Free tool
Box plot maker
A box plot shows a group of measurements as five numbers: the smallest, the first quartile, the median, the third quartile and the largest, with points far from the box marked as outliers. Paste one or more groups below to draw it.
IQRequalsQ3 − Q1
FencesequalsQ1 − 1.5 × IQR and Q3 + 1.5 × IQR
Outlierequalsany value outside the fences
3 groups, 34 values read. Start each line with a name and a colon, then the numbers. Use a point for decimals.
What the numbers are, with units
Pre-filled with the worked example. Your data stays in your browser.
Outliers
1
Points beyond 1.5 × IQR from the box, across 3 groups.
Groups
3
Values
34
Quartiles use the inclusive method, the same as Excel's QUARTILE.INC.
| Group | n | Min | Q1 | Median | Q3 | Max | IQR | Mean | Outliers |
|---|---|---|---|---|---|---|---|---|---|
| Shift A | 11 | 41 | 44 | 46 | 47.5 | 51 | 3.5 | 45.8182 | none |
| Shift B | 12 | 40 | 44.5 | 46.5 | 48.5 | 63 | 4 | 47.3333 | 63 |
| Shift C | 11 | 38 | 40.5 | 42 | 43.5 | 45 | 3 | 41.8182 | none |
Next step
Want to keep problem solving in one place?
Bring this result to a 45-minute demo and we will show where it fits in LeanSuite's Quality Improvement.
How to use it
Compare groups on one scale
Type one group per line. Start with a name and a colon, then the readings, for example Line 1: 12 14 15 13. Separate values with spaces, commas or semicolons. Use up to 12 groups.
Read the box. The line inside is the median. Half of the readings sit inside the box, so a tall box means a wide spread. A median off-centre in its box means the data are skewed. The red diamond is the mean; when it sits far from the median, a few large values are pulling it.
Check the outliers. Go and look at each marked reading: a mistyped value, a different lot or a real event. For the shape of one group, draw it with the histogram maker, and for whether a stable process fits its limits use Cp and Cpk.
Worked example
Illustrative numbers, not a benchmarkCycle times in seconds for the same operation on three shifts, 11 or 12 readings each.
- 1Shift A: Q1 = 44, median = 46, Q3 = 47.5, so IQR = 3.5 and there are no outliers.
- 2Shift B: Q1 = 44.5, median = 46.5, Q3 = 48.5, so IQR = 4 and the upper fence is 48.5 + 6 = 54.5.
- 3Shift B has a reading of 63, above the fence, so it is plotted as an outlier. The upper whisker stops at 52.
- 4Shift C: Q1 = 40.5, median = 42, Q3 = 43.5, IQR = 3, no outliers.
Embed this tool
Teaching this, or writing about it? Paste this code into your site, course page or intranet and the tool works right there. It is free, with no sign-up.
<iframe src="https://www.theleansuite.com/tools/box-plot-maker/embed" title="Box plot maker by LeanSuite" width="100%" height="2400" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/box-plot-maker">Box plot maker</a> by LeanSuite</p>How LeanSuite helps
LeanSuite's AI Root Cause Analysis helps teams work from a difference like this one to its cause, and its corrective action tracking follows the fix through to closure.
See Quality ImprovementRead more
- Free template: Histogram template
- Free template: X-bar and R control chart template
- Statistical process control in the lean glossary
- Seven basic quality tools in the lean glossary
- Lean Six Sigma Tools: 13 Common Tools and When to Use Them
- Problem-solving methods: which one to use and when
- Histogram guide: a different view of the same spread
- Control chart guide: spread over time
- Histogram maker: the shape of one sample
FAQ
Box plot maker: common questions
A box plot, also called a box and whisker plot, summarises a group of measurements with five numbers: the smallest, the first quartile, the median, the third quartile and the largest. The box runs from the first to the third quartile with a line at the median. Whiskers reach the furthest points inside the fences, and points beyond them are drawn individually as outliers.
Find the interquartile range, IQR = Q3 − Q1. Any value below Q1 − 1.5 × IQR or above Q3 + 1.5 × IQR is plotted as an outlier. The whiskers stop at the most extreme values still inside those fences. This is Tukey's rule, the usual default. An outlier is a prompt to look at that reading, not permission to delete it.
