Safety guide · Safety management
Lockout tagout (LOTO): what it is, the steps, and what OSHA 1910.147 requires
Short answer
Lockout tagout (LOTO) is the procedure that shuts a machine down, cuts it off from every energy source and holds each isolating device in the off position with a lock or a tag, so nothing can start or move while a person works on it. In the United States it is required by OSHA standard 29 CFR 1910.147, the control of hazardous energy.
Lockout means a lock on the disconnect, valve or block, so it physically cannot be switched back on. Tagout means a warning tag on the same point, which tells people not to operate it but does not stop them. The steps run in a fixed order: prepare, notify the people affected, shut the machine down, isolate every energy source, put on locks and tags, release stored energy, and verify the machine will not start. Each authorized person fits their own lock and takes off only their own lock. OSHA also requires a written procedure for each machine, apart from a narrow exception, plus training and a periodic inspection of every procedure at least once a year.
Last reviewed:
What is lockout tagout? Lockout vs tagout
LOTO is short for lockout/tagout, also written lock out tag out. It is named after the two kinds of device that hold a machine safe. 29 CFR 1910.147(b) defines lockout as placing a lockout device, such as a keyed or combination padlock, on an energy isolating device so that the device and the machine it controls cannot be operated until the lock comes off. Tagout is placing a tagout device, a prominent warning tag with a secure attachment, on the same kind of point to show that it may not be operated until the tag is removed.
The difference matters on the floor. A lock is physical: nobody can close the disconnect without cutting it off. A tag is only a message. 29 CFR 1910.147(c)(7)(ii)(A) makes the point in the training rules: tags are warning devices and do not give the physical restraint a lock gives, and 1910.147(c)(7)(ii)(E) adds that a tag can give a false sense of security.
Lockout against tagout under 29 CFR 1910.147
Lockout
- What goes on the isolating device
- A lock (or a blank flange or bolted slip blind) that holds it in the off position
- What it prevents
- Operation, until the lock is removed
- When the program must use it
- Whenever the isolating device can take a lock, 1910.147(c)(2)(ii)
- Extra conditions
- None beyond the standard
Tagout
- What goes on the isolating device
- A warning tag with a self-locking attachment, fixed where the lock would go
- What it prevents
- Nothing physically; it warns against operation
- When the program must use it
- When the device cannot take a lock, 1910.147(c)(2)(i), or where the employer shows tagout gives full employee protection, 1910.147(c)(3)
- Extra conditions
- Tag at the same point a lock would go, 1910.147(c)(3)(i), plus extra measures such as removing a valve handle, 1910.147(c)(3)(ii), and extra training on the limits of tags, 1910.147(c)(7)(ii)
An energy isolating device is the thing that actually cuts the energy: a manually operated circuit breaker, a disconnect switch, a line valve, a block. Under 1910.147(b), push buttons, selector switches and other control circuit devices are not energy isolating devices. An emergency stop or a guard interlock stops the machine through the control circuit. It does not isolate it, and a lock on an e-stop is not a lockout.
When is lockout tagout required?
29 CFR 1910.147(a)(1)(i) covers servicing and maintenance of machines and equipment where an unexpected start-up, or a release of stored energy, could injure someone. The definition of servicing and maintenance in 1910.147(b) is wider than most people expect: it includes setting up, adjusting, inspecting, modifying, lubricating, cleaning, unjamming and tool changes, wherever the person could be exposed to unexpected energization or a release of energy.
Normal production is not covered, 1910.147(a)(2)(ii), with two exceptions. Servicing during production is covered if the person has to take off or get round a guard or another safety device, 1910.147(a)(2)(ii)(A), or has to put any part of their body into the point of operation or a danger zone of the machine cycle, 1910.147(a)(2)(ii)(B). That is why reaching into a filler to clear a bottle is a lockout task even though the line is in production.
