The Best Strategies to Reduce Changeover Time in Manufacturing

Why changeover time matters, how to measure it, the benefits of cutting it, and strategies such as SMED, documented procedures and standard work.

Author
Marketing ·
Published
Reading time
14 min
Three operators swap a press die in parallel, pit-crew style, with tools staged ready to cut changeover time

Minimizing changeover time in the manufacturing industry is crucial not only for maintaining efficiency, but also for ensuring customer satisfaction. What’s more, delivering quality products consistently and on time is essential for building trust and loyalty with customers. To meet and exceed customers’ expectations, you must initiate production runs swiftly and seamlessly. In this blog post, we will explore various strategies to reduce changeover time in manufacturing, highlighting how these improvements can transform your manufacturing processes, improve customer satisfaction, and drive your business forward.

Understanding what changeover time is

Changeover time refers to the period taken to transition from producing the last item of one production run to the first item of a new run, with both meeting the required quality standards. This interval can vary depending on the industry and manufacturing process as it is influenced by the complexity and specificity of the equipment and procedures involved.

In some sectors, changeover time might be swift and straightforward, while in others, it could be complex and time-consuming. Even seemingly minor changeover durations, such as an hour a day, can greatly impact overall efficiency. This is because frequent or prolonged transitions can reduce the productive uptime of machinery and labor. Ultimately, affecting the throughput and profitability of the manufacturing operation.

What the changeover clock covers, last good unit to first good unit
  1. 1

    Last good unit

    The clock starts after the final unit of the old run that meets standard
  2. 2

    Clean and change over

    Clean the equipment, change materials
  3. 3

    Set up and calibrate

    Measure and set new parameters, calibrate, any maintenance
  4. 4

    First batch and checks

    Run the first batch and conduct quality checks
  5. 5

    First good unit

    The clock stops at the first unit of the new run that meets standard

Task list from the guide's breakdown under How to measure changeover time.

How to measure changeover time

Traditionally, measuring changeover time in manufacturing environments involved a simple, but rudimentary method: pen, paper, and a clipboard.

Supervisors or operators would manually record the time taken to switch from producing one product to another. In essence, they would be capturing essential data points by hand. This method, while straightforward, was prone to inaccuracies and inconsistencies.

As industries advanced, many companies aimed to refine their measurement of changeover time by breaking down the process into more detailed tasks. These tasks included:

  • Cleaning the equipment
  • Changing materials
  • Measuring and setting up new parameters
  • Calibrating machinery
  • Performing maintenance
  • Running the first batch of good material
  • Conducting quality checks

These task breakdowns aimed to provide a more detailed view of the changeover process, highlighting areas for improvement and efficiency gains.

However, the manual nature of recording these tasks posed significant challenges. Data often became inaccurate due to human error. For instance, numbers were excluded, rounded, or omitted entirely. Therefore, this inaccuracy made it difficult to obtain a true picture of changeover time. As a result, this hindered efforts to optimize production.

The modern approach to calculating changeover time

To address these issues mentioned above, modern manufacturing environments increasingly rely on automated systems to measure changeover time.

Automated machine data platforms capture real-time data with precision, eliminating the inaccuracies associated with manual recording. Moreover, by leveraging technology, companies can obtain a more accurate and comprehensive picture of their changeover times. Consequently, this leads to more effective strategies for reducing downtime and improving efficiency.

In sum, the most accurate way to measure changeover time is through the use of a machine data platform. This ensures reliable and actionable insights for continuous improvement.

Essential factors to consider when calculating changeover time

Regardless of the method used, certain factors must always be included in changeover time calculations to get a comprehensive view of its impact. These factors include lost labor cost, product cost, and recovery costs.

1. Lost labor cost

To calculate lost labor cost, determine the number of workers involved multiplied by their hourly wage multiplied by the total number of hours lost or expended in the changeover.

