Skip to content
LeanSuite

Free tool

Overall labor effectiveness (OLE) calculator

Overall labor effectiveness (OLE) shows how well a crew's paid hours turn into good output. It is availability × performance × quality, applied to labor: hours not lost to idle time, output against the standard time per unit, and good units out of all units made. It is the people counterpart of OEE.

OLEequalsAvailability × Performance × Quality

AvailabilityequalsPaid hours − Idle hours divided by Paid hours

PerformanceequalsStandard minutes × Units made ÷ 60 divided by Hours worked

QualityequalsGood units divided by Units made

Hours worked is paid hours minus idle hours. OLE has no single standard definition: this page uses the OEE structure on labor hours, so state your own rule for idle time.

Scheduled hours, all people together

Waiting for material, no work, stoppages

Labor minutes the standard allows per unit

Good and bad

Right first time, no rework

Pre-filled with the worked example. Leave planned breaks out of the paid hours, or they will count as idle time.

Overall labor effectiveness

83.1%

6.65 of 8 paid hours went into good units at standard.

Availability

93.8%

Working hours ÷ paid hours

Performance

93.3%

Hours at standard ÷ working hours

Quality

95.0%

Good ÷ units made

Email me my results

Optional. Get these inputs and results in your inbox, with a link back to this calculator.

We may follow up about LeanSuite. See our Privacy Notice.

Next step

Want to track this every week?

Bring this result to a 45-minute demo and we will show where it fits in LeanSuite's KPI Dashboards.

How to calculate it

Five numbers from the shift report

Paid labor hours are the hours the crew was scheduled to work, all people added together. Take planned breaks out first, so the number reflects time the crew should have been producing.

Idle hours are the part of that time with no work to do: waiting for material, no orders, a stopped machine. Hours spent on work that was not standard, such as rework, stay in the worked hours and show up as lower performance.

Standard time is the labor minutes one unit should take, from your standard work or a time study. Units made and good units come from the count at the end of the shift.

Read the three factors, not just the product. Low availability is a flow problem the crew cannot fix alone, so it belongs on the daily management board; low performance is about method and training; low quality is about first pass yield.

Worked example

Illustrative numbers, not a benchmark

A crew on a shift with 8 paid hours, 0.5 hours of waiting for material, a standard of 3 labor minutes per unit, 140 units made and 133 of them good.

  1. Step 1

    Hours worked = 8 − 0.5 = 7.5 h. Availability = 7.5 ÷ 8 = 93.75%.
  2. Step 2

    Hours at standard = 3 min × 140 ÷ 60 = 7.0 h. Performance = 7.0 ÷ 7.5 = 93.33%.
  3. Step 3

    Quality = 133 ÷ 140 = 95%.
  4. Step 4

    OLE = 93.75% × 93.33% × 95% = 83.1%.
OLE 83.1%. Of 8 paid hours, 6.65 went into good units at standard (3 min × 133 ÷ 60). The three losses are close: performance is the lowest factor at 93.3%, then availability at 93.75% and quality at 95%.

Embed this calculator

Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.

<iframe src="https://www.theleansuite.com/tools/ole-calculator/embed" title="Overall labor effectiveness (OLE) calculator by LeanSuite" width="100%" height="1000" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/ole-calculator">Overall labor effectiveness (OLE) calculator</a> by LeanSuite</p>

FAQ

Overall labor effectiveness (OLE) calculator: common questions

  1. Multiply availability, performance and quality. Availability is the paid hours not lost to idle time divided by paid hours, performance is the hours the output should have taken at standard divided by the hours actually worked, and quality is good units divided by units made. With 8 paid hours, 0.5 idle, a 3-minute standard and 133 good units of 140, OLE is 93.75% × 93.33% × 95% = 83.1%.

  2. No. OLE applies the OEE structure to labor, and companies differ on what counts as idle time and where the standard comes from. This calculator counts idle hours as paid hours with no work available (waiting for material, no orders, stoppages) and takes planned breaks out of the paid hours. Write down your own rule and keep it the same, or period-to-period comparisons will mislead.

  3. OEE measures a machine's time: how long it ran, how fast and how many good parts. OLE measures the people's paid time with the same three questions. On a manual assembly line the two can differ a lot, because the crew can be busy while the machine waits, or the other way round.

  4. From a time study or the standard work sheet for the job, in labor minutes per unit for the whole crew. If the standard is out of date, performance will read above or below 100% for the wrong reason, so check it before you act on the number.

  5. There is no universal target. The useful comparison is the same crew on the same job over time, and the split into availability, performance and quality tells you where the lost hours are. A drop in availability points at waiting and shortages; a drop in performance points at the method or the standard.

More free lean tools

All tools

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.