Gemba walk training presentation
A gemba walk is a leader going to the place where the work is done to see it, ask questions and learn, rather than relying on reports. This free deck teaches leaders to run one in about 30 minutes. Its 16 editable slides cover what a gemba walk is and is not, the three principles (go see, ask why, show respect), what to do before, during and after a walk, good questions to ask, leader standard work, an illustrative example, the common mistakes, a 20-minute practice walk and four check questions with answers. Every slide has speaker notes.
Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.
The title Gemba walks, go and see the work, on a navy background with the LeanSuite logo.A look inside
What is in the 16 slides
For team leaders, supervisors, managers and CI coordinators. Widescreen, in plain language, with speaker notes on every slide.

Slide 5: Three principles 
Slide 11: Example: a walk on a filling line 
Slide 13: Try it: a 20-minute practice walk
- 1Gemba walks: go and see the workCover
- 2AgendaWhat a gemba walk is, and is not · Three principles: go see, ask why, show respect · Before, during and after the walk · An example and common mistakes · Practice walk and check questions
- 3What a gemba walk isGemba is Japanese for the real place: where the work is done. A gemba walk is a leader going there to see, ask and learn.
- 4What it is, and what it is notA gemba walk is and it is not
- 5Three principlesGo see, Ask why, Show respect
- 6Before the walkPick a purpose or theme: safety, flow, quality or a recent problem.
- 7During the walkStart where the value is added and follow the product or the job.
- 8Good questions to askCan you show me how this works?, What does normal look like?, How do you know you're on target?, What got in your way today?, What happens when something goes wrong?, What help do you need from me?
- 9After the walkThank the people you spoke with.
- 10Make it a routineWalks work when they are part of leader standard work, not something done when there is time.
- 11Example: a walk on a filling lineAn illustrative example of one 25-minute walk with a theme.
- 12Common mistakesWalking without a purpose.
- 13Try it: a 20-minute practice walkA 20-minute team activity
- 14Check your understanding4 check questions
- 15AnswersThe answers, to discuss
- 16Key points and next stepsNext: put your first walk in the calendar, with a theme.
The 30-minute session, slide by slide
- Slides, about: 10 minutes
- Activity (slide 13): 20 minutes
Present · 12 slides
- 1Gemba walks: go and see the work
- 2Agenda
- 3What a gemba walk is
- 4What it is, and what it is not
- 5Three principles
- 6Before the walk
- 7During the walk
- 8Good questions to ask
- 9After the walk
- 10Make it a routine
- 11Example: a walk on a filling line
- 12Common mistakes
Do the activity · 1 slide
- 13Try it: a 20-minute practice walk
Check and follow up · 3 slides
- 14Check your understanding
- 15Answers
- 16Key points and next steps
About 10 minutes of slides and 20 minutes of activity. Present: slides 1 to 12 (Gemba walks: go and see the work; Agenda; What a gemba walk is; What it is, and what it is not; Three principles; Before the walk; During the walk; Good questions to ask; After the walk; Make it a routine; Example: a walk on a filling line; Common mistakes). Do the activity: slide 13 (Try it: a 20-minute practice walk). Check and follow up: slides 14 to 16 (Check your understanding; Answers; Key points and next steps).
How to run it
Running the session
- 1
Prepare
Read the speaker notes once and swap the illustrative example for one from your own area if you have it. Print the PDF if people like a handout.
- 2
Present
The slides take about 10 minutes. Every slide has notes, so you can talk from them rather than read the slide.
- 3
Do the activity
Pick one process and one question you want answered. The activity slide takes the team through it step by step; allow 20 minutes.
- 4
Check and follow up
Ask the check questions before showing the answers, then agree one next step with an owner and a date before people leave.
The check questions
- 1. What does gemba mean?
- The real place: where the work is done.
- 2. What are the three principles of a gemba walk?
- Go see, ask why, show respect.
- 3. Why not fix problems on the spot?
- The team learns more by solving them, and you stop seeing the rest. Safety risks are the exception.
- 4. What should happen after every walk?
- Thank people, agree a few actions with owners and dates, and follow up on the next walk.
Templates and guides to go with it
- Gemba walk checklistA walk plan and route, 30 prompts in six groups and a findings table with owners and due dates.
- Gemba walk field guideA 20-page pocket guide: the rules, 48 questions by area with good and warning answers, a 30-day route and the follow-through loop, plus an action-log workbook.
- Leader standard work templateA team leader's daily, weekly and monthly routine with a box per day, follow-ups and a weekly review.
- Waste walk checklist (TIMWOODS)32 things to look for across the eight wastes, with where and how much, and a findings log with dot votes, owners and dates.
- Daily huddle agendaA 15-minute start-of-shift stand-up in six timed blocks, with yesterday's SQCDP results, today's plan, actions and escalations.
- Topic: Lean leadership and employee engagementEvery guide we have on the subject, sorted.
Read more
Terms in this deck
After the session
Put it on the wall
Free printable posters on the same subject, so the team sees it every day: a PNG to download now, and print-ready PDFs from Letter to 24 x 36 in.
FAQ
Gemba walk training presentation: common questions
About 30 minutes: roughly 10 minutes of slides, a 20-minute practice walk and a few minutes for the check questions. Without the practice walk it works as a 10-minute briefing before leaders start their own walks.
