Skip to content

Idea bank · 5S and visual management

5S ideas and examples: 50 practical changes for every step

Short answer

5S examples are small, concrete changes that make an area easier to work in and easier to keep that way. Below are 50 5S ideas, ten for each of the five steps: sort, set in order, shine, standardize and sustain. Each one names the problem, how much effort it takes and the free template that helps you put it in place. Filter by step, by the kind of area or by effort.

Last reviewed:

These are common shop-floor practices, not results from any one plant, so we give no savings figures. Take a photo before you start so that you can show what changed.

Where the 50 ideas sit

StepProduction line or cellMaintenance and tool cribWarehouse and dockOfficeAny areaIdeas
Sort (seiri)2212310
Set in order (seiton)3322none10
Shine (seiso)4121210
Standardize (seiketsu)2111510
Sustain (shitsuke)2nonenonenone810

The same 50 ideas by effort

  • Low effort: 40 ideas
  • Medium effort: 10 ideas

A grid of the 50 ideas counted by step and by area. Sort (seiri): 10 ideas. Set in order (seiton): 10 ideas. Shine (seiso): 10 ideas. Standardize (seiketsu): 10 ideas. Sustain (shitsuke): 10 ideas. By effort: 40 low effort, 10 medium effort.

Each cell counts the ideas in that step that act on that area; the darker the cell, the more ideas. The biggest group is sustain (shitsuke) against any area (8). Pick your row, then use the filters below.

Sort (seiri) (10)

Ideas to take out what the work does not need, so what is left is easy to see.

  1. A red tag holding area with a weekly review

    • Low effort
    • Any area
    Problem
    Items nobody can name an owner for stay at the stations because nobody is sure they can be thrown out.
    Idea
    Tag anything unused with a red tag and the date, move it to one marked area and decide each week whether it is kept, moved or removed.
  2. Sort each station by how often things are used

    • Low effort
    • Production line or cell
    Problem
    Stations hold every tool and fixture that was ever used there.
    Idea
    Split the items into used every shift, used weekly and not used in a month, and keep only the first group within reach.
  3. One shift of supplies at the point of use

    • Low effort
    • Production line or cell
    Problem
    Boxes of gloves, labels and fasteners pile up beside the line.
    Idea
    Keep one shift of supply at the station, and put the rest in a store where the refill is triggered by a card or a bin.
  4. Clear the old notices and signs

    • Low effort
    • Any area
    Problem
    Boards and walls are covered in outdated notices, so the current ones are missed.
    Idea
    Take everything down, put back only what is current and give each board an owner and a review date.
  5. Sort the spares crib by criticality

    • Medium effort
    • Maintenance and tool crib
    Problem
    The crib holds parts for machines that left years ago and lacks parts for machines that run today.
    Idea
    Match the stock to the equipment register, tag items for machines no longer on site and make sure the critical spares are there.
  6. Sort before you buy more racking

    • Low effort
    • Warehouse and dock
    Problem
    Storage looks full, so the answer seems to be more racking.
    Idea
    Count what is old, slow or damaged first, decide what to dispose of, and only then ask whether the storage is short.
  7. Sort the shared drive and the paper files

    • Low effort
    • Office
    Problem
    People cannot find the current version of a form among five old ones.
    Idea
    Archive anything not used in a year, keep one current version of each form and agree where each type of file lives.
  8. Sort the consumables cabinet

    • Low effort
    • Maintenance and tool crib
    Problem
    Cabinets hold three brands of the same fastener and opened tins of dried-out product.
    Idea
    Take everything out, remove what is expired, duplicated or unlabelled and put back only what is needed.
  9. A planned sort day for one area

    • Medium effort
    • Any area
    Problem
    A big clear-out is always going to happen next month.
    Idea
    Pick a date, tell people what to expect, supply tags and bins, and let the area team decide what stays.
  10. A simple rule for personal items

    • Low effort
    • Office
    Problem
    Desks and lockers fill with personal items and old paperwork.
    Idea
    Agree what may stay on the desk and what goes in a drawer, and check it as part of the office audit.

Set in order (seiton) (10)

Ideas for a place for everything, with the most-used item closest to the hand.