The note to 1910.147(a)(2)(ii) gives the one production exception. Minor tool changes, adjustments and other minor servicing during normal production are outside the standard if they are routine, repetitive and integral to using the machine for production, and only if the work is done with alternative measures that give effective protection. The exception is narrow. A task that needs a hand inside a moving area with the machine able to start does not qualify because it is quick.
| Task | Covered? | Why, by paragraph |
|---|---|---|
| Changing a conveyor belt | Yes | Servicing and maintenance, 1910.147(a)(1)(i) and the definition in 1910.147(b) |
| Clearing a jammed carton inside the guarded area | Yes | Guard opened and hands in the danger zone, 1910.147(a)(2)(ii)(A) and (B) |
| Cleaning a mixer bowl at the end of the shift | Yes | Cleaning is servicing under 1910.147(b) when the mixer could start or move |
| Changing a label roll from outside the guard with the machine at a safe stop | Possibly not | Only if it meets every condition of the note to 1910.147(a)(2)(ii), with effective alternative protection |
| Unplugging a hand tool to change its blade, plug kept in your hand | No | Cord and plug equipment under exclusive control of the person, 1910.147(a)(2)(iii)(A) |
Illustrative. Each plant decides its own list and writes the alternative measures for any task it treats as minor servicing.
1910.147(a)(1)(ii) leaves some work to other rules: construction and agriculture, maritime work under parts 1915, 1917 and 1918, electric utility generation, transmission and distribution, oil and gas well drilling and servicing, and electrical hazards when working on or near conductors, which are left to the electrical rules in subpart S. For a plant, the practical reading is that 1910.147 covers the mechanical, fluid and stored energy of the machines, and electrical safe work practices for live electrical work sit in subpart S.
Types of hazardous energy LOTO controls
1910.147(b) defines an energy source as any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal or other energy. The standard also treats a machine as energized if it still holds residual or stored energy after it is disconnected. Appendix A, OSHA's non-mandatory sample procedure, lists the stored energy to look for: charged capacitors, compressed springs, raised parts of the machine, flywheels still turning, hydraulic systems, and pressure held in air, gas, steam or water lines.
| Energy | Where you find it | Isolate with | Check it is gone |
|---|---|---|---|
| Electrical | Motors, drives, heaters, control panels | Lockable disconnect or breaker | Try the start and jog buttons; an electrician tests for voltage where the procedure says so |
| Mechanical | Flywheels, springs, cams, coasting rollers | Wait for rundown, block or pin the part | Watch it stop; the block is in place |
| Hydraulic | Presses, lifts, clamps, accumulators | Lockable valve, bleed the accumulator | Gauge reads zero |
| Pneumatic | Cylinders, grippers, air knives | Lockable dump valve on the air supply | Gauge reads zero, cylinders move freely by hand |
| Gravity (stored) | Raised rams, platens, lift tables, elevators | Lower to the bottom, or block or pin | Block fitted, nothing can drop |
| Thermal | Heat sealers, ovens, steam lines | Isolate the supply and let it cool | Temperature checked before contact |
| Chemical | Dosing pumps, CIP lines, process piping | Close and lock the line valve, blank or blind the line | Line drained and pressure released at the bleed point |
Most machines have more than one source. A case packer can have electrical, pneumatic and gravity energy at once, and each one needs its own isolation point, its own lock and its own check.
Stored energy is where lockouts fail. The power is off, the machine looks dead, and an accumulator, a spring or a raised platen still holds enough energy to injure. 29 CFR 1910.147(d)(5)(i) requires all potentially hazardous stored or residual energy to be relieved, disconnected, restrained or otherwise made safe after the locks go on. Where it can build up again, as with a slowly leaking valve upstream of a cylinder, 1910.147(d)(5)(ii) requires the check to continue until the work is done.
Lockout tagout steps in order
29 CFR 1910.147(d) sets out six elements that every lockout or tagout procedure must cover, in a fixed sequence. Add the notification that 1910.147(c)(9) requires before the locks go on, and the sequence on the floor looks like this.
Lockout tagout in eight steps
- 1(d)(1)
Prepare for shutdown
- 2(c)(9)
Notify affected employees
- 3(d)(2)
Shut the machine down
- 4(d)(3)
Isolate every energy source
- 5(d)(4)
Apply locks and tags
- 6(d)(5)
Release stored energy
- 7(d)(6)
Verify isolation
- 8(e)
Release and restart
- 1
Prepare for shutdown
Before anyone switches the machine off, the authorized employee knows the type and size of each energy source, its hazards, and how to control it, 1910.147(d)(1). In practice this means reading the machine's own procedure, not working from memory.
