Quality improvement ideas for manufacturing: 54 project examples

Short answer

Most quality improvement in a plant comes from stopping defects at the step that makes them, not from checking more. Below are 54 quality improvement project ideas for manufacturing, from supplier scorecards and mistake-proofing to gauge studies and 8D reports. Each has the problem it fixes, the effort it takes, the cost-of-quality bucket it acts on and the free template that helps. Filter by area, by bucket or by effort, and start from your biggest defect.

Last reviewed:

These are common practices, not results from any one plant, so we give no defect rates or savings. Count your own defects and costs first, and pick the idea that acts on the largest one.

Where the 54 ideas sit

Where it actsPreventionAppraisalInternal failureExternal failureIdeas
Suppliers and incoming material441none9
Process control8none1none9
Inspection and measurement36nonenone9
People and standards711none9
Defects and problem solving2none529
Customers and the quality system32229

The same 54 ideas by effort

  • Low effort: 29 ideas
  • Medium effort: 23 ideas
  • High effort: 2 ideas

A grid of the 54 ideas counted by where it acts and by cost of quality. Suppliers and incoming material: 9 ideas. Process control: 9 ideas. Inspection and measurement: 9 ideas. People and standards: 9 ideas. Defects and problem solving: 9 ideas. Customers and the quality system: 9 ideas. By effort: 29 low effort, 23 medium effort, 2 high effort.

Each cell counts the ideas in that where it acts that act on that cost of quality; the darker the cell, the more ideas. The biggest group is process control against prevention (8). Pick your row, then use the filters below.

Where to start: effort by area

Each where it acts with its ideas counted by effort. 29 of the 54 ideas are low effort. Suppliers and incoming material: 6 low, 3 medium, 0 high. Process control: 3 low, 6 medium, 0 high. Inspection and measurement: 4 low, 4 medium, 1 high. People and standards: 7 low, 2 medium, 0 high. Defects and problem solving: 7 low, 2 medium, 0 high. Customers and the quality system: 2 low, 6 medium, 1 high.

The bar in each card splits the ideas in that area by effort. The list under it is where to start: the low-effort ideas a team can do inside its own area, with little or no spending. 29 of the 54 are low effort.

Suppliers and incoming material (9)

Ideas for stopping defects before they reach your line: scorecards, limit samples, sampling and returns.

  1. Score suppliers on the defects you actually find

    • Low effort
    • Prevention
    Problem
    Suppliers are judged on price and delivery, and quality problems are argued about from memory.
    Idea
    Record defects found at receiving by supplier, share a simple score each month and agree an action with the worst two.
  2. Check the first deliveries of a new part more closely

    • Low effort
    • Appraisal
    Problem
    A new part or a new supplier starts at the normal level of checking, and the first problems reach the line.
    Idea
    Raise the sample for the first deliveries, check against the drawing, and drop to the normal level only after clean lots.
  3. Agree limit samples with the supplier for visual defects

    • Low effort
    • Prevention
    Problem
    A scratch or a colour is rejected by one inspector and accepted by another, and the supplier cannot tell what is allowed.
    Idea
    Keep a physical sample or a photo of the worst acceptable condition, agree it with the supplier and put it at receiving.
  4. Return bad material with the data on the same day

    • Low effort
    • Internal failure
    Problem
    Bad material sits in quarantine for weeks and the supplier answers when nobody remembers the details.
    Idea
    Send a corrective action request with photos, counts and the lot number the same day, and set a date for the reply.
  5. Visit the supplier's process before problems start

    • Medium effort
    • Prevention
    Problem
    The first time anyone sees the supplier's process is after a major failure.
    Idea
    Agree a visit to the suppliers with the most risk, walk their process with a checklist and agree the controls for your critical points.
  6. Mark material as held, released or rejected at receipt

    • Low effort
    • Appraisal
    Problem
    Material waiting for inspection is mixed with released stock and ends up on the line.
    Idea
    Use separate marked areas and a label for each status, and record who released what and when.
  7. Use oldest first for material with a shelf life

    • Medium effort
    • Prevention
    Problem
    Material is used in the order it is easiest to reach, and old stock expires or degrades.
    Idea
    Set up first-in, first-out lanes with a limit and a visible date so the oldest material is used first.
  8. Put the critical-to-quality points on the receiving desk

    • Low effort
    • Appraisal
    Problem
    Receiving checks what is easy to check, not what matters to the customer.
    Idea
    List the few characteristics that matter, the way to check each and the sample size, and keep the sheet at the desk.
  9. Match the sampling to the risk of the part

    • Medium effort
    • Appraisal
    Problem
    Every part gets the same checking, so risky parts are under-checked and safe ones are over-checked.
    Idea
    Rank the parts by what a defect would cost the customer, and set the sample size and the acceptance rule by rank.

