Overall labor effectiveness (OLE) calculator
Overall labor effectiveness (OLE) shows how well a crew's paid hours turn into good output. It is availability × performance × quality, applied to labor: hours not lost to idle time, output against the standard time per unit, and good units out of all units made. It is the people counterpart of OEE.
OLEequalsAvailability × Performance × Quality
AvailabilityequalsPaid hours − Idle hours divided by Paid hours
PerformanceequalsStandard minutes × Units made ÷ 60 divided by Hours worked
QualityequalsGood units divided by Units made
Scheduled hours, all people together
Waiting for material, no work, stoppages
Labor minutes the standard allows per unit
Good and bad
Right first time, no rework
Pre-filled with the worked example. Leave planned breaks out of the paid hours, or they will count as idle time.
Overall labor effectiveness
83.1%
6.65 of 8 paid hours went into good units at standard.
Availability
93.8%
Working hours ÷ paid hours
Performance
93.3%
Hours at standard ÷ working hours
Quality
95.0%
Good ÷ units made
Next step
Want to track this every week?
Bring this result to a 45-minute demo and we will show where it fits in LeanSuite's KPI Dashboards.
How to calculate it
Five numbers from the shift report
Paid labor hours are the hours the crew was scheduled to work, all people added together. Take planned breaks out first, so the number reflects time the crew should have been producing.
Idle hours are the part of that time with no work to do: waiting for material, no orders, a stopped machine. Hours spent on work that was not standard, such as rework, stay in the worked hours and show up as lower performance.
Standard time is the labor minutes one unit should take, from your standard work or a time study. Units made and good units come from the count at the end of the shift.
Read the three factors, not just the product. Low availability is a flow problem the crew cannot fix alone, so it belongs on the daily management board; low performance is about method and training; low quality is about first pass yield.
Worked example
Illustrative numbers, not a benchmarkA crew on a shift with 8 paid hours, 0.5 hours of waiting for material, a standard of 3 labor minutes per unit, 140 units made and 133 of them good.
Step 1
Hours worked = 8 − 0.5 = 7.5 h. Availability = 7.5 ÷ 8 = 93.75%.Step 2
Hours at standard = 3 min × 140 ÷ 60 = 7.0 h. Performance = 7.0 ÷ 7.5 = 93.33%.Step 3
Quality = 133 ÷ 140 = 95%.Step 4
OLE = 93.75% × 93.33% × 95% = 83.1%.
Embed this calculator
Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.
<iframe src="https://www.theleansuite.com/tools/ole-calculator/embed" title="Overall labor effectiveness (OLE) calculator by LeanSuite" width="100%" height="1000" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/ole-calculator">Overall labor effectiveness (OLE) calculator</a> by LeanSuite</p>How LeanSuite helps
LeanSuite's KPI Dashboards track OEE, downtime and production counts live, so the lost time and the counts behind an effectiveness figure are on one screen.
See KPI DashboardsRead more
- Free template: Standard work sheet template
- Free template: Time study sheet
- Overall labor effectiveness (OLE) in the lean glossary
- OEE calculator
- OEE in the lean glossary
- Standard Work in Manufacturing Explained
- How to Improve Shop Floor Productivity
- How to calculate OEE for machines, where OLE covers people
FAQ
Overall labor effectiveness (OLE) calculator: common questions
Multiply availability, performance and quality. Availability is the paid hours not lost to idle time divided by paid hours, performance is the hours the output should have taken at standard divided by the hours actually worked, and quality is good units divided by units made. With 8 paid hours, 0.5 idle, a 3-minute standard and 133 good units of 140, OLE is 93.75% × 93.33% × 95% = 83.1%.
No. OLE applies the OEE structure to labor, and companies differ on what counts as idle time and where the standard comes from. This calculator counts idle hours as paid hours with no work available (waiting for material, no orders, stoppages) and takes planned breaks out of the paid hours. Write down your own rule and keep it the same, or period-to-period comparisons will mislead.
OEE measures a machine's time: how long it ran, how fast and how many good parts. OLE measures the people's paid time with the same three questions. On a manual assembly line the two can differ a lot, because the crew can be busy while the machine waits, or the other way round.