- 2
Notify the affected employees
Operators and anyone working in the area are told the machine is being locked out, before the locks go on, 1910.147(c)(9). A word at the line and a note on the board is enough when everyone is told.
- 3
Shut the machine down
Stop it with its normal stopping method, in an orderly way, so the stop does not create a new hazard, 1910.147(d)(2). A line stopped mid cycle can leave product, tooling or a raised part in a dangerous place.
- 4
Isolate every energy source
Find and operate every energy isolating device the machine needs: disconnects, valves, blocks, 1910.147(d)(3). The procedure lists them, ideally with a photo and a number for each point.
- 5
Apply locks and tags
Each authorized employee fits a lock to each isolating device, holding it in the safe or off position, 1910.147(d)(4)(i) and (ii). Where a tag is used, it goes at the point the lock would have gone, or as close as safely possible, 1910.147(d)(4)(iii).
- 6
Release or restrain stored energy
Bleed air and hydraulic pressure, block or lower raised parts, let flywheels stop, discharge or ground where the procedure says so, 1910.147(d)(5)(i).
- 7
Verify isolation
Before touching the machine, prove it is dead: press start, try the jog, read the gauges, 1910.147(d)(6). Then put the controls back to off, so the machine does not start when the locks come off later. Appendix A gives this caution in its sample procedure.
Why sources give 6, 7, 8 or 9 steps
The count depends on how the same sequence is cut. Six steps follows paragraph (d) exactly, from preparation to verification. Seven adds notification as its own step, as Appendix A does. Eight adds release from lockout and restart, which is paragraph (e); the free lockout tagout poster uses that eight-step version. Nine splits out returning the controls to off or notifying people at the end. None of the versions adds a requirement the others leave out. What matters is that your written procedure covers every element of 1910.147(d) and (e) in order.
Removing locks and restarting the machine
Taking a machine out of lockout has its own sequence under 29 CFR 1910.147(e). First the work area is inspected so tools, rags and loose parts are gone and the machine is operationally intact, 1910.147(e)(1). Then the area is checked so that every person is clear or safely positioned, 1910.147(e)(2)(i). Each lock or tag is removed by the person who put it on, 1910.147(e)(3). After the devices are off and before the machine starts, affected employees are told, 1910.147(e)(2)(ii).
The common floor problem is the lock left on by someone who has gone home. The exception to 1910.147(e)(3) allows a lock to be removed under the employer's direction only through a specific written procedure, with training, that gives equivalent safety. It must at least include verifying the person who applied it is not at the facility, 1910.147(e)(3)(i), making all reasonable efforts to contact them, 1910.147(e)(3)(ii), and making sure they know before they start work again, 1910.147(e)(3)(iii). Bolt cutters and a supervisor's say-so are not that procedure.
Some jobs need power for a moment during the work, to jog a conveyor into position or test a sensor. 1910.147(f)(1) gives the order for that: clear tools and materials, get people out of the area, remove the locks as in paragraph (e)(3), energize and test or position, then de-energize and reapply the full lockout from paragraph (d) before work continues. The test run is a short restart, not a pause in the lockout.
What lockout tagout locks and tags must be
The employer provides the hardware: locks, tags, chains, wedges, key blocks, adapter pins and self-locking fasteners, 29 CFR 1910.147(c)(5)(i). Lockout and tagout devices must be singularly identified, used only for controlling energy and for nothing else, 1910.147(c)(5)(ii). A LOTO padlock that also locks a tool cabinet breaks the rule.
| Requirement | What it means | Paragraph |
|---|---|---|
| Durable | Survives the conditions it is used in for as long as it is used. Tags stay legible when wet, damp or exposed to acids and alkalis | 1910.147(c)(5)(ii)(A) |
| Standardized | Standard across the facility in colour, shape or size. Tags also standard in print and format | 1910.147(c)(5)(ii)(B) |
| Substantial | A lock cannot come off without excessive force such as bolt cutters. A tag attachment is non-reusable, attachable by hand, self-locking, with an unlocking strength of at least 50 pounds, at least equal to a one-piece nylon cable tie | 1910.147(c)(5)(ii)(C) |
| Identifiable | Shows who applied it | 1910.147(c)(5)(ii)(D) |
A tag must also warn of the hazard if the machine is energized and carry a warning legend; the examples in 1910.147(c)(5)(iii) include Do Not Start, Do Not Operate and Do Not Energize.