Process control (9)

Ideas that keep the process on target: mistake-proofing, first-piece checks, charts, set-ups and standard work.

  1. Mistake-proof the step that causes most defects

    • Medium effort
    • Prevention
    Problem
    The same slip, such as a part fitted the wrong way, produces defects whatever people are told.
    Idea
    Change the part, the fixture or the sequence so that the wrong way is not possible, and test the device on a known bad part.
  2. Check the first piece after every set-up

    • Low effort
    • Prevention
    Problem
    A set-up is wrong and a whole batch is made before anyone notices.
    Idea
    Make the operator check the first piece against the drawing and a limit sample, and release the run only after it passes.
  3. Chart the critical dimension and react to the trend

    • Medium effort
    • Prevention
    Problem
    The dimension is checked against the limits only, so the process drifts to the edge before anyone acts.
    Idea
    Plot the measurement on a control chart at the machine, mark the rules for action and let the operator adjust before parts are out of limits.
  4. Write the set-up down

    • Low effort
    • Prevention
    Problem
    Each set-up person uses a different setting, so quality depends on who is on shift.
    Idea
    Record the settings that give good parts, put them on the machine and update them when a better setting is found.
  5. Know what the process can hold

    • Medium effort
    • Prevention
    Problem
    A tolerance is accepted without anyone knowing whether the process can hold it.
    Idea
    Run a capability study on the critical characteristics, compare the spread with the tolerance and act first on those that fall short.
  6. Write one standard way of doing the job

    • Medium effort
    • Prevention
    Problem
    Two operators do the same job differently and get different results.
    Idea
    Write the best known method with the key points and the reasons, train to it and use it as the base for the next improvement.
  7. Change tools by count, not by failure

    • Medium effort
    • Prevention
    Problem
    A worn tool is used until it makes bad parts.
    Idea
    Find how many parts a tool makes before quality slips, change it before that point and log the change.
  8. Protect parts between operations

    • Low effort
    • Internal failure
    Problem
    Parts are damaged by stacking, handling or open bins between steps.
    Idea
    Use dividers, trays or covers, and check which damage is found at the next step to see where it starts.
  9. Review the control plan against what really goes wrong

    • Medium effort
    • Prevention
    Problem
    The control plan was written at launch and does not cover the defects found since.
    Idea
    Compare it with the last year of defects and complaints, add controls where escapes occurred and remove those that catch nothing.

Inspection and measurement (9)

Ideas for gauges, check sheets, checklists and catching a defect where it is made.

  1. Prove the gauge before you trust it

    • Medium effort
    • Appraisal
    Problem
    Two inspectors measure the same part and get different answers.
    Idea
    Run a gauge study with several people and parts, and fix or replace the gauge whose variation is large against the tolerance.
  2. Calibrate on a schedule you can see

    • Low effort
    • Appraisal
    Problem
    Nobody knows which gauges are due, and a gauge out of calibration is found at an audit.
    Idea
    Label each gauge with its due date, keep a log and take any gauge past its date out of use.
  3. Tally defects on a check sheet

    • Low effort
    • Appraisal
    Problem
    Defects are known by feel and the arguments are about opinions.
    Idea
    Give each station a check sheet with the common defect types, tally every defect found and review the tally at the end of the shift.
  4. Move the check to the step that makes the part

    • Medium effort
    • Prevention
    Problem
    A defect is found two steps after it was made, and several parts are affected.
    Idea
    Have the operator check the key feature straight after the step and stop if it is wrong.
  5. Show defects with photos at the inspection point

    • Low effort
    • Appraisal
    Problem
    Inspectors disagree about what counts as a defect.
    Idea
    Build a defect catalogue with a photo, the name and the accept or reject rule for each, and put it at the point of inspection.
  6. Use one final inspection checklist

    • Low effort
    • Appraisal
    Problem
    Final inspection depends on what each inspector remembers to check.
    Idea
    List the checks, the method and the accept limits, and sign each completed sheet with the lot number.
  7. Audit the process in layers

    • Medium effort
    • Prevention
    Problem
    Quality checks are done by the quality department only, so the process drifts between audits.
    Idea
    Have operators, leads and managers each check the key points at a different frequency using a short checklist.
  8. Study the measurement system for the critical characteristics

    • High effort
    • Appraisal
    Problem
    A new gauge or method is trusted without testing how it behaves on a mix of parts and people.
    Idea
    Study the bias, repeatability and reproducibility of the system, and for pass or fail checks use an agreement study.
  9. Have each operator check the previous step's work

    • Medium effort
    • Prevention
    Problem
    The next step trusts the previous one, so a defect goes on until it reaches the end.
    Idea
    Add a quick check of the previous operator's work to each station and agree the route for a part that fails.

