Quality poster
Updated · Free to print and share
Hold area (quarantine) rules poster
A hold (quarantine) area keeps nonconforming and suspect parts apart until someone with the authority decides what happens to them. It works when every item is tagged, nothing leaves without a written decision, and the area is reviewed often enough that tags do not age. This poster gives four rules for the area and the six possible decisions, using ISO 9000's terms: use as is under a concession, rework, repair, regrade, return to the supplier or scrap.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Four rules for the quarantine area and six cards for the decisions on a nonconforming part, from use as is to scrap.The words on the poster
Hold area rules
Suspect parts stay here until someone authorized decides.
Rules
- Tag every item What, why, how many, who, date.
- Nothing leaves without a written decision.
- Count in, count out Quantities match the tag.
- Decide fast Review daily. Escalate old tags.
Decisions
- Use as is Only under a concession.
- Rework Make it conform. Check again.
- Repair Usable, not conforming. Needs a concession.
- Regrade To a grade it does meet.
- Return Back to the supplier.
- Scrap Destroy so it can't be used.
- Can release parts: ____
- Hold area checked at: ____
Decision terms as in ISO 9000:2015. Control of nonconforming outputs: ISO 9001:2015, clause 8.7.
On the floor
How to use it
Putting the Hold area (quarantine) rules poster to work
- 1
Post it at the entrance to the hold area or on its fence.
- 2
Write the names of the people who can release parts on the fill-in lines.
- 3
Walk the hold area at a set time each day and escalate old tags.
- 4
Pair it with the free NCR form and quality alert form.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- ISO 9000:2015, section 3.12: concession, regrade, rework, repair, release and scrap.
- ISO 9001:2015, clause 8.7: control of nonconforming outputs.
Templates, decks and guides to go with it
- Non-conformance report (NCR) formA two-page NCR from the requirement against what was found to disposition and closure, and an Excel NCR log.
- Quality alert formA quality alert to post at the line, a sign-off sheet for every shift, and a log of open, expired and closed alerts.
- CAPA log templateAn Excel CAPA tracker with status, days open, late flags and counts by source, plus a printable log and monthly review.
- Topic: Quality managementEvery guide we have on the subject, sorted.
More quality posters
All posters
PDCA cycle poster
5 whys poster
8D problem solving poster
Jidoka and quality at the source poster
Poka-yoke types poster
7 basic quality tools poster
Defect escalation poster (red tag and stop the line)
First piece (first article) check poster
5W1H problem description poster
Is / Is Not analysis poster
Fishbone 6M questions poster
Human error root causes poster
Why made, why missed poster
4M change points poster
Correction vs corrective action poster
Strong and weak countermeasures poster
Containment actions poster
Quality terms poster (nonconformity, defect, concession)
Check sheet poster
How to read a Pareto chart poster
Histogram shapes poster
Control chart rules poster (when to react)
Measurement system basics poster
Cp and Cpk process capability poster
First pass yield and rolled throughput yield poster
QA matrix poster
PFMEA severity, occurrence and detection poster
How to read a control plan poster
Layered process audit poster
Internal audit steps poster
Audit score 0 to 5 poster
Reactive, preventive, proactive poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