Identifiable is the requirement people ask about most. It means anyone who finds the lock can tell whose it is, usually a name and photo label on the lock or a tag attached to it. That is what lets a supervisor find the person before anyone touches the lock, and it is why plants issue one set of personal locks per authorized employee rather than a shared box of spares.
Group lockout: when a crew works on one machine
When a crew, craft or department services a machine together, 29 CFR 1910.147(f)(3)(i) requires a group procedure that protects each person as well as their own personal lock would. 1910.147(f)(3)(ii) sets out what it must include.
- One authorized employee holds primary responsibility for the people working under the group lock, 1910.147(f)(3)(ii)(A). The standard gives an operations lock as an example of a group device.
- That person can check the exposure status of each member of the group, 1910.147(f)(3)(ii)(B).
- When more than one crew or department is involved, one authorized employee coordinates the whole job and keeps protection continuous, 1910.147(f)(3)(ii)(C).
- Each authorized employee puts a personal lock or tag on the group lockout device, group lockbox or similar when they start, and takes it off when they stop working on the machine, 1910.147(f)(3)(ii)(D).
A common way to run it is a lockbox. This example is illustrative. A conveyor drive needs three isolation points: the motor disconnect, the air supply and a pin in the take-up. The lead authorized employee locks all three points with group locks and drops the three keys in the lockbox. Two mechanics and an electrician each put a personal lock on the box. Count the locks twice: 3 group locks on the points plus 3 personal locks on the box is 6 locks in use; the other way, 3 isolation points and 3 people, 3 + 3 = 6. The box cannot open until the last person has finished and taken their own lock off.
Contractors bring their own program. Under 1910.147(f)(2), the plant and the outside employer tell each other about their lockout procedures, and the plant makes sure its own people understand and follow the restrictions of the contractor's program.
Lockout at shift change
A repair that runs past the end of a shift is the moment a machine is most likely to be left with the wrong lock on it, or none. 29 CFR 1910.147(f)(4) requires specific procedures for shift or personnel changes so that protection continues, including an orderly transfer of lockout or tagout protection between the people going off shift and the people coming on.
The standard does not prescribe the method. One way plants meet it, shown here as an example and not as wording from the standard: the off-going and oncoming authorized employees meet at the machine. They walk the isolation points together against the procedure. The oncoming person applies their personal lock to each point, or to the group lockbox, and only then does the off-going person remove theirs. At no moment is the machine without a lock from someone who is responsible for it. The handover goes in the shift log so the next supervisor knows the machine is down and who holds it.
The free shift handover template puts lockouts and permits still in place in its first section, safety, so the incoming lead reads them before anything else.
The energy control program and written procedures
A hazardous energy control program is the set of three things 29 CFR 1910.147(c)(1) requires an employer to establish: energy control procedures, employee training, and periodic inspections. Together they make sure every machine is isolated and made inoperative before anyone services it.
The procedures must be developed, documented and used, 1910.147(c)(4)(i). 1910.147(c)(4)(ii) says what each one must contain:
- A specific statement of what the procedure is for, 1910.147(c)(4)(ii)(A).
- The steps for shutting down, isolating, blocking and securing the machine, 1910.147(c)(4)(ii)(B).
- The steps for placing, removing and transferring locks and tags, and who is responsible for them, 1910.147(c)(4)(ii)(C).
- How to test the machine to verify the locks, tags and other controls work, 1910.147(c)(4)(ii)(D).
The note to 1910.147(c)(4)(i) lets an employer skip documenting the procedure for a machine only when all eight of its conditions hold, among them a single energy source that is easy to identify and isolate, no stored or residual energy, a single lock that achieves lockout under the exclusive control of the person doing the work, and no past accidents from unexpected activation of that machine. Most production machines fail at least one of those, so most need their own written procedure. The free lockout tagout procedure template is laid out for one machine: an energy table with each isolation point numbered against a photo, the steps from shutdown to restart, the authorized employees and the review record.
Who may lock out matters as much as how. Only the authorized employees doing the servicing perform lockout or tagout, 1910.147(c)(8). The definitions in 1910.147(b) separate authorized employees, who lock out machines to service them, from affected employees, who operate the machine or work in the area where it is serviced. The training rules in 1910.147(c)(7)(i)(C) add everyone else whose work may take them into that area.
