SMED training presentation

SMED (single-minute exchange of die) is a method for cutting the time a machine is stopped while it changes from one product to the next. This free deck teaches it in about 30 minutes. Its 16 editable slides cover internal and external setup, the four stages from watching the changeover to tightening what is left, who to put on the team, an illustrative worked example with the arithmetic, the common mistakes, a paper activity and four check questions with answers. Every slide has speaker notes.

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

The cover slide of the SMED training presentationThe title SMED, faster changeovers, on a navy background with the LeanSuite logo.
16 editable slidesSpeaker notesInternal vs external setupThe four SMED stagesIllustrative worked examplePaper changeover activity4 check questions with answersPDF handout

A look inside

What is in the 16 slides

For operators, setup technicians, team leaders, engineers and anyone who runs a changeover. Widescreen, in plain language, with speaker notes on every slide.

  • Slide 5 of the smed training presentation: The four stages.
    Slide 5: The four stages
  • Slide 11 of the smed training presentation: Example: SMED on a packing line.
    Slide 11: Example: SMED on a packing line
  • Slide 13 of the smed training presentation: Try it: split a changeover on paper.
    Slide 13: Try it: split a changeover on paper
  1. 1SMED: faster changeoversCover
  2. 2AgendaWhat SMED is · Internal and external setup · The four stages · Running a SMED event · Example, mistakes, activity and check questions
  3. 3What SMED isSMED, single-minute exchange of die, is a method for shortening the time a machine is stopped during a changeover.
  4. 4Internal and external setupThe whole method rests on sorting every changeover task into one of two groups.
  5. 5The four stagesWatch it as it is, Separate, Convert, Tighten
  6. 6Stage 0: watch the changeover as it isFilm the whole changeover from the last good part to the first good part.
  7. 7Stage 1: separate internal and externalList the tasks and mark each one internal or external.
  8. 8Stage 2: convert internal to externalFor each internal task ask: does it really need the machine to be stopped?
  9. 9Stage 3: tighten what is leftReplace bolts with quick fasteners: one-turn clamps, hand knobs, wedges, magnets or clips.
  10. 10Running a SMED eventA small team: the operators who do the changeover, a setup technician, maintenance and a supervisor.
  11. 11Example: SMED on a packing lineAn illustrative example, with numbers made up to show the arithmetic.
  12. 12Common mistakesStarting stage 3 (quick fasteners) before stages 1 and 2.
  13. 13Try it: split a changeover on paperA 15-minute team activity
  14. 14Check your understanding4 check questions
  15. 15AnswersThe answers, to discuss
  16. 16Key points and next stepsNext: film one changeover this week.

The 30-minute session, slide by slide

  • Slides, about: 15 minutes
  • Activity (slide 13): 15 minutes
  1. Present · 12 slides

    1. 1SMED: faster changeovers
    2. 2Agenda
    3. 3What SMED is
    4. 4Internal and external setup
    5. 5The four stages
    6. 6Stage 0: watch the changeover as it is
    7. 7Stage 1: separate internal and external
    8. 8Stage 2: convert internal to external
    9. 9Stage 3: tighten what is left
    10. 10Running a SMED event
    11. 11Example: SMED on a packing line
    12. 12Common mistakes
  2. Do the activity · 1 slide

    1. 13Try it: split a changeover on paper
  3. Check and follow up · 3 slides

    1. 14Check your understanding
    2. 15Answers
    3. 16Key points and next steps

About 15 minutes of slides and 15 minutes of activity. Present: slides 1 to 12 (SMED: faster changeovers; Agenda; What SMED is; Internal and external setup; The four stages; Stage 0: watch the changeover as it is; Stage 1: separate internal and external; Stage 2: convert internal to external; Stage 3: tighten what is left; Running a SMED event; Example: SMED on a packing line; Common mistakes). Do the activity: slide 13 (Try it: split a changeover on paper). Check and follow up: slides 14 to 16 (Check your understanding; Answers; Key points and next steps).

Prepare happens before slide 1: read the notes and swap in your own example. Then the deck runs in order: present is slides 1 to 12, do the activity is slide 13 and check and follow up is slides 14 to 16. The check questions come before their answers, so ask first.

How to run it

Running the session

  1. 1

    Prepare

    Read the speaker notes once and swap the illustrative example for one from your own area if you have it. Print the PDF if people like a handout.

  2. 2

    Present

    The slides take about 15 minutes. Every slide has notes, so you can talk from them rather than read the slide.

  3. 3

    Do the activity

    Pick a changeover everyone knows and list its steps in order. The activity slide takes the team through it step by step; allow 15 minutes.

  4. 4

    Check and follow up

    Ask the check questions before showing the answers, then agree one next step with an owner and a date before people leave.

The check questions

1. What does SMED stand for?
Single-minute exchange of die. The target is a changeover under ten minutes, a single digit.
2. What is the difference between internal and external setup?
Internal tasks need the machine stopped. External tasks can be done while it is running.
3. Which stage comes first, and why?
Stage 0, watching the changeover as it is, so the team fixes what really happens and not what it remembers.
4. Why do the operators belong on the team?
They know the real steps and the reasons behind them, and they will run the new method every day.

FAQ

SMED training presentation: common questions

  1. Single-minute exchange of die. It is a method for shortening the time a machine is stopped during a changeover, with a target of a single digit of minutes.

  2. About 30 minutes: roughly 15 minutes of slides, a 15-minute paper activity and the check questions.

  3. No. The word die comes from stamping, but the method works for any changeover: a filling line, a packaging machine, a CNC cell or a mixing tank.

  4. Yes. The PowerPoint file is fully editable, including the speaker notes. Many teams replace the illustrative example with a changeover from their own plant.

More free training decks

Training is the start. Keeping it going is the hard part.

See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.

Book a 45-minute demo