For instance, if there are 2 workers involved with an hourly wage of $20 each and the entire changeover process takes 2 hours, the lost labor cost would be 2 x $20 x 2 = $80.

2. Product cost

This involves calculating the cost of products that could have been produced during the downtime.

To find this, multiply the number of units typically produced per hour by the cost per unit, and then by the downtime duration.

For example, if 100 units are produced per hour and each unit costs $5, the product cost for 2 hours of downtime is 100 x $5 x 2 = $1,000.

3. Recovery costs

Recovery costs include any additional expenses incurred to bring the production back to its normal state. For example, this may involve overtime pay, expedited shipping for materials, or additional quality checks.

To calculate this, sum up all these extra costs incurred due to the downtime.

Costing one changeover with the guide's three factorsIllustrative example

Changeover cost = Lost labor cost + Product cost + Recovery costs

Lost labor cost
Workers × hourly wage × hours lost
Product cost
Units per hour × cost per unit × hours of downtime
Recovery costs
Sum of extras: overtime, expedited shipping, added quality checks

Worked example

Lost labor cost
2 × $20 × 2 h = $80
Product cost
100 × $5 × 2 h = $1,000
Recovery costs (assumed overtime)
$150
Changeover cost
$1,230

Labor and product lines are the guide's example; the $150 recovery cost is assumed.

The benefits of reducing changeover time in manufacturing

Reducing changeover time in manufacturing is a game-changer for efficiency and productivity. In this section, we’ll explore the top three benefits that come from streamlining this critical process.

Three benefits of faster changeovers: react to demand changes, unlock value-added capacity and remove inefficiencies

1. React better to changes in customer demand

Reducing changeover time in manufacturing helps you to better react to changes in customer demand.

By eliminating as many changeover steps as possible, you can facilitate improved changeover times, leading to enhanced flexibility and responsiveness. This agility allows you to produce smaller batch sizes more efficiently, ensuring that you can quickly adapt to market fluctuations and meet customer needs with greater precision.

Consequently, this capability boosts operational efficiency and enhances customer satisfaction by providing timely and tailored products.

2. Unlock more value-added capacity from production runs

Reduce changeover time in manufacturing to unlock more value-added capacity from production runs.

When equipment spends less time idle during changeovers, overall productivity increases significantly. By minimizing the downtime associated with switching from one task or product to another, you can reduce production batch sizes, and even efficiently produce single-piece lot sizes. This flexibility enables a more responsive production process, allowing quicker adaptation to changing market demands and reducing inventory costs.

As a result, the streamlined operations enhances throughput and improves the quality and variety of products offered. Ultimately, maximizing the value derived from each production run.

3. Maximize productivity and eliminate inefficiencies

Reducing changeover times is crucial for maximizing productivity, as it directly increases the number of units produced within a given day.

By minimizing the duration needed to switch between different production processes, tasks or batches, you can significantly boost your operational efficiency and output.

Moreover, changeover time is classified as ‘Waiting’, one of the eight types of waste identified in Lean process management, or also known as Lean manufacturing. Reducing this waiting time not only enhances production flow, but also contributes to higher overall production value. This is because it eliminates inefficiencies and ensures continuous, streamlined operations.

How to reduce changeover time in manufacturing

Three ways to cut changeover time: apply SMED, document changeover procedures and write standard work instructions

Reducing changeover time in manufacturing is a game-changer for efficiency and productivity. In this section, we’ll explore the top three benefits that come from streamlining this critical process.

1. Implement Single-Minute Exchange of Die (SMED)

Implementing the Single-Minute Exchange of Die (SMED) system, developed by Dr. Shigeo Shingo, is highly effective in reducing changeover time in manufacturing.

This innovative system focuses on drastically decreasing equipment changeover times, aiming to complete these transitions within single-digit minutes, ideally nine minutes or less. By separating internal and external setup tasks, standardizing functions, and simplifying operations, SMED enables you to streamline processes, minimize equipment downtime, and increase overall productivity.