LeanSuite runs written procedures on a phone or tablet: Lockout/Tagout (LOTO) requires a photo of each applied lock at the correct isolation point before the next step opens, only opens a procedure for someone with a valid Authorized Employee certification for that machine, shows every active lockout on a live floor map with who holds each lock and for how long, and gives each procedure an owner and a review date with an alert before it lapses.
Periodic inspection: once a year, every procedure
29 CFR 1910.147(c)(6)(i) requires a periodic inspection of each energy control procedure at least annually, to make sure the procedure and the standard are being followed. The inspection is done by an authorized employee other than the people using the procedure being inspected, 1910.147(c)(6)(i)(A), and it is there to correct any deviation or inadequacy found, 1910.147(c)(6)(i)(B).
Where lockout is used, the inspector reviews with each authorized employee their responsibilities under that procedure, 1910.147(c)(6)(i)(C). Where tagout is used, the review covers each authorized and each affected employee, plus the limits of tags from 1910.147(c)(7)(ii), 1910.147(c)(6)(i)(D). The employer certifies each inspection with the machine, the date, the employees included and the person who inspected, 1910.147(c)(6)(ii).
This example is illustrative. A plant has 36 machine-specific procedures. Inspecting them all in one week each December puts the work on top of the year-end shutdown and leaves eleven months with no checks. Spreading them evenly gives 36 / 12 = 3 inspections a month; check it the other way, 3 a month for 12 months is 36. Each one is a walk of the machine with the procedure in hand while an authorized employee carries out the lockout, so a missing energy source or a valve that was moved shows up.
| Field required by 1910.147(c)(6)(ii) | Entry |
|---|---|
| Machine or equipment | Case packer CP-2, procedure LOTO-CP2 |
| Date of the inspection | The date the walk was done |
| Employees included | The authorized employees reviewed, by name |
| Person performing the inspection | An authorized employee who does not use LOTO-CP2 |
Plants usually add what was found and what was changed, because 1910.147(c)(6)(i)(B) requires deviations to be corrected and a finding that triggers retraining has to be traceable. The [OSHA compliance calendar](/templates/osha-compliance-calendar) holds the annual dates.
Lockout tagout training and retraining
29 CFR 1910.147(c)(7)(i) requires training so that employees understand the purpose and function of the program and have the knowledge and skills to apply, use and remove the controls safely. The depth depends on the role.
| Role | Who that is on a line | Training required | Paragraph |
|---|---|---|---|
| Authorized employee | Maintenance techs, setup people, operators who clear jams under lockout | Recognizing hazardous energy sources, the type and size of energy in the workplace, and the methods to isolate and control it | 1910.147(c)(7)(i)(A) |
| Affected employee | Operators of the machine and people who work in its area | The purpose and use of the energy control procedure | 1910.147(c)(7)(i)(B) |
| Other employees | Anyone whose work may take them into the area | That the procedure exists and that they must not try to restart a locked or tagged machine | 1910.147(c)(7)(i)(C) |
| Anyone in a tagout system | All of the above where tags are used | The limits of tags, in six points | 1910.147(c)(7)(ii) |
An affected employee becomes an authorized employee when their duties start to include servicing covered by the standard, 1910.147(b). Operators who clear jams under lockout need authorized training.
Retraining is required for authorized and affected employees when their job assignment changes, when a machine, piece of equipment or process changes in a way that brings a new hazard, or when the procedure changes, 1910.147(c)(7)(iii)(A). It is also required when a periodic inspection shows, or the employer has reason to believe, that someone's knowledge or use of the procedure has gaps, 1910.147(c)(7)(iii)(B). The employer certifies that training is done and kept up to date, with each employee's name and training dates, 1910.147(c)(7)(iv). A training matrix with expiry dates is the usual way to see who is authorized on which machine.