  1. Shadow boards for hand tools

    • Low effort
    • Production line or cell
    Problem
    Operators walk to a shared toolbox or search for a tool during the shift.
    Idea
    Hang each station's tools on a board with an outline for each, so a missing tool is obvious.
  2. Foam cut-outs in toolbox drawers

    • Medium effort
    • Maintenance and tool crib
    Problem
    Tools are tipped into drawers and the right size is never found first.
    Idea
    Cut foam to fit each tool so every tool has one place and the drawer shows at a glance what is missing.
  3. Mark a home for every cart and pallet

    • Low effort
    • Warehouse and dock
    Problem
    Carts and pallets are left wherever the last job finished.
    Idea
    Mark a home position on the floor for each cart, pallet and bin and label it with what lives there.
  4. Label every shelf and bin by location and part number

    • Low effort
    • Warehouse and dock
    Problem
    Pickers search shelves because labels are missing or the wrong way round.
    Idea
    Label the shelf, the bin and the part with the same code, and put the label where a person can read it at the height they stand.
  5. Put the most-used item nearest the hand

    • Low effort
    • Production line or cell
    Problem
    The item used every cycle is stored the furthest away.
    Idea
    Rank each item by how often it is used and place the most frequent between waist and shoulder height, closest to the operator.
  6. Colour-code oils and lubricants

    • Low effort
    • Maintenance and tool crib
    Problem
    Two similar-looking oils are in the same cabinet and one of them can destroy the gearbox.
    Idea
    Give each lubricant a colour on the container, funnel and grease gun, and put the same colour on the machine point.
  7. Two-bin refill for small consumables

    • Low effort
    • Production line or cell
    Problem
    The line stops for gloves, labels or fasteners that ran out.
    Idea
    Use two bins per item, and when the first is empty it triggers the refill while the second is in use.
  8. Label cables, switches and server racks

    • Low effort
    • Office
    Problem
    Nobody knows which plug is which until something breaks.
    Idea
    Label each cable at both ends and each breaker or switch with what it runs, and keep a simple key on the cabinet door.
  9. A supply cupboard laid out by use

    • Low effort
    • Office
    Problem
    Stationery and printer supplies are stacked at random and re-ordered by mistake.
    Idea
    Group by use, mark a minimum level on each shelf and name the person who reorders.
  10. Mark pipe contents and valve positions

    • Medium effort
    • Maintenance and tool crib
    Problem
    People guess at what a pipe carries and which way a valve is open.
    Idea
    Mark each pipe with its contents and flow direction, and each valve with its normal open or closed position.

Shine (seiso) (10)

Ideas that make cleaning an inspection, so problems show before they stop the line.

  1. Clean as an inspection

    • Low effort
    • Production line or cell
    Problem
    Cleaning is seen as a job for someone else, and defects hide under the dirt.
    Idea
    Have the operator clean the machine while looking for leaks, cracks, loose parts and wear, and tag each one found.
  2. Tag every abnormality found while cleaning

    • Low effort
    • Maintenance and tool crib
    Problem
    Operators notice a leak or loose bolt while cleaning and say nothing.
    Idea
    Hang a tag on each one with the date and a short note, log it and track it to the repair.
  3. Post a cleaning schedule with names

    • Low effort
    • Any area
    Problem
    Everybody assumes someone else cleans the shared area.
    Idea
    Post a schedule that shows what is cleaned, how often and by whom, and review it at the huddle.
  4. A cleaning kit at the station

    • Low effort
    • Production line or cell
    Problem
    The broom and cloths are in a cupboard two aisles away, so cleaning does not happen.
    Idea
    Keep a small cleaning kit at each station, with a shadow board outline, so cleaning takes seconds.
  5. Fix where the dirt comes from

    • Medium effort
    • Production line or cell
    Problem
    The same spot is swept every shift because chips, coolant or dust keep landing there.
    Idea
    Add a cover, a splash guard or a tray at the source, and stop cleaning up what could be prevented.
  6. Before and after photos on the board