From a time study or the standard work sheet for the job, in labor minutes per unit for the whole crew. If the standard is out of date, performance will read above or below 100% for the wrong reason, so check it before you act on the number.
There is no universal target. The useful comparison is the same crew on the same job over time, and the split into availability, performance and quality tells you where the lost hours are. A drop in availability points at waiting and shortages; a drop in performance points at the method or the standard.
More free lean tools
All tools- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
- First pass yield (FPY) calculatorFirst pass yield at each step and rolled throughput yield (RTY) across the whole process.
- Cost of poor quality (COPQ) calculatorTotal COPQ and cost of quality, and each as a share of revenue, from the four quality cost categories.
- Process capability (Cp, Cpk) calculatorCp and Cpk against your specification limits, plus Pp and Ppk from pasted measurements, with a distribution chart.
- DPMO and sigma level calculatorDPMO, defects per unit, yield and sigma level from the defects found, units checked and opportunities per unit.
- MTBF and MTTR calculatorMean time between failures, mean time to repair and availability from operating time, failures and repair time.
- Lead time calculatorManufacturing lead time from WIP and throughput (Little's Law), and the share of it that adds value.
- Throughput time calculatorThroughput time from process, inspection, move and wait time, the share of it that adds value, and units per hour.
- Kaizen savings calculatorYearly savings, payback in months and first-year ROI of an improvement, from time saved, scrap avoided and its costs.
- TEEP calculatorTotal effective equipment performance: OEE multiplied by how much of all calendar time you plan to run.
- Inventory turnover and days on hand calculatorHow many times stock turns over in a period and how many days of it you hold, from COGS and average inventory.
- Safety stock calculatorSafety stock and reorder point from the service level you want, average demand and lead time, and how much each varies.
- Scrap rate calculatorScrap rate, the cost of scrap per period and per year, and what reaching a target rate would save.
- TRIR and DART rate calculatorOSHA recordable and DART incident rates from your 300A case counts and hours, and what one more case does to them.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Maintenance strategy selectorAnswer the RCM questions for one failure mode and get the maintenance strategy, the reasoning and the check or test interval.
- Noise dose and TWA calculatorDose and 8-hour TWA for a shift of noise levels under OSHA and NIOSH, which limits are reached and how much loud time to cut.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
- Repair or replace calculatorEquivalent annual cost of keeping and repairing an old machine against buying a new one, with each one's economic life and the break-even figures.
- Compressed air leak cost calculatorAir lost, kW and cost a year for each tagged leak from its size and the pressure, ranked so the biggest gets fixed first.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
- Total manufacturing cost calculatorTotal manufacturing cost, cost of goods manufactured, cost per unit and the overhead rate from materials, labor and overhead.
- Acceptance sampling calculatorRead the OC curve and the real risks of a sampling plan, find the plan for your AQL and LTPD, or size a zero-defect test.
- Shift schedule plannerTen shift patterns on real dates: calendar for each crew, hours a week, weekends off, coverage and the weeks over 40 hours.
- Pareto chart makerPaste categories and counts: sorted bars, cumulative percentage line and the vital few at the 80% line, as a PNG or SVG.
- Histogram makerPaste measurements: the histogram with automatic or chosen bins, plus mean, median and standard deviation, as a PNG or SVG.
- Box plot makerPaste one or more groups of numbers: box plots with quartiles, IQR, whiskers and outliers by the 1.5 IQR rule, as a PNG or SVG.
- Fishbone diagram makerName the problem, list causes under the 6M bones, and download the Ishikawa diagram as a PNG or SVG.
- 5 Whys canvasWrite the problem, answer up to five whys, state the root cause and countermeasure, then print the one-page canvas.
- Lean maturity self-assessmentScore 27 statements across nine dimensions and get a band for each, an overall band, where to start and the guides to read.
- Lean method navigatorSix questions about one problem, then the lean method to start with, the two that follow, why each fits, five steps for Monday and what it will not solve.
- Manufacturing ROI calculatorAnswer a few questions about your shop floor, shifts and downtime to estimate your potential ROI with LeanSuite.