Skip to content
LeanSuite - Lean Manufacturing Software

Safety poster

Updated · Free to print and share

Lockout tagout (LOTO) steps poster

Lockout tagout (LOTO) is the procedure for making a machine safe before anyone services, cleans or clears it: every energy source is isolated, locked and tagged, stored energy is released, and zero energy is verified before work starts. This poster shows the eight steps in order, from preparing to restoring, and the rule that matters most: each person applies their own lock and removes only their own lock.

Download the poster

The PNG is free to download now. The print-ready vector PDFs open after a short form, once.

Download PNG (300 dpi)2550 x 3300 px, prints at 8.5 x 11 in · 502 KB · no form

Free to print and share with your team. Enter your name and work email once to download.

Lockout tagout poster: eight numbered steps from prepare to restore, with a warning band saying never remove someone else's lock.
24 x 36 in18 x 24 inA2A3LetterA4PNG 300 dpi

The words on the poster

Lockout tagout: 8 steps

Before you clean, clear, adjust or repair any machine.

  • Prepare Find every energy source: electrical, hydraulic, pneumatic, mechanical, thermal, chemical, gravity.
  • Notify Tell the operators and everyone affected that the machine is being locked out.
  • Shut down Stop the machine the normal way, with its normal controls.
  • Isolate Open or close every isolation point: disconnects, breakers, valves.
  • Lock and tag Each person puts their own lock and tag on every isolation point.
  • Release stored energy Bleed pressure, block raised parts, discharge, let hot parts cool.
  • Verify Everyone clear, then try to start it. Test for zero energy. Controls back to off.
  • Restore Tools out, guards on, people clear and told. Each person removes only their own lock.
  • One person, one lock, one key. Never remove someone else's lock.

Sequence based on OSHA 29 CFR 1910.147. Always follow your site's written procedure for the machine.

On the floor

How to use it

  1. 1

    Post it at maintenance benches, lock stations and machines that are often cleared or cleaned.

  2. 2

    Use it in LOTO training next to the machine-specific procedure, step by step.

  3. 3

    Refer to it in a toolbox talk after any near miss involving stored energy.

  4. 4

    It is a reminder of the general sequence. Each machine still needs its own written procedure.

Which size to print

  • 24 x 36 in or A2: a main wall or team board, read from a few metres away.
  • 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
  • Letter or A4: a clipboard, binder or handout, on any office printer.

Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.

A poster reminds. A routine makes it stick.

See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.

Schedule Demo