Free training deck
Updated · About 30 minutes
Autonomous maintenance training presentation: the 7 steps
Autonomous maintenance (jishu hozen) is the TPM practice of operators taking care of the basic upkeep of their own equipment: cleaning, inspecting, lubricating and tightening. It is built up in seven steps, from initial cleaning to autonomous management. This free deck teaches the seven steps to operators and team leaders in about 30 minutes. Its 19 editable slides cover why it matters, who does what, each step in turn, step audits, an illustrative example, the common mistakes, an inspection walk-around activity and four check questions with answers, all with speaker notes. The PDF copy works as a handout.
Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.
The title Autonomous maintenance, the 7 steps, on a navy background with the LeanSuite logo.A look inside
What is in the 19 slides
For operators, team leaders, maintenance technicians and TPM coordinators. Widescreen, in plain language, with speaker notes on every slide.

Slide 6: The 7 steps 
Slide 14: Example: initial cleaning on a packaging machine 
Slide 16: Try it: an inspection walk-around
- 1Autonomous maintenance: the 7 stepsCover
- 2AgendaWhat autonomous maintenance is and why it matters · Who does what · The 7 steps, one by one · Step audits, an example and common mistakes · Activity, check questions and next steps
- 3What autonomous maintenance isOperators take care of the basic upkeep of their own equipment: cleaning, inspecting, lubricating and tightening.
- 4Why it mattersMany breakdowns start small: dirt, a loose bolt, low oil, a worn belt.
- 5Who does whatAutonomous maintenance is a partnership, not a handover.
- 6The 7 stepsInitial cleaning, Contamination sources, Provisional standards, General inspection, Autonomous inspection, Standardization, Autonomous management
- 7Step 1: Initial cleaningClean the machine thoroughly, inside and out, and look for problems as you go.
- 8Step 2: Sources of contamination and hard-to-reach areasFind where the dirt, chips, oil and leaks come from.
- 9Step 3: Cleaning, lubrication and inspection standardsWrite down what to clean, lubricate and inspect, how, with what, how often and by whom.
- 10Step 4: General inspectionMaintenance teaches operators how each system works: lubrication, hydraulics, pneumatics, electrics, drives and fasteners.
- 11Step 5: Autonomous inspectionOperators run the full inspection routine themselves.
- 12Steps 6 and 7: Standardize and manageStep 6: Standardization and step 7: autonomous management
- 13Step auditsEach step ends with an audit before the team moves on.
- 14Example: initial cleaning on a packaging machineAn illustrative example of step 1.
- 15Common mistakesCleaning without lockout and tagout.
- 16Try it: an inspection walk-aroundA 10-minute team activity
- 17Check your understanding4 check questions
- 18AnswersThe answers, to discuss
- 19Key points and next stepsNext: plan the initial cleaning for one machine, with maintenance and lockout.
The 30-minute session, slide by slide
- Slides, about: 20 minutes
- Activity (slide 16): 10 minutes
Present · 15 slides
- 1Autonomous maintenance: the 7 steps
- 2Agenda
- 3What autonomous maintenance is
- 4Why it matters
- 5Who does what
- 6The 7 steps
- 7Step 1: Initial cleaning
- 8Step 2: Sources of contamination and hard-to-reach areas
- 9Step 3: Cleaning, lubrication and inspection standards
- 10Step 4: General inspection
- 11Step 5: Autonomous inspection
- 12Steps 6 and 7: Standardize and manage
- 13Step audits
- 14Example: initial cleaning on a packaging machine
- 15Common mistakes
Do the activity · 1 slide
- 16Try it: an inspection walk-around
Check and follow up · 3 slides
- 17Check your understanding
- 18Answers
- 19Key points and next steps
About 20 minutes of slides and 10 minutes of activity. Present: slides 1 to 15 (Autonomous maintenance: the 7 steps; Agenda; What autonomous maintenance is; Why it matters; Who does what; The 7 steps; Step 1: Initial cleaning; Step 2: Sources of contamination and hard-to-reach areas; Step 3: Cleaning, lubrication and inspection standards; Step 4: General inspection; Step 5: Autonomous inspection; Steps 6 and 7: Standardize and manage; Step audits; Example: initial cleaning on a packaging machine; Common mistakes). Do the activity: slide 16 (Try it: an inspection walk-around). Check and follow up: slides 17 to 19 (Check your understanding; Answers; Key points and next steps).