Worked example: clearing a jam on a case packer
This example is illustrative. A case packer on a bottling line jams twice a shift with a crushed case inside the guarded flap folder. Clearing it means opening the guard door and reaching in, so it is covered by 1910.147(a)(2)(ii)(A) and (B) and is not minor servicing. The machine's procedure lists three energy sources.
| Point | Energy | Isolation device | How it is verified |
|---|---|---|---|
| E1 | Electrical, 480 V to the main panel | Lockable main disconnect on the panel door | Press start and jog at the operator panel: nothing moves |
| E2 | Pneumatic, 80 psi to the flap and case cylinders | Lockable dump valve on the air drop | Gauge on the regulator reads 0; cylinders push freely by hand |
| E3 | Gravity, the raised case elevator | Lower to the bottom stop, fit the safety pin | Pin through the frame and the elevator; elevator cannot drop |
Three points, so a single operator clearing the jam fits three personal locks: one on the disconnect, one on the dump valve, one through the safety pin's lock hole.
- 1
Prepare and notify
The operator, trained as an authorized employee for CP-2, reads the procedure card on the machine and tells the line lead and the palletizer operator downstream that CP-2 is going into lockout.
- 2
Stop, isolate, lock
Normal stop at the panel, so the cycle finishes and the flaps open. Disconnect off and locked (E1), dump valve closed and locked (E2).
- 3
Release stored energy
The dump valve vents the air in the cylinders. The elevator is lowered to its bottom stop by hand and pinned, and the pin is locked (E3).
- 4
Verify
Start and jog tried, nothing moves. Gauge reads zero. Controls back to off. Only now does the guard door open.
- 5
Clear, then release
Crushed case removed. Guard door shut, rags and the hook tool taken out, people clear. The operator removes the three locks, tells the line lead CP-2 is coming back, and restarts.
The repeat jam is the real finding. Two lockouts a shift on one machine is a signal to fix the cause, a flap guide or a worn case magazine, not to look for a quicker way in. Logging each jam as a tag gives maintenance the count and the pattern; a job safety analysis of the clearing task shows where the hazard is if the jam cannot be designed out yet.
Common lockout tagout mistakes
- Locking the e-stop or the selector switch. Control devices are not energy isolating devices under 1910.147(b). Lock the disconnect, the valve or the block.
- Skipping the verify step because the machine looks off. 1910.147(d)(6) requires proof before work starts, and the try is the only test that tells off from dead.
- Forgetting stored energy. Air left in a cylinder, a raised elevator, a charged accumulator. 1910.147(d)(5)(i) requires each one to be released or restrained.
- One generic procedure for every machine. Most machines fail the eight conditions in the note to 1910.147(c)(4)(i) and need their own written procedure.
- A procedure that no longer matches the machine. A new air drop or a moved disconnect makes the sheet wrong. The annual inspection under 1910.147(c)(6) is where it gets caught, and a change to the procedure triggers retraining under 1910.147(c)(7)(iii)(A).
- Removing someone else's lock. Only the person who applied a lock removes it, 1910.147(e)(3), unless the written exception procedure is followed in full.
- Treating jam clearing as minor servicing. If the guard comes off or a hand goes into the danger zone, it is covered by 1910.147(a)(2)(ii).
- Using LOTO locks for other jobs. Lockout devices are for energy control only, 1910.147(c)(5)(ii).
Lockout/Tagout (LOTO)
Run lockout tagout in LeanSuite
Lockout/tagout software that replaces paper LOTO binders: LeanSuite guides authorized staff through each isolation step with photos and keeps a time-stamped audit trail.
Go deeper
This page is the short version. These guides cover each part in full.
- 7 Preventable Shop Floor Incidents Most Plants MissElectrical and lockout tagout failures as one of seven incident types, and the three gaps that undermine LOTO programs.
- OSHA Audit Preparation: Reducing 40 Hours to 4 HoursThe written programs and training records an OSHA inspection asks for, including an out of date lockout program.
- Top Five Common Manufacturing HazardsWhere lockout sits among the main hazards on a plant floor, next to machine guarding and interlocks.
- Near Miss Reporting That Actually Prevents Future IncidentsHow to get the near misses reported, including a machine that moved during servicing, and close each one.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Lockout tagout posterThe eight LOTO steps from preparing to restoring, with one person, one lock, one key, for the lock station.
- Lockout/tagout (LOTO) procedure templateA machine-specific LOTO procedure: energy sources and isolation points, the steps from shutdown to restart, and the annual review.
- Job safety analysis (JSA) templateJob steps, hazards, risk scored before and after the controls, the hierarchy of controls, PPE and sign-off.
