A kaizen savings calculation turns what an improvement changes on the floor, such as minutes saved, scrap avoided and other costs cut, into money per year, and sets that against what the change cost. Net annual savings are the yearly savings minus any running cost, and the payback period is the one-time cost ÷ net annual savings × 12 months.
Labour savingsequalsMinutes saved × Times per year divided by 60 × Labour cost per hour
Net annual savingsequalsLabour + Scrap avoided × Cost per unit + Other − Running cost
Payback (months)equalsOne-time cost divided by Net annual savings × 12
First-year ROIequalsNet annual savings − One-time cost divided by One-time cost
All people together, per unit, order or changeover
Units, orders or changeovers a year
Loaded: with benefits and taxes
Scrapped or reworked units no longer made
Material and work lost on each one
Material, energy, overtime, freight
Parts, fixtures and the team's hours
What it costs each year to keep going
Pre-filled with the worked example. Enter 0 for anything that does not apply. Use figures Finance would sign off.
Net savings per year
$16,000
$16,500 saved a year, less $500 running cost.
Payback
4.5 months
One-time cost ÷ net savings × 12
First-year ROI
166.7%
(Net savings − one-time cost) ÷ one-time cost
First-year net
$10,000
Net savings − one-time cost
Labour hours freed
300 h
Per year
Where the yearly savings come from
Next step
Want to track this every week?
Bring this result to a 45-minute demo and we will show where it fits in LeanSuite's Continuous Improvement Software.
How to calculate it
Measure before and after, then price it
Labour time saved comes from timing the task before and after the change. Multiply by how often the task happens in a year: units made, orders picked, changeovers run. Count everyone involved, so two people each saving a minute is two minutes.
Scrap avoided is the drop in scrapped or reworked units per year, priced at what each one cost in material and work. The COPQ calculator puts a total on poor quality if you need the bigger picture.
Other savings cover anything else that costs less each year, such as material, energy, overtime or freight. One-time cost is what it took to make the change, including the team's hours, and running cost is what it costs every year after.
Keep hard and soft savings apart when you report them. Hours freed are capacity, and only become cash when they cut overtime, avoid a hire or make output you can sell.
Worked example
Illustrative numbers, not a benchmarkA kaizen on a packing line takes 1.5 minutes of labour off each of 12,000 orders a year, at a loaded labour cost of $35 an hour. It also stops 400 parts a year being scrapped, at $12 each, and saves $1,200 a year in packing material. It cost $6,000 to make and costs $500 a year to keep going.
- 1Labour = 1.5 × 12,000 ÷ 60 = 300 h × $35 = $10,500 a year.
- 2Scrap = 400 × $12 = $4,800 a year. Other = $1,200.
- 3Net annual savings = $10,500 + $4,800 + $1,200 − $500 = $16,000.
- 4Payback = $6,000 ÷ $16,000 × 12 = 4.5 months.
- 5First-year ROI = ($16,000 − $6,000) ÷ $6,000 = 166.7%.
Embed this calculator
Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.
<iframe src="https://www.theleansuite.com/tools/kaizen-savings-calculator/embed" title="Kaizen savings calculator by LeanSuite" width="100%" height="1520" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/kaizen-savings-calculator">Kaizen savings calculator</a> by LeanSuite</p>How LeanSuite helps
LeanSuite's Continuous Improvement Software records hard and soft savings next to each project's costs, sets yearly targets per department and shows closed and projected savings against target on a glide path.
See Continuous Improvement SoftwareRead more
- Free template: Cost savings tracker
- Free template: Kaizen event preparation checklist
- Kaizen in the lean glossary
- Kaizen: The Complete Beginner’s Guide to Continuous Improvement
- Payback period in the lean glossary
- Hard and soft savings in the lean glossary
- Benefits of Kaizen: 6 Advantages in Manufacturing
- Ditch Spreadsheets: Track Your Kaizen Wins with Real-Time Metrics
FAQ
Kaizen savings calculator: common questions
Price each thing the change improves for a year and add them up. Labour: minutes saved each time × times per year ÷ 60 × the loaded hourly cost. Scrap: units no longer scrapped × cost per unit. Then add any other yearly savings and take off what it costs each year to keep the change going. Saving 1.5 minutes on 12,000 orders at $35 an hour is 300 hours, or $10,500 a year.
