a project summary, not a live board. It fits three places.

  • Project reviews. A leadership team looking at a dozen improvement projects can read twelve quad charts in the time one full presentation takes.
  • Kaizen event readouts. The team hands in one page at the end of the week showing the need, what they changed and what they ask for next.
  • Escalation from a tier meeting. When a problem in the daily huddle needs a decision from the level above, a quad chart puts it in front of them in one page. The tiered meeting page shows how issues escalate up.

The live tracking happens elsewhere. Daily results sit on a tier board in Lean Studio, and open issues sit in Daily Issue Management. LeanSuite does not generate quad charts or have a quad chart view; the chart is a document you make from the facts those tools hold.

Other charts that also have four boxes

Search results for the term mix three different things, so it helps to know which one you were asked for.

  • The project summary, described above. One thing, four headings, one page.
  • The two-by-two matrix, such as a SWOT, an Eisenhower grid or a risk matrix. Many items are sorted into four cells by two scales. The prioritization matrix post covers the common ones.
  • A KPI one-pager showing four measures with a trend for each. It is a dashboard and is updated often, which is closer to a tier board than to a quad chart.

If a customer or a funding body asks for a quad chart, they almost always mean the first. If a colleague asks for a quadrant board, ask what goes on it before you start.

How to make one

  1. 1

    In PowerPoint

    Set the slide to landscape, draw a two-by-two table or four rectangles, write a heading in each box, then keep each box to a few short bullets and one image. Some school and university instructions ask for a minimum of 14 point type; it is a good floor for any chart that will be read on a screen.

  2. 2

    In Excel

    Merge cells into four equal blocks on a landscape print area. It suits charts that pull numbers from other sheets, and it prints on one page when you set fit to page.

  3. 3

    On a board

    A four-quadrant board in Lean Studio lets a team fill in the boxes together at the same time, which suits a kaizen readout. The impact / effort matrix and the SWOT board are examples of four-quadrant boards.

A ready-made layout is available as the quad chart template.

When a quad chart is the wrong format

Use something else when the reader needs the detail or the daily number. A problem that still needs its cause found belongs on an A3 or an 8D, where the analysis is visible. A result that changes every day belongs on a tier board. A list of fifty ideas to rank belongs on a matrix. The quad chart sits above those: it is the page that points the reader to them.

It is also a poor fit when there is nothing to say yet in one of the boxes. An empty cost box or an empty need box usually means the project is not ready for review, and the blank box is useful information for the person who fills it in.

Mistakes to avoid

  • Too much text. If a box needs paragraphs, the chart has stopped being a summary. Move the detail to an A3 and keep the chart to headlines.
  • No picture. The image carries the approach. Without one the page reads like a memo cut into pieces.
  • No owner or date. A project with no name and no schedule cannot be followed up.
  • Stale numbers. Put the date of the last update on the page and replace old results when you present again.
  • Mixing it up with a dashboard. A quad chart is read once at a review. If you need the numbers every day, use a board.
  • A different layout every time. When a committee compares many charts, they should find the same box in the same place.

FAQ

Questions about quad chart

  1. A quad chart is a one-page summary in landscape format, split into four boxes, that describes a project, invention or plan using short text and a picture. It is used to brief decision makers quickly, in bids, reviews and science fairs.

  2. A common layout has the idea and its owner, the need or problem, the approach with a picture, and cost, schedule and result. There is no fixed standard, so follow the form the reviewer gives you if there is one, and use the same layout for every chart in a review.

  3. A SWOT or an impact and effort matrix sorts many items on two axes to help a team decide. A quad chart summarises one thing, such as a project, in four boxes. The boxes of a quad chart are headings for different information, not the cells of a grid.

  4. No. An SQDC or SQCDP board tracks results by pillar, such as safety, quality, delivery, cost and people, and is updated every day at the huddle. A quad chart summarises a single project once, for a review. They look alike on a wall but do different jobs.

  5. Set the slide to landscape, add a two-by-two table or four rectangles, and give each box a heading. Write a few short bullets in each box, add one picture to the approach box, and use a legible font. Some school and university instructions ask for at least 14 point type.

Rather see it on your own problem?