Emergency action plan: what it is, the six OSHA elements, and how to write one
Short answer
An emergency action plan (EAP) is the written plan that tells everyone on a site what to do in an emergency: how it is reported, how people leave, who stays behind to make critical equipment safe, how everyone is counted and who to ask. In the United States, OSHA 29 CFR 1910.38 requires one whenever another standard in part 1910 calls for it, and it sets six minimum elements that the plan must contain.
An emergency action plan covers six things under 29 CFR 1910.38(c): reporting a fire or other emergency, evacuation and exit route assignments, procedures for employees who stay to shut down critical operations, accounting for everyone after evacuation, rescue and medical duties, and the names or job titles people can ask about the plan. It must be in writing, kept in the workplace and available to employees, except that an employer with 10 or fewer employees may give it orally, 1910.38(b). It also needs an employee alarm system with a distinctive signal, 1910.38(d), trained people to help others out, 1910.38(e), and a review with each employee when they start, when their duties change and when the plan changes, 1910.38(f). A plan is only as good as the last drill that tested it. Check your local rules: fire codes and other countries' laws add to this.
Last reviewed:
What is an emergency action plan?
An emergency action plan is a short working document, not a binder. It answers the questions a person asks in the first minute of an alarm: what do I do, where do I go, who is in charge and how will anyone know I got out. It covers a fire, and on most plants also a chemical release, severe weather, a medical emergency and a power failure, each with its own signal and its own steps.
29 CFR 1910.38(a) says an employer must have a plan whenever an OSHA standard in part 1910 requires one. The rest of the section then says what the plan must contain. Section 1910.38(b) requires the plan to be in writing, kept in the workplace and available to employees for review. An employer with 10 or fewer employees may communicate it orally.
| Document | What it answers | Standard |
|---|---|---|
| Emergency action plan | What people do once an emergency has started: report, leave, be counted, help | 29 CFR 1910.38 |
| Fire prevention plan | How fires are stopped before they start: hazards, ignition sources, waste, who maintains heat-producing equipment | 29 CFR 1910.39 |
| Drill record | Proof the plan was tested: date, time taken, people counted, problems found | Your own record, plus any local fire code |
The two plans work as a pair. 29 CFR 1910.157(b)(1) mentions a written fire safety policy that requires immediate and total evacuation together with an emergency action plan and a fire prevention plan meeting 1910.38 and 1910.39.
The six minimum elements of an emergency action plan
29 CFR 1910.38(c) lists what the plan must include at a minimum. The table sets each element beside what a plant plan usually writes for it. The right-hand column is practice, not the wording of the standard.
| Element | Paragraph | What a plant plan writes |
|---|---|---|
| Reporting a fire or other emergency | 1910.38(c)(1) | The alarm points, the emergency number, and who calls it. One sentence per scenario |
| Evacuation: type and exit route assignments | 1910.38(c)(2) | Full or partial evacuation, which exit each area uses, the backup exit, the assembly point for each exit |
| Employees who stay for critical plant operations | 1910.38(c)(3) | Named roles, the shutdown steps that take seconds, and the point at which they must leave |
| Accounting for all employees after evacuation | 1910.38(c)(4) | Who counts, against what list, and how visitors and contractors are included |
| Rescue and medical duties | 1910.38(c)(5) | Named first aiders and responders, what they do and what they do not do |
| Who to ask about the plan | 1910.38(c)(6) | The name or job title of every employee people can contact, with their duties under the plan |
The standard does not set a number of wardens, a drill frequency or a time limit. It sets the content of the plan. Local fire codes may set drills and occupancy rules, so check them.
Alarms and exit routes: what the plan depends on
A plan on paper does nothing if people cannot hear the alarm or reach the door. Two neighbouring rules carry most of the weight. 29 CFR 1910.38(d) requires an employee alarm system that uses a distinctive signal for each purpose and meets 29 CFR 1910.165. That section requires the alarm to be perceived above ambient noise or light by all employees, 1910.165(b)(2), and to be distinctive and recognizable as a signal to evacuate, 1910.165(b)(3).
The employer must explain the preferred way to report emergencies and post emergency telephone numbers where phones are the reporting method, 1910.165(b)(4). A non-supervised alarm system must be tested for reliability and adequacy every two months, 1910.165(d)(2), and manual pull boxes must be unobstructed, conspicuous and readily accessible, 1910.165(e).
On exits, 29 CFR 1910.37(a)(3) says exit routes must be free and unobstructed, with no materials or equipment placed in them, permanently or temporarily. Each exit must be clearly visible and marked by a sign reading Exit, 1910.37(b)(2), and a doorway that could be mistaken for an exit must be marked Not an Exit or similar, 1910.37(b)(5). At least two exit routes must be available in a workplace, with exceptions in 1910.36(b)(3). A walk of every exit with the plan in your hand is the quickest way to find where the plan and the building disagree.