This tool sorts the values and interpolates between neighbouring ones, which is the method behind Excel's QUARTILE.INC and PERCENTILE.INC. Other software uses slightly different rules, so a small data set can give a slightly different Q1 and Q3 elsewhere. With 30 or more values the difference is negligible.
When you are comparing groups, such as shifts, machines, suppliers or lots. Several boxes side by side on one scale show differences in centre and spread at a glance, where several histograms would be hard to compare. A histogram is better for the shape of one group, and it can show two peaks that a box plot hides.
Five is the least that makes the quartiles meaningful, and 10 or more per group is better. The tool draws a group with fewer than five but tells you the quartiles are rough. If you have a group of only two or three readings, show the points themselves.
More free lean tools
All tools- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
- First pass yield (FPY) calculatorFirst pass yield at each step and rolled throughput yield (RTY) across the whole process.
- Cost of poor quality (COPQ) calculatorTotal COPQ and cost of quality, and each as a share of revenue, from the four quality cost categories.
- Process capability (Cp, Cpk) calculatorCp and Cpk against your specification limits, plus Pp and Ppk from pasted measurements, with a distribution chart.
- DPMO and sigma level calculatorDPMO, defects per unit, yield and sigma level from the defects found, units checked and opportunities per unit.
- MTBF and MTTR calculatorMean time between failures, mean time to repair and availability from operating time, failures and repair time.
- Lead time calculatorManufacturing lead time from WIP and throughput (Little's Law), and the share of it that adds value.
- Throughput time calculatorThroughput time from process, inspection, move and wait time, the share of it that adds value, and units per hour.
- Kaizen savings calculatorYearly savings, payback in months and first-year ROI of an improvement, from time saved, scrap avoided and its costs.
- TEEP calculatorTotal effective equipment performance: OEE multiplied by how much of all calendar time you plan to run.
- Overall labor effectiveness (OLE) calculatorHow well paid labor hours turn into good output: availability, performance and quality of the crew.
- Inventory turnover and days on hand calculatorHow many times stock turns over in a period and how many days of it you hold, from COGS and average inventory.
- Safety stock calculatorSafety stock and reorder point from the service level you want, average demand and lead time, and how much each varies.
- Scrap rate calculatorScrap rate, the cost of scrap per period and per year, and what reaching a target rate would save.
- TRIR and DART rate calculatorOSHA recordable and DART incident rates from your 300A case counts and hours, and what one more case does to them.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Maintenance strategy selectorAnswer the RCM questions for one failure mode and get the maintenance strategy, the reasoning and the check or test interval.
- Noise dose and TWA calculatorDose and 8-hour TWA for a shift of noise levels under OSHA and NIOSH, which limits are reached and how much loud time to cut.
- Repair or replace calculatorEquivalent annual cost of keeping and repairing an old machine against buying a new one, with each one's economic life and the break-even figures.
- Compressed air leak cost calculatorAir lost, kW and cost a year for each tagged leak from its size and the pressure, ranked so the biggest gets fixed first.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
- Acceptance sampling calculatorRead the OC curve and the real risks of a sampling plan, find the plan for your AQL and LTPD, or size a zero-defect test.
- Shift schedule plannerTen shift patterns on real dates: calendar for each crew, hours a week, weekends off, coverage and the weeks over 40 hours.
- Pareto chart makerPaste categories and counts: sorted bars, cumulative percentage line and the vital few at the 80% line, as a PNG or SVG.
- Histogram makerPaste measurements: the histogram with automatic or chosen bins, plus mean, median and standard deviation, as a PNG or SVG.
- Fishbone diagram makerName the problem, list causes under the 6M bones, and download the Ishikawa diagram as a PNG or SVG.
- 5 Whys canvasWrite the problem, answer up to five whys, state the root cause and countermeasure, then print the one-page canvas.
- Lean maturity self-assessmentScore 24 statements across eight dimensions and get a result band for each, an overall band and where to start.
- Lean method navigatorSix questions about one problem, then the lean method to start with, the two that follow, why each fits, five steps for Monday and what it will not solve.
- Manufacturing ROI calculatorAnswer a few questions about your shop floor, shifts and downtime to estimate your potential ROI with LeanSuite.