Anyone who will walk the floor: team leaders, supervisors, managers and CI coordinators. It also helps to brief the teams being visited, so they know a walk is about the process, not about them.
An audit checks against a standard and usually gives a score. A gemba walk is about seeing how the work really runs, asking questions and learning, with actions agreed and followed up. Both are useful; they are not the same thing.
Yes. The PowerPoint file is fully editable, including the speaker notes. Many leaders add their own walk themes and the questions their plant uses.
More free training decks
- 5S training presentationSort, set in order, shine, standardize and sustain in 16 slides, with a 15-minute sort activity and a quiz.View deck
- Kaizen training presentationWhat kaizen is, its principles, PDCA and four steps to a first improvement in 17 slides, with an activity and a quiz.View deck
- Autonomous maintenance training presentation: the 7 stepsThe 7 steps of jishu hozen, who does what and how step audits work, in 19 slides with notes and a quiz.View deck
- 8 wastes of lean training presentationValue vs waste, the 8 wastes (TIMWOODS) with examples, muda, mura and muri and a waste walk, in 17 slides.View deck
- Root cause analysis training presentation: 5 whys and fishboneDefine, contain, the 5 whys, the fishbone diagram and verifying the cause, in 18 slides with a team activity.View deck
- TPM training presentation: the 8 pillarsWhat TPM is, the six big losses, OEE and the 8 pillars, in 19 slides with a loss-spotting activity.View deck
- Manufacturing excellence pillars training presentationThe 20 pillars, cost deployment, the 7-step approach, model areas and audits, in 17 slides.View deck
- Obeya room training presentationWhat an obeya is, what goes on its walls and how to run the meetings, in 15 slides with a design activity.View deck
- DMAIC training presentationDefine, measure, analyze, improve and control, with the main tools of each phase, in 16 slides.View deck
- SMED training presentationInternal and external setup, the four SMED stages and how to halve a changeover, in 16 slides.View deck
- FMEA training presentationDFMEA and PFMEA, severity, occurrence and detection, RPN and action priority, in 16 slides.View deck
- Kanban training presentationPull instead of push: how a kanban loop works, the card types, the rules and how to size it, in 16 slides.View deck
- Lockout tagout (LOTO) training presentationHazardous energy, lockout versus tagout and the six steps in order, with a walk-round activity, in 17 slides.View deck
- Quality management system (QMS) training presentationWhat a quality management system is, the ISO 9001 clauses, procedures and records, corrective action and audits, in 18 slides.View deck
- SPC and Cpk training presentationCommon and special cause variation, X-bar and R limits, reading signals, Cp and Cpk, with worked numbers, in 19 slides.View deck
- MSA and Gage R&R training presentationThe five measurement properties, how a gage R&R study works, %GRR and ndc with worked numbers, and attribute gauges, in 19 slides.View deck
- PPAP and APQP training presentationThe five APQP phases, gates, the 18 PPAP elements, the five submission levels and the capability criteria, in 19 slides.View deck
- OEE training presentationHow to calculate OEE and read the six big losses in 19 slides, with one worked shift, a 20-minute exercise and a quiz.View deck
- Leader standard work training presentationWhat leader standard work is, the routine at each level, five steps to build it and how to keep it going, in 19 slides with an exercise and a quiz.View deck
- Daily management and tier meetings training presentationTier meetings, boards, huddles and escalation in 19 slides, with a worked example, a 20-minute huddle exercise and a quiz.View deck
- 5 Whys training presentationOhno's machine example, how to ask good whys, when to stop and where the method falls short, in 20 slides with a team exercise.View deck
- A3 problem solving training presentationThe seven boxes, the three kinds of A3, how to write and coach one, with two worked example slides and a 30-minute exercise, in 20 slides.View deck
- Poka-yoke (mistake-proofing) training presentationMistakes versus defects, the contact, fixed-value and motion-step methods, control and warning devices and how to design and test one, in 18 slides.View deck
- Layered process audit (LPA) training presentationWhat a layered process audit is, the layers, how to write and ask good questions, handle a no and read the results, in 19 slides.View deck
- Standard work training presentationTakt time, work sequence and standard WIP, how to write a standard with the operators and how to keep it alive, in 18 slides.View deck
- Value stream mapping (VSM) training presentationHow to map the current state, read lead time, design the future state with the eight questions and turn it into a plan, in 19 slides.View deck
- TWI job instruction training presentationThe four steps of TWI job instruction and the job breakdown sheet, from the original wartime card, with a worked example and a practice session.View deck
- 8D problem solving training presentationD0 to D8, containment, the root cause and the escape point, proving a fix and preventing repeats, in 20 slides with a team exercise.View deck
- Forklift safety training presentationOperator training rules, stability and load center, travel and dock rules and the daily exam, each tied to 29 CFR 1910.178, in 20 slides.View deck
- Hazard communication (HazCom, GHS) training presentationLabels, the eight GHS pictograms, the 16 SDS sections, employee training and the 2026 and 2028 dates, each tied to 29 CFR 1910.1200, in 20 slides.View deck
- New-hire safety orientation training presentationA day-one safety orientation for plants and warehouses: reporting, emergencies, PPE, chemicals, machines and trucks, with the OSHA paragraph behind each, in 17 slides.View deck
- 4M change management training presentationMan, machine, material and method changes, rating the risk, extra checks, the change point board and closing a change, in 19 slides.View deck
Training is the start. Keeping it going is the hard part.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo