Quality poster
Updated · Free to print and share
Quality terms poster (nonconformity, defect, concession)
Quality teams use everyday words with exact meanings. A nonconformity is any requirement not met; a defect is a nonconformity that affects the intended use, so every defect is a nonconformity but not every nonconformity is a defect. A concession comes after a product is made, a deviation permit before. This poster puts eight of these terms in plain words, paraphrased from ISO 9000, so reports, NCRs and conversations with customers use them the same way.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Eight cards defining requirement, nonconformity, defect, concession, deviation permit, release, verification and validation.The words on the poster
Quality words, used right
Same word, same meaning, in every report.
- Requirement A need that is stated, usually implied, or a must.
- Nonconformity A requirement not met.
- Defect A nonconformity that affects the intended use.
- Concession Permission to use or ship a product already made that does not conform.
- Deviation permit Permission to depart from a requirement before the product is made.
- Release Permission to go on to the next stage.
- Verification Evidence that the specified requirements are met.
- Validation Evidence it works for its specific intended use.
- Every defect is a nonconformity. Not every nonconformity is a defect.
Paraphrased from ISO 9000:2015, section 3.
On the floor
How to use it
Putting the Quality terms poster (nonconformity, defect, concession) poster to work
- 1
Hang it in the quality office and the meeting room where NCRs are reviewed.
- 2
Use it in induction for new inspectors, quality techs and team leaders.
- 3
Check NCRs and customer replies use "defect" only when the use is affected.
- 4
Pair it with the free NCR form and internal audit checklist.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
ISO 9000 asks for care with the word "defect" because of its legal meaning in product liability. Many plants use "nonconformity" in records for that reason.
- ISO 9000:2015 Quality management systems: Fundamentals and vocabulary, section 3. The poster paraphrases the definitions.
Templates, decks and guides to go with it
- Non-conformance report (NCR) formA two-page NCR from the requirement against what was found to disposition and closure, and an Excel NCR log.
- ISO 9001 internal audit checklist (production area)46 audit questions for the production floor in 11 processes, each with its ISO 9001:2015 clause, what evidence to look for and the sample to take, plus five defined grades, a findings log, a finding report and a summary by clause.
- Corrective action request (CAPA) formOne problem from containment to proof the fix worked, with occurrence and escape causes and a closure check that tells you when it can close.
- Topic: Quality managementEvery guide we have on the subject, sorted.
More quality posters
All posters
PDCA cycle poster
5 whys poster
8D problem solving poster
Jidoka and quality at the source poster
Poka-yoke types poster
7 basic quality tools poster
Defect escalation poster (red tag and stop the line)
First piece (first article) check poster
5W1H problem description poster
Is / Is Not analysis poster
Fishbone 6M questions poster
Human error root causes poster
Why made, why missed poster
4M change points poster
Correction vs corrective action poster
Strong and weak countermeasures poster
Containment actions poster
Hold area (quarantine) rules poster
Check sheet poster
How to read a Pareto chart poster
Histogram shapes poster
Control chart rules poster (when to react)
Measurement system basics poster
Cp and Cpk process capability poster
First pass yield and rolled throughput yield poster
QA matrix poster
PFMEA severity, occurrence and detection poster
How to read a control plan poster
Layered process audit poster
Internal audit steps poster
Audit score 0 to 5 poster
Reactive, preventive, proactive poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
