Safety poster
Updated · Free to print and share
Safety cross calendar poster
A safety cross is a calendar in the shape of a cross, with one square for each day of the month. Each day the team colors its square by the most serious safety event of that day and talks about every square that isn't green at the huddle, so the month's record shows at a glance. This poster is the cross itself at wall size, with an example color key (green, blue for a near miss, yellow for first aid, red for an injury beyond first aid, white for a day not worked) and boxes for the month and days since the last red day.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Days 1 to 31 drawn as a cross to color in, with an example color key and boxes for the month and days since the last injury.The words on the poster
Safety cross
Color each day by its most serious safety event. Talk about every square that isn't green.
Color each day by its most serious event
- Green worked, no safety event
- Blue near miss reported
- Yellow first aid case
- Red injury beyond first aid
- White not worked
- Month: ____
- Days since a red day: ____
On the floor
How to use it
Putting the Safety cross calendar poster to work
- 1
Print one per month at 18 x 24 in or larger and put it on the board where the team huddles.
- 2
Agree the color key with your safety lead and keep it the same all year.
- 3
Color yesterday's square before the huddle, then talk about every square that isn't green.
- 4
Use the free safety cross template for the month totals and the year log.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
A month of green with no near misses reported can mean people have stopped reporting, not that the area is safe. Count the blue squares too: near miss reports are a leading indicator.
Templates, decks and guides to go with it
- Safety cross calendarA month drawn as the green cross, colored each day by the most serious safety event, with totals and days since the last injury.
- Near miss report formA two-page near miss report from the first report to closure, and an Excel log with status and days open.
- Safety pillar 90-day model area planThirteen weeks from the incident pyramid to safety standards on one model area, a KPI board, the day-90 gate and expansion waves.
- Topic: Safety managementEvery guide we have on the subject, sorted.
- Topic: 5S and visual managementEvery guide we have on the subject, sorted.
Terms on this poster
More safety posters
All posters
PPE by zone poster
Lockout tagout (LOTO) steps poster
See it, say it, fix it safety poster
Safety pyramid poster (Bird's triangle)
5 shop floor safety rules poster
Stop, think, act safety poster
Slips, trips and falls housekeeping poster
Emergency response poster
Hierarchy of controls poster
Risk assessment matrix poster (5 x 5)
Job safety analysis (JSA) steps poster
Hazard prediction (KYT) 4 rounds poster
Life-saving rules poster
Permit to work poster
Confined space entry poster
Working at height and ladder safety poster
Hot work safety poster
Forklift and pedestrian safety poster
Machine guarding poster
Electrical safety basics poster
Line of fire poster
Hand safety poster
Safe lifting (manual handling) poster
Workstation ergonomics poster
Hearing protection poster
Heat stress poster
GHS hazard pictograms poster
Eyewash station poster
Fire extinguisher classes poster
Unsafe acts and unsafe conditions poster
Safety observation conversation poster
Incident investigation steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
