Value stream mapping and flow

Value stream mapping draws the whole flow of material and information needed to deliver a product, with the cycle times, inventory and lead time at each step, so you can see where waste builds up and where flow stops. The current-state map shows how the process runs today and the future-state map designs how it should run, with continuous flow and pull. These guides cover mapping, pull systems and just-in-time, and the practical levers on lead time, throughput, bottlenecks, line balance and changeovers.

Quick guides: Cycle time vs lead time, worked through, How many operators a line needs, What is lead time, Kanban, Just-in-time manufacturing, Production efficiency, SIPOC diagram, Flowchart, Takt time

Also: Model area 90-day plans, Current state value stream map, Lean books with honest summaries

Picture gallery: SMED examples (16)

From current state to future state

  1. 1

    Map the current state

    Material and information flow, with cycle time, inventory and lead time at each step.
  2. 2

    See where flow stops

    Inventory piles, long waits and the bottleneck.
  3. 3

    Design the future state

    Continuous flow where possible, pull where it is not.
  4. 4

    Work the levers

    Lead time, throughput, bottlenecks, line balance and changeovers.
The map is only the start. Its value is the future state and the plan that gets you there.

All 38 articles on value stream mapping and flow

What the 38 articles on value stream mapping and flow cover

  1. Flow, pull and just-in-time16 articles
  2. Value stream mapping8 articles
  3. Production efficiency and cost6 articles
  4. Lead time, throughput and bottlenecks5 articles
  5. Line balancing and changeover3 articles
The longest bar is the part of value stream mapping and flow with the most written about it. Find the part that matches your problem, then open that group below.

Value stream mapping (8)

Flow, pull and just-in-time (16)

Lead time, throughput and bottlenecks (5)

Line balancing and changeover (3)

Production efficiency and cost (6)

Where LeanSuite helps

Free templates

FAQ

Questions about value stream mapping and flow

  1. A current-state map documents how the value stream actually runs today, including its waste, inventory build-up and disconnected steps, so you can see where flow stops. A future-state map designs how it should run after specific lean improvements you can make within 6 to 12 months, with continuous flow, pull and less inventory. The first shows what needs fixing; the second sets the target and the roadmap.

  2. In a pull system no process produces anything until the process downstream of it signals that it needs material. Production follows actual consumption instead of a forecast, which removes the overproduction, excess inventory and waiting that push scheduling creates. Pull is one of the core tools of the just-in-time pillar of the Toyota Production System.

  3. Material lead time (getting raw materials procured and delivered), customer lead time (from the customer's order to delivery), production lead time (the time to make the product) and cumulative lead time (the total across the whole process).

  4. A yamazumi chart is a stacked bar chart of the work at each workstation or operator. Each bar is a station, each segment in it is a task, and the segment's height is that task's cycle time. It makes bottlenecks and uneven workloads easy to see, which is where line balancing starts. Yamazumi is Japanese for โ€œto stack upโ€.