People and standards (9)

Ideas for training, the right to stop, alerts and making defects visible to the people who cause and prevent them.

  1. Teach people the defects they can cause and prevent

    • Low effort
    • Prevention
    Problem
    Operators do not see the defects their step makes, because they are found later.
    Idea
    Show each operator the defects from their step, and why each matters to the customer, using real parts.
  2. Let operators stop the line for a defect

    • Medium effort
    • Prevention
    Problem
    An operator sees a defect and keeps going, because stopping needs permission.
    Idea
    Agree the rule that any operator can stop for a defect, give a clear way to call help and respond fast.
  3. Show who is trained on the quality-critical steps

    • Low effort
    • Prevention
    Problem
    A step with a history of defects is run by someone who has not been trained on it.
    Idea
    Mark the quality-critical steps on the skills matrix, and allow only trained people to run them alone.
  4. Write a one-point lesson after each defect type

    • Low effort
    • Prevention
    Problem
    A defect is found, corrected and forgotten, and returns with the next new starter.
    Idea
    Write a one-page lesson with a photo of the defect and the right way, and use it in training.
  5. Open the huddle with yesterday's defects

    • Low effort
    • Prevention
    Problem
    Quality data is in a report that nobody on the floor reads.
    Idea
    Post the defect count and the top two types at the board, and ask the team what they think happened.
  6. Qualify inspectors against known good and bad parts

    • Medium effort
    • Appraisal
    Problem
    People are assigned to inspection without a check that they can see the defects.
    Idea
    Test each inspector on a set of known parts, record the result and retest at an agreed interval.
  7. Send a quality alert when a defect is found

    • Low effort
    • Internal failure
    Problem
    A defect is found on one shift and the next shift makes it again.
    Idea
    Use a one-page alert with a photo, the symptom and the immediate action, and post it at the affected stations.
  8. Thank the people who report a problem

    • Low effort
    • Prevention
    Problem
    A person who stops the line or reports a defect is questioned for slowing production.
    Idea
    Make a point of thanking people who report, and track the reports as a good sign, not a failure.
  9. Pair new starters with a trained person on quality-critical jobs

    • Low effort
    • Prevention
    Problem
    A new starter is put on a job with a high defect risk on day one.
    Idea
    Start new people on the lower-risk steps, pair them with a trained person on the critical ones and sign off when they pass.

Defects and problem solving (9)

Ideas for picking the right problem, finding the cause, containing it and checking the fix.

  1. Rank defects with a Pareto chart before choosing a project

    • Low effort
    • Internal failure
    Problem
    A quality project is chosen because it is the latest complaint, not because it is the biggest loss.
    Idea
    Count defects by type and cost over a few weeks, chart them from largest to smallest and take the first one or two.
  2. Ask why until you reach a cause you can fix

    • Low effort
    • Internal failure
    Problem
    A fix addresses the symptom, such as retraining, and the defect returns.
    Idea
    Ask why in a chain, check each answer with data on the floor, and stop at a cause that can be fixed by changing the process.
  3. Use an 8D report for problems that return

    • Medium effort
    • External failure
    Problem
    A customer problem gets a quick fix and a short reply, and appears again.
    Idea
    Use the eight steps for any repeat issue: team, description, containment, cause, corrective action, check, prevention and thanks.
  4. Describe what is and is not affected

    • Low effort
    • Internal failure
    Problem
    People guess the cause without describing where the problem does and does not occur.
    Idea
    List where, when, which part and how many, together with what could be affected but is not, and look for the difference.
  5. Contain the problem before you look for the cause

    • Low effort
    • External failure
    Problem
    Time is spent finding the cause while suspect parts are still moving to the customer.
    Idea
    Quarantine suspect stock, check what is in transit and at the customer, and set the temporary check that stays until the fix is proven.
  6. Check that the fix still holds after a month

    • Low effort
    • Internal failure
    Problem
    An action is closed when it is done, not when the problem has gone.
    Idea
    Write the check into the action, with a date and a measure, and look again after a few weeks before closing.
  7. Draw the fishbone with the people who run the process

    • Low effort
    • Internal failure
    Problem
    The cause chart is drawn by the quality department alone and misses what the operators know.
    Idea
    Draw the chart on a board with the operators, set up and maintenance, and mark the causes you can check on the floor.
  8. Write a lessons-learned note after each major problem

    • Low effort
    • Prevention
    Problem
    The knowledge from a big problem leaves with the people who solved it.
    Idea
    Write a short note on what happened, what worked and what to do in the next design or launch, and file it where planners will see it.
  9. Update the FMEA after every escape

    • Medium effort
    • Prevention
    Problem
    The risk analysis is not changed when a defect that it did not predict reaches the customer.
    Idea
    After each escape, check what the FMEA said about it, correct the ranking and add the control that would have caught it.