    • Low effort
    • Any area
    Problem
    People do not believe a clean-up made a difference.
    Idea
    Take a photo before and after each clean-up, post both on the area board and use them as the reference for the audit.
  7. Clean and replace the lighting

    • Low effort
    • Warehouse and dock
    Problem
    Dirty or failed lights make labels hard to read and hide hazards.
    Idea
    Add the lights to the cleaning schedule and report any dim or failed fitting through the same tag system.
  8. Clean racks, trucks and dock areas on a schedule

    • Low effort
    • Warehouse and dock
    Problem
    Dust and packaging build up on beams and at the dock door and hide damage.
    Idea
    Add racks, trucks and the dock to the cleaning schedule and inspect for damage as they are cleaned.
  9. A fixed clean and reset at the end of each shift

    • Low effort
    • Production line or cell
    Problem
    The next shift starts by clearing up the last one's mess.
    Idea
    Set a fixed time at the end of every shift to clean and put everything back, and check it at the start of the next shift.
  10. A weekly desk and equipment wipe-down

    • Low effort
    • Office
    Problem
    Keyboards, phones and shared equipment are never cleaned.
    Idea
    Add a short weekly clean to the office routine and log it on the audit.

Standardize (seiketsu) (10)

Ideas that turn a good state into the way every team and every shift keeps the area.

  1. A photo of how the area should look

    • Low effort
    • Any area
    Problem
    Different people judge different things as tidy.
    Idea
    Put a photo of the agreed standard on the area board and the audit sheet, so everyone compares against the same thing.
  2. One 5S checklist per area

    • Low effort
    • Any area
    Problem
    The audit is a general form, so it misses what matters in each area.
    Idea
    Adapt the checklist to the area, keeping the questions short and specific, and agree it with the team who use the area.
  3. One colour code across the plant

    • Medium effort
    • Any area
    Problem
    Yellow means walkway in one area and hazard in another.
    Idea
    Agree one colour code for floors, labels and tags, publish it and apply it area by area.
  4. A standard tool board layout for similar stations

    • Medium effort
    • Production line or cell
    Problem
    Every line has a different board, so people moving between lines lose time.
    Idea
    Use the same board layout for stations that do the same work, so a person who moves can find a tool without asking.
  5. A cleaning standard on one page

    • Low effort
    • Any area
    Problem
    Cleaning instructions exist only in someone's head.
    Idea
    Write what is cleaned, with what, how often and what good looks like, on one page at the machine.
  6. Naming rules for files and folders

    • Low effort
    • Office
    Problem
    The same document has five names and nobody finds the latest one.
    Idea
    Agree a short naming rule and a folder map, and show them at the top of the shared drive.
  7. Minimum and maximum markers on shelves

    • Low effort
    • Warehouse and dock
    Problem
    Nobody knows how much of an item is too much or too little.
    Idea
    Mark the minimum and maximum quantity on each shelf or bin, and tie the minimum to a reorder card.
  8. Green and red zones on gauges

    • Low effort
    • Maintenance and tool crib
    Problem
    Operators read a pressure gauge but do not know what the right reading is.
    Idea
    Mark the normal range in green and the limit in red on each gauge, so an abnormal reading is obvious at a glance.
  9. 5S in the new-starter training

    • Low effort
    • Any area
    Problem
    New people learn the standard by watching someone cut a corner.
    Idea
    Put the area standard and the photo into the onboarding plan and sign it off with the trainer.
  10. Copy a good layout to other lines

    • Medium effort
    • Production line or cell
    Problem
    One cell gets a good set-up and nobody else sees it.
    Idea
    Photograph and describe the layout, share it at the plant meeting and offer to help the next area adopt it.

Sustain (shitsuke) (10)

Ideas that keep the habit going after the first clean-up fades.