How to write an emergency action plan, step by step
Write the plan with the people who carry it out: a supervisor from each shift, a maintenance lead, a first aider and the person who orders contractor access. A plan written in an office tends to name exits nobody uses.
- 1
Draw the site and mark the exits
Take the floor plan, mark every exit, the alarm points, the extinguishers, the shut-offs and the assembly points. Walk it. Fix what the walk shows, such as a pallet in front of a door.
- 2
List the scenarios
Fire first, then the others your site can have: chemical release, severe weather, medical emergency, power loss, a gas leak. Each gets its own signal and its own two or three steps.
- 3
Set the alarm and the reporting route
Write what each signal means, who can raise it and the number to call. Post the numbers where phones are used, as 1910.165(b)(4) asks.
- 4
Assign exits and assembly points
Give each area a primary exit, a backup exit and an assembly point away from the building, and check that no route passes toward a high hazard area, 1910.37(a)(2).
- 5
Name the people, and a backup for each
A coordinator, area wardens, first aiders, a shutdown lead for critical operations and a head count lead. Use job titles as well as names, since 1910.38(c)(6) asks for the name or job title.
- 6
Decide who stays and what they do
Keep the list short. A critical operation is something that becomes more dangerous if left running, such as closing a gas valve. Write the steps so they take seconds, and the point at which that person must go.
- 7
Plan the head count
Count against a live list: the shift roster, plus the visitor and contractor sign-in. Decide who reports the count and to whom.
- 8
Train and issue the plan
Designate and train people to assist in an orderly evacuation, 1910.38(e). Review the plan with each employee when they start, when their duties change and when the plan changes, 1910.38(f).
- 9
Drill, time it, fix what you find
Run a drill on each shift. Record the time from alarm to the last area counted, the people counted against expected and every problem, with an owner and a date.
Worked example: a 140 person plant and one drill
Illustrative. A plant has two shifts and three areas. The numbers are made up to show the working. The plant has chosen one warden for every 20 people or part of 20 in an area. That is the plant's own rule, not an OSHA number.
| Area | Shift 1 people | Shift 1 wardens | Shift 2 people | Shift 2 wardens |
|---|---|---|---|---|
| Press shop | 38 | 2 | 20 | 1 |
| Assembly | 34 | 2 | 14 | 1 |
| Warehouse | 24 | 2 | 10 | 1 |
| Total | 96 | 6 | 44 | 3 |
Check: 38 + 34 + 24 = 96 and 20 + 14 + 10 = 44, and 96 + 44 = 140. Wardens: 2 + 2 + 2 = 6 on shift 1 and 1 + 1 + 1 = 3 on shift 2. The coverage grid showed the warehouse on shift 2 had no named warden, although the plan looked complete.
Drill on shift 1. The roster expects 96 people. Add 3 visitors and 2 contractors signed in at the gate, and the expected count is 96 + 3 + 2 = 101. The alarm sounds at 14:02:10 and the last area reports at 14:09:40, so the drill took 7 minutes 30 seconds, which is 450 seconds. The assembly points counted 99, so 101 - 99 = 2 people were unaccounted for.
Both missing people were at the loading dock, outside any assembly point's line of sight, and had left by the dock door. The fix was a named warden for the dock on both shifts and a line on the plan for the dock door's assembly point. The second drill counted 101 of 101. The drill, not a reread of the plan, found the problem.
Training, drills and review
29 CFR 1910.38(e) requires the employer to designate and train employees to assist in a safe and orderly evacuation of others. 1910.38(f) requires the plan to be reviewed with each employee covered by it in three cases: when the plan is developed or the employee is first assigned to a job, when the employee's responsibilities under the plan change, and when the plan changes.
Fire extinguishers add a second layer. Where employees are designated to use fire fighting equipment as part of the plan, 29 CFR 1910.157(g)(3) and (g)(4) require training in the equipment on first assignment and at least annually. Where extinguishers are provided for employee use, 1910.157(g)(1) and (g)(2) require an education program on initial employment and at least annually. If the plan says everyone evacuates and only named people may use extinguishers, 1910.157(b)(2) exempts the employer from the distribution requirements in paragraph (d).
The text of 1910.38 sets no drill frequency. Many plants drill each shift once or twice a year anyway, because a plan nobody has practised fails at the first surprise. Check your local fire code for any required frequency, and write the plant's own schedule into the plan.
Common mistakes in emergency action plans
- One plan for the day shift. Nights and weekends have fewer people, different wardens and sometimes a different exit open. Draw the coverage by area and shift.
- Names with no backup. People take leave. Every role needs a named deputy.
- A count against the wrong list. Visitors and contractors are on site but not on the roster.
- An assembly point that is on the route of the fire truck, or one that is out of sight of the dock or the yard.
- Everyone told to stay and fight the fire. Decide who may use an extinguisher and train them, and tell everyone else to leave.
- Never drilled, or drilled once and never timed. Time it and count it.
- Kept in a locked office. 1910.38(b) says the plan is available to employees for review.
Safety Improvement
Report and control hazards in LeanSuite
Workplace safety in manufacturing, run from one platform: report hazards in seconds, fix them with tracked actions, train people and see safety KPIs on your tier boards.
Go deeper
This page is the short version. These guides cover each part in full.
- 7 Preventable Shop Floor Incidents Most Plants MissThe incident types that most often turn into an emergency on a plant floor, and the gaps behind them.
- OSHA Audit Preparation: Reducing 40 Hours to 4 HoursThe written programs and training records an OSHA inspection asks for, including the emergency plan.
- Top Five Common Manufacturing HazardsThe main hazards on a plant floor that a plan has to cover, from fire to machine hazards.
- Near Miss Reporting That Actually Prevents Future IncidentsHow to get near misses reported and closed, including the blocked exit and the alarm nobody heard.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Emergency response posterSix steps in an emergency and the PASS extinguisher method, with blanks for the emergency number and assembly point.
- Emergency action plan templateA written emergency plan for a plant: site facts, roles and backups, warden coverage, scenario steps and a drill record.
- Fire extinguisher inspection checklist and logThe 8 monthly checks for each portable extinguisher, plus a log with the hydro test interval from OSHA Table L-1, annual and 6-year due dates and open issues.
- Safety audit checklistThirty-four plant-wide safety checks answered Yes, No or N/A, scored by area, with a risk rating and an action for every No.
- Training sign-off sheetAn attendance and sign-off record where each person signs they understood, with a competence check and an Excel log.
- Toolbox talk templateA record of a short safety talk: topic, key points, questions raised, actions and an attendee sign-in sheet.
Doing this in LeanSuite
Workplace safety
Report hazards and near misses in seconds, route each to an owner with a due date, and run safety inspections from ready-made templates.
See Workplace safetySafety tags
Anyone on the floor reports a hazard, near miss or unsafe condition in seconds, it is routed to an owner and tracked until it is fixed.
See Safety tagsAudit management
Run recurring audits and inspections from templates, and every failed item becomes a tracked action with an owner.
See Audit management
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about emergency action plan
An emergency action plan is the written plan that tells everyone on a site what to do in an emergency: how to report it, how to leave, who stays to make critical equipment safe, how everyone is counted and who to ask. In the United States OSHA 29 CFR 1910.38 requires one whenever another standard in part 1910 calls for it.
29 CFR 1910.38(c) lists them: procedures for reporting a fire or other emergency, procedures for emergency evacuation including type of evacuation and exit route assignments, procedures for employees who remain to operate critical plant operations before they evacuate, procedures to account for all employees after evacuation, procedures for employees performing rescue or medical duties, and the name or job title of every employee who may be contacted about the plan.
Yes, in general. 29 CFR 1910.38(b) says it must be in writing, kept in the workplace and available to employees for review. The exception is an employer with 10 or fewer employees, who may communicate the plan orally. Check your local rules, since other jurisdictions differ.
The text of 29 CFR 1910.38 does not set a drill frequency. Local fire codes may, so check yours. Many plants drill every shift at least once a year and after any layout, staffing or hazard change, then time the drill and count the people at the assembly points against a live roster.
For a non-supervised employee alarm system, 29 CFR 1910.165(d)(2) requires a test of reliability and adequacy every two months, using a different actuation device in each test of a multi-device system. Supervised systems are tested at least annually under 1910.165(d)(4).
An emergency action plan says what people do once an emergency has started: report, evacuate, be counted, help. A fire prevention plan, 29 CFR 1910.39, says how fires are prevented: the major fire hazards, ignition sources, waste control, maintenance of heat-producing equipment and who is responsible. Each is a separate written document.
Related guides and tools
- Emergency action plan template: roles with backups, warden coverage by shift, scenario steps and a drill log
- Emergency response poster: six evacuation steps and the PASS method as a free printable
- Fire extinguisher inspection log: the monthly check and annual maintenance record
- Near miss reporting: how to capture the blocked exit and the alarm nobody heard before they matter
- Safety signs: colour and shape codes, including exit signs and the Not an Exit sign
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.