Quality poster
Updated · Free to print and share
Measurement system basics poster
Every accept or reject decision is only as good as the measurement behind it. A measurement system (the gauge, the method, the person and the setting) can read off target, give different answers on the same part, differ between people, drift over time or be too coarse for the tolerance. This poster names those problems, lists six checks to make before you measure, and gives the AIAG guideline for judging a gauge R&R study.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Four cards on bias, repeatability, reproducibility and stability, six checks before measuring, and the gauge R&R guideline.The words on the poster
Can you trust the measurement?
Check the gauge and the method before you judge the part.
- Bias Reads off target on average. Fix: calibrate.
- Repeatability One person, one part, different readings: the gauge.
- Reproducibility Different people, different results: the method.
- Stability Readings drift over time. Check against a master.
Before you measure
- Calibration label in date
- Right gauge for the feature
- Clean, zeroed, undamaged
- Steps no bigger than a tenth of the tolerance
- Same method, same point on the part
- In doubt? Ask, don't guess.
- Gauge R&R: under 10% of the tolerance or variation is acceptable, 10 to 30% may be, over 30% is not.
Terms and guidelines from the AIAG Measurement Systems Analysis manual, 4th edition (2010).
On the floor
How to use it
Putting the Measurement system basics poster to work
- 1
Post it at the gauge crib, the inspection bench and the lab.
- 2
Use the six checks as the routine before every first-piece and in-process check.
- 3
When a measurement is in doubt, ask which of the four problems it could be.
- 4
Pair it with the free MSA workbook, gauge R&R sheet and calibration log.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- AIAG, Measurement Systems Analysis Reference Manual, 4th edition (2010): bias, repeatability, reproducibility, stability, the one-tenth resolution guideline and the %GRR acceptance guideline (under 10%, 10 to 30%, over 30%).
Templates, decks and guides to go with it
- MSA study workbookBias, linearity and stability study sheets for a gauge, with the arithmetic done and a guide to which study when.
- Gage R&R study sheet10 parts, 2 or 3 appraisers, 2 or 3 trials: EV, AV, GRR, PV, %GRR and ndc by the average and range method.
- Gauge calibration logA gauge register with next due dates and status, a calibration record with as-found and as-left readings, and the steps when a gauge fails.
- Topic: Quality managementEvery guide we have on the subject, sorted.
Terms on this poster
More quality posters
All posters
PDCA cycle poster
5 whys poster
8D problem solving poster
Jidoka and quality at the source poster
Poka-yoke types poster
7 basic quality tools poster
Defect escalation poster (red tag and stop the line)
First piece (first article) check poster
5W1H problem description poster
Is / Is Not analysis poster
Fishbone 6M questions poster
Human error root causes poster
Why made, why missed poster
4M change points poster
Correction vs corrective action poster
Strong and weak countermeasures poster
Containment actions poster
Hold area (quarantine) rules poster
Quality terms poster (nonconformity, defect, concession)
Check sheet poster
How to read a Pareto chart poster
Histogram shapes poster
Control chart rules poster (when to react)
Cp and Cpk process capability poster
First pass yield and rolled throughput yield poster
QA matrix poster
PFMEA severity, occurrence and detection poster
How to read a control plan poster
Layered process audit poster
Internal audit steps poster
Audit score 0 to 5 poster
Reactive, preventive, proactive poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