Customers and the quality system (9)

Ideas for complaints, the cost of poor quality, audits, change control and traceability.

  1. Log every complaint in one place

    • Low effort
    • External failure
    Problem
    Complaints arrive by phone, email and visit, and nobody sees the pattern.
    Idea
    Log each complaint with the part, the date and the reason in one list, and review the list every week.
  2. Cost the defects in the four quality buckets

    • Medium effort
    • Internal failure
    Problem
    Quality is discussed in counts, so it competes badly with other projects.
    Idea
    Add up scrap, rework, inspection, returns and complaints for a period, show them in the four cost buckets and agree the method with finance.
  3. Hold a real management review of quality

    • Medium effort
    • Prevention
    Problem
    Management review is a once-a-year document exercise.
    Idea
    Review the data, the complaints, the audit results and the actions on a regular schedule, and record decisions with owners.
  4. Run internal audits to learn, not to tick

    • Medium effort
    • Appraisal
    Problem
    Audits check that a document exists, not that the process works.
    Idea
    Plan audits around the processes with the most problems, follow a real job from end to end and record what the auditor saw.
  5. Practise a recall before you need one

    • High effort
    • External failure
    Problem
    Nobody knows how fast a lot can be traced to the customer.
    Idea
    Pick a lot, trace forward and back, time the exercise and fix the gaps in the records.
  6. Manage changes to man, machine, material and method

    • Medium effort
    • Prevention
    Problem
    A change of person, machine, supplier or method goes in without a check, and quality shifts.
    Idea
    List the changes that need a check, check the first output after each change and record the result.
  7. Keep a quality scoreboard for each area

    • Low effort
    • Appraisal
    Problem
    The quality number is a plant total, so no team sees its own contribution.
    Idea
    Show first pass yield, scrap and returns by area on a board and review it at the huddle.
  8. Track first pass yield, not only the final yield

    • Medium effort
    • Internal failure
    Problem
    Rework hides the real defect rate, because parts get fixed and counted as good.
    Idea
    Count a part as good only if it passes every step the first time, and chart the result by step.
  9. Control engineering changes with a request form

    • Medium effort
    • Prevention
    Problem
    A design change reaches the floor by email and some stations keep the old version.
    Idea
    Use a change request with the reason, the affected parts and documents and a sign-off, and check the old version is removed.

How to use this list

  1. 1

    Find your biggest defect first

    Count defects by type and cost for a few weeks and chart them. A project that acts on the largest type is worth more than several that act on small ones.

  2. 2

    Prefer prevention to checking

    Checking finds defects after they are made. Ideas tagged prevention stop them being made, which is cheaper and lasts longer.

  3. 3

    Write a clear project statement

    Say what the problem is, where and how big, what you will change and how you will measure it. A one-page charter keeps the project small enough to finish.

  4. 4

    Prove the fix and standardise it

    Check the result after a few weeks, and write the change into the standard work, the control plan and the training, or it will slip back.

Low effort

The team can do it within its own area in a day or two, with little or no spending.

Medium effort

A few weeks, a small budget or help from another department, such as maintenance or engineering.

High effort

A project: capital spending, layout changes or several departments, run with a charter and a plan.

What each cost of quality means
Prevention
Spend that stops defects from being made, such as training, planning and mistake-proofing.
Appraisal
Spend on checking, testing and measuring to find defects.
Internal failure
The cost of defects found inside the plant: scrap, rework and re-inspection.
External failure
The cost of defects found by the customer: returns, complaints and recalls.

FAQ

Quality improvement ideas: common questions

  1. Supplier scorecards, mistake-proofing the step that causes most defects, first-piece checks, a gauge study, defect check sheets, the right for operators to stop for a defect, Pareto charts to pick the project, 8D reports for repeat problems and a cost of poor quality report. This page lists 54.

  2. Count defects by type and cost, chart them from largest to smallest and take the first one or two. Then check that the team can influence the cause and that you can measure the result within a few weeks.

  3. The cost of quality is the total spent on preventing defects, checking for them and dealing with the ones that occur, split into prevention, appraisal, internal failure and external failure. The more you spend on prevention, the less usually goes on the failures.

  4. Quality control finds defects in what has been made. Quality improvement changes the process so fewer defects are made. A plant needs both, but only improvement lowers the number of defects over time.

  5. Small projects with a clear cause, such as a check sheet or a mistake-proofing device, can run in days or weeks. Projects that need a gauge study, a capability study or a supplier change take longer. Scope the work so the first result shows within a month or so.

  6. Measure the defect count or the cost before you start, again after the change and again after a few weeks. If the number moved and stayed down, write the change into the standard work and the control plan.