How to run it
Running the session
- 1
Prepare
Read the speaker notes once and swap the illustrative example for one from your own area if you have it. Print the PDF if people like a handout.
- 2
Present
The slides take about 20 minutes. Every slide has notes, so you can talk from them rather than read the slide.
- 3
Do the activity
Pick one machine in your area. Do not open guards or touch moving parts. The activity slide takes the team through it step by step; allow 10 minutes.
- 4
Check and follow up
Ask the check questions before showing the answers, then agree one next step with an owner and a date before people leave.
The check questions
- 1. What is forced deterioration?
- Damage caused by conditions nobody looked after, such as dirt, missing lubrication or loose bolts.
- 2. What happens in step 2?
- The team removes sources of contamination and makes hard-to-reach areas easier to clean, lubricate and inspect.
- 3. What must happen before cleaning inside a guard?
- Lockout and tagout: isolate the energy sources and check that the machine cannot start.
- 4. What does maintenance do in step 4?
- Teaches operators how each equipment system works and what to inspect.
Templates and guides to go with it
- Autonomous maintenance (CILR) checklist20 clean, inspect, lubricate and retighten checks with a box per day, an abnormality log and sign-off.
- Autonomous maintenance step auditCriteria for each of the seven autonomous maintenance steps, scored 0 to 2, with the step result and the decision to move on.
- TPM tag logEvery abnormality tag with type, who fixes it, priority and dates, with days open and counts by type and week.
- Lubrication schedule templateEvery lube point with lubricant, method, amount, frequency and who, with next due dates and a monthly sign-off record.
- One point lesson (OPL) templateOne topic on one page: wrong way and right way pictures, checkable key points, the standard it belongs to and a sign-off record.
- Lockout/tagout (LOTO) procedure templateA machine-specific LOTO procedure: energy sources and isolation points, the steps from shutdown to restart, and the annual review.
- Topic: TPM and maintenanceEvery guide we have on the subject, sorted.
Read more
- Autonomous Maintenance: The Seven-Step Process
- Autonomous Maintenance: Empowering Operators for Equipment Excellence
- The 8 Pillars of TPM: A Manufacturing Guide
- Run autonomous maintenance in LeanSuite: visual CILR checklists, abnormality tags routed to maintenance, and operator certification in the LMS and Skills Matrix
After the session
Put it on the wall
Free printable posters on the same subject, so the team sees it every day: a PNG to download now, and print-ready PDFs from Letter to 24 x 36 in.
Lockout tagout (LOTO) steps poster
Compressed air and water leaks poster
TPM 8 pillars poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Natural vs accelerated wear poster
Machine visual controls poster
One-point lesson poster
FAQ
Autonomous maintenance training presentation: common questions
Initial cleaning; removing sources of contamination and hard-to-reach areas; provisional cleaning, lubrication and inspection standards; general inspection; autonomous inspection; standardization; and autonomous management. Each step ends with an audit before the team moves on.
Yes. The download includes a PDF copy of all 19 slides to print as a handout, as well as the editable PowerPoint file with speaker notes.
The operators who run the equipment, their team leader and at least one maintenance technician, because the steps depend on both groups working together. A TPM coordinator often presents it.
It varies with the equipment and how often the team can work on it. Many plants spend several months on each step and move on only after passing the step audit.
