Quality poster
Updated · Free to print and share
First piece (first article) check poster
A first piece check (often called a first article check on the floor) confirms that the first part made after a start-up or change is right before the rest of the batch is run. This poster lists when to do it, the five steps of the check and what to do if the part fails. It is not the same as a formal first article inspection (FAI) for a new part number, which is a full documented inspection.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.

The words on the poster
First piece check
Check the first part before you run the batch.
When
- Start of a shift or a new order
- After a changeover
- After a tool change or repair
- New batch of material
- After a long stop
- After any process change
- Make the first part With the normal settings and material.
- Check it Against the drawing or spec, with calibrated gauges.
- Record it Every result on the check sheet.
- Get it signed off By the person authorized to release it.
- Run Keep the first part as the reference if your plant does.
- Failed? Don't run. Adjust, make a new first part and check again. Tell your team leader.
On the floor
How to use it
- 1
Post it at every machine or line that has a changeover.
- 2
Make the WHEN list match your own control plan before you print.
- 3
Keep the check sheet and the right gauges next to the poster.
- 4
Pair it with the free changeover checklist and the first article inspection report.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Templates, decks and guides to go with it
- First article inspection (FAI) report templatePart information, a ballooned characteristic table with tolerances and results, material and process certificates, and sign-off.
- Changeover checklist25 checks for every changeover, a record of planned and actual times, and a log of changeover time against target.
- Control plan templateWhat is checked at each step, against which limits, how, how often, and what to do when a result is out.
- Gauge calibration logA gauge register with next due dates and status, a calibration record with as-found and as-left readings, and the steps when a gauge fails.
- Topic: Quality managementEvery guide we have on the subject, sorted.
Terms on this poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Schedule Demo