Payback in months = one-time cost ÷ net annual savings × 12. A change that cost $6,000 and saves $16,000 a year net pays back in 6,000 ÷ 16,000 × 12 = 4.5 months. If the running cost is as large as the savings, it never pays back.
This calculator uses first-year ROI = (net annual savings − one-time cost) ÷ one-time cost, so 0% means the change has just paid for itself in its first year. With $16,000 of net savings and a $6,000 cost it is (16,000 − 6,000) ÷ 6,000 = 166.7%. Some teams divide the full year's savings by the cost instead, which gives a higher figure, so say which one you report.
Hard savings show up in the accounts as money not spent: less material, less scrap, less overtime, a temp not hired. Soft savings are real gains that do not cut spending on their own, such as hours freed or a cost avoided. Labour time saved is a soft saving unless it removes overtime or extra staff, or the freed hours make output you can sell, so many finance teams list it separately.
Because small changes add up. A few minutes saved on a task done thousands of times a year is often worth more than one large project, and a running total of savings is what keeps support for continuous improvement when budgets get tight. Agree the rules with Finance first, such as how long a saving is counted and which savings count as hard, so the totals are trusted.
More free lean tools
All tools- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
- First pass yield (FPY) calculatorFirst pass yield at each step and rolled throughput yield (RTY) across the whole process.
- Cost of poor quality (COPQ) calculatorTotal COPQ and cost of quality, and each as a share of revenue, from the four quality cost categories.
- Process capability (Cp, Cpk) calculatorCp and Cpk against your specification limits, plus Pp and Ppk from pasted measurements, with a distribution chart.
- DPMO and sigma level calculatorDPMO, defects per unit, yield and sigma level from the defects found, units checked and opportunities per unit.
- MTBF and MTTR calculatorMean time between failures, mean time to repair and availability from operating time, failures and repair time.
- Lead time calculatorManufacturing lead time from WIP and throughput (Little's Law), and the share of it that adds value.
- Throughput time calculatorThroughput time from process, inspection, move and wait time, the share of it that adds value, and units per hour.
- TEEP calculatorTotal effective equipment performance: OEE multiplied by how much of all calendar time you plan to run.
- Overall labor effectiveness (OLE) calculatorHow well paid labor hours turn into good output: availability, performance and quality of the crew.
- Inventory turnover and days on hand calculatorHow many times stock turns over in a period and how many days of it you hold, from COGS and average inventory.
- Safety stock calculatorSafety stock and reorder point from the service level you want, average demand and lead time, and how much each varies.
- Scrap rate calculatorScrap rate, the cost of scrap per period and per year, and what reaching a target rate would save.
- TRIR and DART rate calculatorOSHA recordable and DART incident rates from your 300A case counts and hours, and what one more case does to them.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Maintenance strategy selectorAnswer the RCM questions for one failure mode and get the maintenance strategy, the reasoning and the check or test interval.
- Noise dose and TWA calculatorDose and 8-hour TWA for a shift of noise levels under OSHA and NIOSH, which limits are reached and how much loud time to cut.
- Repair or replace calculatorEquivalent annual cost of keeping and repairing an old machine against buying a new one, with each one's economic life and the break-even figures.
- Compressed air leak cost calculatorAir lost, kW and cost a year for each tagged leak from its size and the pressure, ranked so the biggest gets fixed first.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
- Acceptance sampling calculatorRead the OC curve and the real risks of a sampling plan, find the plan for your AQL and LTPD, or size a zero-defect test.
- Lean maturity self-assessmentScore 24 statements across eight dimensions and get a result band for each, an overall band and where to start.
- Manufacturing ROI calculatorAnswer a few questions about your shop floor, shifts and downtime to estimate your potential ROI with LeanSuite.