More free training decks
- 5S training presentationSort, set in order, shine, standardize and sustain in 16 slides, with a 15-minute sort activity and a quiz.View deck
- Kaizen training presentationWhat kaizen is, its principles, PDCA and four steps to a first improvement in 17 slides, with an activity and a quiz.View deck
- 8 wastes of lean training presentationValue vs waste, the 8 wastes (TIMWOODS) with examples, muda, mura and muri and a waste walk, in 17 slides.View deck
- Gemba walk training presentationGo see, ask why, show respect: how to plan, run and follow up a gemba walk, in 16 slides with a practice walk.View deck
- Root cause analysis training presentation: 5 whys and fishboneDefine, contain, the 5 whys, the fishbone diagram and verifying the cause, in 18 slides with a team activity.View deck
- TPM training presentation: the 8 pillarsWhat TPM is, the six big losses, OEE and the 8 pillars, in 19 slides with a loss-spotting activity.View deck
- Manufacturing excellence pillars training presentationThe 20 pillars, cost deployment, the 7-step approach, model areas and audits, in 17 slides.View deck
- Obeya room training presentationWhat an obeya is, what goes on its walls and how to run the meetings, in 15 slides with a design activity.View deck
- DMAIC training presentationDefine, measure, analyze, improve and control, with the main tools of each phase, in 16 slides.View deck
- SMED training presentationInternal and external setup, the four SMED stages and how to halve a changeover, in 16 slides.View deck
- FMEA training presentationDFMEA and PFMEA, severity, occurrence and detection, RPN and action priority, in 16 slides.View deck
- Kanban training presentationPull instead of push: how a kanban loop works, the card types, the rules and how to size it, in 16 slides.View deck
- Lockout tagout (LOTO) training presentationHazardous energy, lockout versus tagout and the six steps in order, with a walk-round activity, in 17 slides.View deck
- Quality management system (QMS) training presentationWhat a quality management system is, the ISO 9001 clauses, procedures and records, corrective action and audits, in 18 slides.View deck
- SPC and Cpk training presentationCommon and special cause variation, X-bar and R limits, reading signals, Cp and Cpk, with worked numbers, in 19 slides.View deck
- MSA and Gage R&R training presentationThe five measurement properties, how a gage R&R study works, %GRR and ndc with worked numbers, and attribute gauges, in 19 slides.View deck
- PPAP and APQP training presentationThe five APQP phases, gates, the 18 PPAP elements, the five submission levels and the capability criteria, in 19 slides.View deck
- OEE training presentationHow to calculate OEE and read the six big losses in 19 slides, with one worked shift, a 20-minute exercise and a quiz.View deck
- Leader standard work training presentationWhat leader standard work is, the routine at each level, five steps to build it and how to keep it going, in 19 slides with an exercise and a quiz.View deck
- Daily management and tier meetings training presentationTier meetings, boards, huddles and escalation in 19 slides, with a worked example, a 20-minute huddle exercise and a quiz.View deck
- 5 Whys training presentationOhno's machine example, how to ask good whys, when to stop and where the method falls short, in 20 slides with a team exercise.View deck
- A3 problem solving training presentationThe seven boxes, the three kinds of A3, how to write and coach one, with two worked example slides and a 30-minute exercise, in 20 slides.View deck
- Poka-yoke (mistake-proofing) training presentationMistakes versus defects, the contact, fixed-value and motion-step methods, control and warning devices and how to design and test one, in 18 slides.View deck
- Layered process audit (LPA) training presentationWhat a layered process audit is, the layers, how to write and ask good questions, handle a no and read the results, in 19 slides.View deck
- Standard work training presentationTakt time, work sequence and standard WIP, how to write a standard with the operators and how to keep it alive, in 18 slides.View deck
- Value stream mapping (VSM) training presentationHow to map the current state, read lead time, design the future state with the eight questions and turn it into a plan, in 19 slides.View deck
- TWI job instruction training presentationThe four steps of TWI job instruction and the job breakdown sheet, from the original wartime card, with a worked example and a practice session.View deck
- 8D problem solving training presentationD0 to D8, containment, the root cause and the escape point, proving a fix and preventing repeats, in 20 slides with a team exercise.View deck
- Forklift safety training presentationOperator training rules, stability and load center, travel and dock rules and the daily exam, each tied to 29 CFR 1910.178, in 20 slides.View deck
- Hazard communication (HazCom, GHS) training presentationLabels, the eight GHS pictograms, the 16 SDS sections, employee training and the 2026 and 2028 dates, each tied to 29 CFR 1910.1200, in 20 slides.View deck
- New-hire safety orientation training presentationA day-one safety orientation for plants and warehouses: reporting, emergencies, PPE, chemicals, machines and trucks, with the OSHA paragraph behind each, in 17 slides.View deck
- 4M change management training presentationMan, machine, material and method changes, rating the risk, extra checks, the change point board and closing a change, in 19 slides.View deck
Training is the start. Keeping it going is the hard part.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