- Machine guarding inspection sheetA machine register with due dates and a status per machine, 21 checks tied to OSHA 1910.212, .219 and .147, a guard opening check against Table O-10, and an action log.
- Training matrix template with expiry datesPeople by required trainings with expiry dates, OK, due, expired and missing flags, compliance by person and area, cover per training and a renewal list.
- Safety audit checklistThirty-four plant-wide safety checks answered Yes, No or N/A, scored by area, with a risk rating and an action for every No.
- Work order template for maintenanceA work order template for maintenance: one form per job from request to handback, and a log of response, completion and backlog by priority.
Doing this in LeanSuite
Lockout/Tagout (LOTO)
Replaces paper LOTO binders: guides authorized staff through each isolation step with a photo of every lock, and keeps a time-stamped audit trail.
See Lockout/Tagout (LOTO)Competency Management
Ties each LOTO procedure to the Authorized Employee certification it needs, so an expired or missing certification blocks the procedure from opening.
See Competency ManagementSafety tags
Anyone on the floor reports a hazard, near miss or unsafe condition in seconds, it is routed to an owner and tracked until it is fixed.
See Safety tags
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about lockout tagout (LOTO)
Lockout tagout is the procedure for shutting a machine down, isolating it from every energy source and holding each isolating device off with a lock or a warning tag, so it cannot start or release stored energy while someone services it. In the United States it is required by OSHA 29 CFR 1910.147.
LOTO is short for lockout/tagout, the two devices the procedure uses. Lockout puts a lock on the energy isolating device so it physically cannot be operated. Tagout puts a warning tag on it to say it must not be operated. OSHA defines both in 29 CFR 1910.147(b).
The six elements in 29 CFR 1910.147(d), in order: prepare for shutdown, shut the machine down, isolate it from every energy source, apply locks or tags, release or restrain stored energy, and verify isolation before work starts. Affected employees are notified before the locks go on, under 1910.147(c)(9).
They split the same sequence differently. Seven steps adds notification of affected employees as its own step. Eight adds release from lockout and restart from 29 CFR 1910.147(e). Nine also splits out returning controls to off or notifying people at the end. No version adds a requirement the six-step version leaves out.
Under 29 CFR 1910.147(c)(5) a tag must be durable and legible in wet, damp or corrosive conditions, standardized in print and format across the facility, fixed with a non-reusable self-locking attachment of at least 50 pounds unlocking strength, show who applied it, and warn against the hazard with a legend such as Do Not Start or Do Not Operate.
It means the lock or tag shows the identity of the person who applied it, as 29 CFR 1910.147(c)(5)(ii)(D) requires. Anyone who finds it can tell whose it is, which is why each authorized employee has their own named locks.
It is the program 29 CFR 1910.147(c)(1) requires every covered employer to set up: written energy control procedures, employee training, and periodic inspections of the procedures at least once a year. Together they make sure machines are isolated and made inoperative before anyone services them.
OSHA 29 CFR 1910.147(b) names electrical, mechanical, hydraulic, pneumatic, chemical and thermal energy, plus any other energy. Stored energy counts too: springs, capacitors, raised machine parts, flywheels and trapped air, gas, steam or water pressure must be released or restrained under 1910.147(d)(5).
The person who applied it, under 29 CFR 1910.147(e)(3). If that person is not at the facility, the lock can be removed under the employer's direction only through a written procedure that confirms they are gone, makes every reasonable effort to contact them, and makes sure they know before they return to work.
At least once a year for each procedure, under 29 CFR 1910.147(c)(6)(i), by an authorized employee who does not use that procedure. The employer certifies each inspection with the machine, the date, the employees included and the inspector.
Usually yes. Unjamming is servicing under 29 CFR 1910.147(b), and during production the standard applies whenever a guard is removed or bypassed or a body part goes into the point of operation or a danger zone. The minor servicing exception covers only routine, repetitive tasks done with effective alternative protection.
Related guides and tools
- Lockout tagout procedure template: one machine's energy table, numbered isolation points, steps and review record
- Lockout tagout poster: the eight steps as a free printable for the lock station
- Lockout/Tagout in LeanSuite: photo-verified isolation steps and a live map of active lockouts
- Safety moments: four short LOTO talks for the start of a shift, with a question for the team
- Job hazard analysis: break a servicing task into steps and find the hazards before the lockout
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.