This approach enhances efficiency and allows for greater flexibility in production schedules. Therefore, leading to more responsive and competitive manufacturing operations.

2. Quickly document changeover procedures

To swiftly document changeover procedures and reduce changeover time in manufacturing, it is essential to start by observing or recording current operations meticulously. Doing so allows you to capture a clear and accurate picture of the existing process.

Once documented, break down each production process into smaller, manageable steps. Assess each step critically, asking if any tasks can be performed differently or more efficiently. In essence, this granular analysis helps identify bottlenecks and opportunities for improvement.

By systematically examining and refining each component of the changeover process, you can implement streamlined procedures that minimize downtime and boost overall productivity.

3. Create standard work instructions for efficient changeovers

Creating standard work instructions, also known as Standard Operating Procedures (SOPs), is crucial for reducing changeover times. These instructions serve as the most effective method for streamlining procedures and ensuring consistency across operations.

By documenting each step of the changeover process in detail, employees can follow a uniform approach. As a result, this minimizes variations and errors that often lead to delays. Additionally, SOPs facilitate training and skill development. This, in turn, enables workers to perform tasks efficiently and confidently.

In short, standardizing work through SOPs not only speeds up changeovers, but also enhances overall productivity and quality. Thus, fostering a more efficient and reliable manufacturing environment.

From a recorded changeover to standard work
  1. 1

    Observe or record

    Capture the current changeover as it really runs
  2. 2

    Break into steps

    Split the process into small, manageable steps
  3. 3

    Question each step

    Can it be done differently or more efficiently? Find the bottlenecks
  4. 4

    Write standard work

    Document every step as an SOP so everyone follows one method
  5. 5

    Train on it

    Use the SOP to train, cutting the variation that causes delays

Frequently Asked Questions

What is changeover time in manufacturing?

Changeover time is the time from the last good part of one production run to the first good part of the next. It varies by industry and by how complex the equipment and procedures are. Even an hour a day of changeover cuts into the uptime of machines and people, which shows up in throughput and profit.

How do you measure changeover time?

The most accurate way is an automated machine data platform that captures the times as they happen. The older method, a supervisor with a clipboard timing each changeover, is prone to rounded or missing numbers. Breaking the changeover into tasks such as cleaning, material changes, calibration and the first good batch helps show where the time goes.

How do you calculate the cost of a changeover?

Add three things: lost labor, lost product and recovery costs. Lost labor is workers involved times hourly wage times hours lost, so two workers at $20 for a two-hour changeover is $80. Lost product is units per hour times cost per unit times downtime, so 100 units an hour at $5 for two hours is $1,000. Recovery costs cover overtime, expedited shipping or added quality checks.

What is SMED and how does it reduce changeover time?

SMED, Single-Minute Exchange of Die, is Shigeo Shingo's method for getting a changeover down to single-digit minutes, ideally nine or less. It separates internal from external setup tasks, standardizes functions and simplifies the work that is left. Less idle equipment means more output and more flexibility in the production schedule.

What are the benefits of reducing changeover time?

Faster response to demand, more capacity from the same equipment, and more units per day. Smaller batches, even single pieces, become practical, so you react sooner when customer demand shifts. Equipment spends less time idle, which frees capacity and lowers inventory costs. And since changeover counts as Waiting, one of the eight lean wastes, every minute you cut adds units to the day's total.

Why write standard work instructions for changeovers?

Because everyone then does the changeover the same way, which removes the variation and errors that cause delays. Start by observing or recording the current changeover, break it into small steps and ask of each one whether it can be done differently or more efficiently. Write the result up as a standard operating procedure, which also makes training new operators easier.

Free for this topic: Standard work sheet template, SMED changeover worksheet, Takt time calculator

Want our lean manufacturing guides first in Google? Add us as a preferred source.

Add LeanSuite as a preferred source on Google (opens in a new tab)