  1. A short weekly audit by the area team

    • Low effort
    • Any area
    Problem
    The area is tidy after the big clean-up and slips within a month.
    Idea
    Have the team score their own area every week against the checklist, and post the score and the photos.
  2. Audit another team's area

    • Low effort
    • Any area
    Problem
    People are used to their own area and stop seeing the problems.
    Idea
    Pair teams so each audits the other's area on a rota, and give the findings back in person.
  3. Post each area's score on the board

    • Low effort
    • Any area
    Problem
    Nobody sees how 5S is going, so it is nobody's priority.
    Idea
    Show the trend of each area's score on the area board and at the tier meeting.
  4. Leaders ask one 5S question on the gemba walk

    • Low effort
    • Any area
    Problem
    Supervisors walk past a drifting area every day and say nothing.
    Idea
    Add one 5S question to the leader's walk, such as asking an operator to show where a tool lives.
  5. Two minutes on 5S at the huddle

    • Low effort
    • Production line or cell
    Problem
    5S comes up only at audit time.
    Idea
    Spend two minutes at the start of the shift on the area score, one thing to fix and who will do it.
  6. Recognise the most improved area

    • Low effort
    • Any area
    Problem
    The best area is always the same one, and the others stop trying.
    Idea
    Recognise the area that improved most, not only the one with the highest score.
  7. Put 5S time in the shift schedule

    • Medium effort
    • Production line or cell
    Problem
    5S happens only when production lets it.
    Idea
    Set a fixed slot for 5S in the shift plan and protect it the same way as a changeover or a break.
  8. Find out why when a score drops

    • Low effort
    • Any area
    Problem
    Scores slip and the response is to tell people to try harder.
    Idea
    Ask why the standard was not kept, whether it was a missing bin, a poor layout or no time, and fix that.
  9. Track audit findings as actions

    • Low effort
    • Any area
    Problem
    Audit findings go on a sheet and are forgotten.
    Idea
    Turn every failed line into an action with an owner and a date, and review them at the tier meeting.
  10. Review the standard once a year

    • Medium effort
    • Any area
    Problem
    The layout and the checklist stay the same while the work changes.
    Idea
    Review each area's standard, photos and checklist once a year with the team and update what no longer fits the work.

How to use this list

  1. 1

    Pick one area and take a photo

    Start where the team feels the pain. Photograph it before any change, so the before and after are on record.

  2. 2

    Work through the steps in order

    Sort first, because it is hard to arrange what you do not need. Then set in order, shine, standardize and sustain. Skipping to a clean-up or a floor marking without sorting makes a tidy mess.

  3. 3

    Let the team decide

    The people who use the area choose what stays, where it lives and what good looks like. An area designed by someone else is not kept.

  4. 4

    Audit it, then fix the cause of any slip

    Score the area against the checklist every week. When the score drops, ask why and fix the cause instead of asking people to try harder.

Low effort

The team can do it within its own area in a day or two, with little or no spending.

Medium effort

A few weeks, a small budget or help from another department, such as maintenance or engineering.

What each area means
Production line or cell
Stations, cells and lines where product is made.
Maintenance and tool crib
The workshop, crib, spares and lubricant store.
Warehouse and dock
Receiving, storage, picking and shipping.
Office
Desks, files, shared drives and supply cupboards.
Any area
Ideas that work the same way wherever they are used.

FAQ

5S ideas and examples: common questions

  1. Red tagging items that are not needed (sort), shadow boards and labelled bins (set in order), cleaning a machine while checking it for leaks (shine), photo standards and one checklist per area (standardize), and a weekly audit by the area team (sustain). This page lists 50, ten for each step.

  2. Sort, set in order, shine, standardize and sustain. They come from the Japanese words seiri, seiton, seiso, seiketsu and shitsuke. Some companies add a sixth S for safety.

  3. Start with one area where the problem is obvious to the people who work there, take a photo, and begin with sort. Do not roll 5S out to the whole plant at once. A single area done well is easier to copy than ten done halfway.

  4. Yes. The same steps apply to files, shared drives, supply cupboards and cables: remove what is not used, give each item a place, keep it clean, agree a standard and check it. The free office 5S audit checklist is a starting point.

  5. Usually because the sort and clean-up get done and the audit does not. Without a regular check, a visible score and a fix for the cause when the score drops, the area drifts back. The sustain ideas on this page are aimed at that.

  6. Score each line of a checklist in the same way every time, for example pass or fail with a photo, and show the result by area. The free 5S audit checklist gives a scoring layout, and the 5S guide shows a worked score.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.