Free training deck
Updated · About 45 minutes
Daily management and tier meetings training presentation
Daily management is how a team finds out yesterday's problems and deals with them today: short meetings at set times from the team up to plant leadership, a board at each one that shows results against target, and a rule for passing up what a tier cannot fix. This free deck teaches it in about 45 minutes. Its 19 editable slides cover the parts of the system, the tiers, the team huddle and the area meeting, what a board shows, escalation, an illustrative example of a red travelling up, what to do when a measure is red, how leader standard work keeps it going, how to start small, the common mistakes, a 20-minute huddle exercise and four check questions with answers. Every slide has speaker notes.
Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.
The title Daily management and tier meetings on a navy background with the LeanSuite logo.A look inside
What is in the 19 slides
For team leaders, supervisors, managers and plant leaders who run or attend daily meetings. Widescreen, in plain language, with speaker notes on every slide.

Slide 4: The parts of the system 
Slide 10: Example: a red on delivery travels up 
Slide 16: Try it: run a 15-minute huddle
- 1Daily management and tier meetingsCover
- 2AgendaWhat daily management is · The tiers · The board and the huddle · Escalation · Keeping it going · Run a huddle
- 3What daily management isA way to find out yesterday's problems and deal with them today.
- 4The parts of the systemMeasures, Meetings, Escalation, Routine
- 5Tiers, one cascadeNames and numbers vary by plant. The idea does not: each level fixes what it can and passes up what it cannot.
- 6Tier 1: the team huddleSame time, same place, at the team's own board, standing.
- 7Tier 2: the area meetingWhere escalations most often stall.
- 8What the board showsA board shows results against target, so a red is obvious from across the aisle.
- 9Escalation: the rulesA problem the tier cannot solve moves up on a time limit the plant sets.
- 10Example: a red on delivery travels upA packing line. Illustrative.
- 11A useful huddle and a poor oneThe same meeting can help or waste a team's time.
- 12When a measure is redA red is a trigger for action, not a line in a report.
- 13Leader standard work keeps it runningBoards and meetings fade when nobody checks them.
- 14Starting smallStart with one area, not the whole plant.
- 15Common mistakesLong huddles that turn into problem solving.
- 16Try it: run a 15-minute huddleA 20-minute team activity
- 17Check your understanding4 check questions
- 18AnswersThe answers, to discuss
- 19Key points and next stepsNext: start one board and one huddle in one area.
The 45-minute session, slide by slide
- Slides, about: 25 minutes
- Activity (slide 16): 20 minutes
Present · 15 slides
- 1Daily management and tier meetings
- 2Agenda
- 3What daily management is
- 4The parts of the system
- 5Tiers, one cascade
- 6Tier 1: the team huddle
- 7Tier 2: the area meeting
- 8What the board shows
- 9Escalation: the rules
- 10Example: a red on delivery travels up
- 11A useful huddle and a poor one
- 12When a measure is red
- 13Leader standard work keeps it running
- 14Starting small
- 15Common mistakes
Do the activity · 1 slide
- 16Try it: run a 15-minute huddle
Check and follow up · 3 slides
- 17Check your understanding
- 18Answers
- 19Key points and next steps
About 25 minutes of slides and 20 minutes of activity. Present: slides 1 to 15 (Daily management and tier meetings; Agenda; What daily management is; The parts of the system; Tiers, one cascade; Tier 1: the team huddle; Tier 2: the area meeting; What the board shows; Escalation: the rules; Example: a red on delivery travels up; A useful huddle and a poor one; When a measure is red; Leader standard work keeps it running; Starting small; Common mistakes). Do the activity: slide 16 (Try it: run a 15-minute huddle). Check and follow up: slides 17 to 19 (Check your understanding; Answers; Key points and next steps).
How to run it
Running the session
- 1
Prepare
Read the speaker notes once and swap the illustrative example for one from your own area if you have it. Print the PDF if people like a handout.
- 2
Present
The slides take about 25 minutes. Every slide has notes, so you can talk from them rather than read the slide.
- 3
Do the activity
Pick a team and a board, even a flipchart with four measures. The activity slide takes the team through it step by step; allow 20 minutes.
- 4
Check and follow up
Ask the check questions before showing the answers, then agree one next step with an owner and a date before people leave.
The check questions
- 1. What happens to a problem the team cannot fix?
- It is escalated to the next tier with a named owner and a time limit, and the answer comes back to the team.
- 2. Why should problems not be solved inside the huddle?
- Solving takes the people who know the work and more time. The huddle is for seeing and assigning, so it stays short.
- 3. A measure is red. What goes next to it?
- An action with one owner and one due date, checked at the next huddle.
- 4. Which tier takes the problems the team huddle could not solve?
- Tier 2, the area meeting. Numbers vary by plant, but each tier takes what the tier below cannot fix.
Templates and guides to go with it
- Daily huddle agendaA 15-minute start-of-shift stand-up in six timed blocks, with yesterday's SQCDP results, today's plan, actions and escalations.
- Tier 2 meeting agenda and escalation sheetA 15-minute tier 2 agenda in ten timed blocks, fixed roles and rules, escalation triggers with time limits, and a log that ages every escalation and sends the answer back down.
- Escalation matrix templateWho is called for each type of issue and after how long, with severity rules, contacts and an escalation log.
- Leader standard work templateA team leader's daily, weekly and monthly routine with a box per day, follow-ups and a weekly review.
- Topic: Lean leadership and employee engagementEvery guide we have on the subject, sorted.
Read more
Terms in this deck
FAQ
Daily management and tier meetings training presentation: common questions
A system of short meetings, visual boards and escalation rules that lets a team find yesterday's problems and deal with them today. The meetings run in tiers from the front-line team up to plant leadership, and a leader routine keeps them going.
A cascade of short stand-up meetings held at set times each day, from front-line teams (tier 1) to area leaders (tier 2) and plant leadership (tier 3 and above). Each tier reviews results against target and passes up what it cannot solve.
About 45 minutes: roughly 20 minutes of slides, a 20-minute huddle exercise and the check questions.
There is no fixed number. Some sites run two, a team huddle and a site meeting, and large plants run four or more. Start with one team huddle in one area, and add a tier when the one below it works and has escalations to hand up.
Yes. The PowerPoint file is fully editable, including the speaker notes. Many teams swap the illustrative example for a real escalation from their own area.
More free training decks
- 5S training presentationSort, set in order, shine, standardize and sustain in 16 slides, with a 15-minute sort activity and a quiz.View deck
- Kaizen training presentationWhat kaizen is, its principles, PDCA and four steps to a first improvement in 17 slides, with an activity and a quiz.View deck
- Autonomous maintenance training presentation: the 7 stepsThe 7 steps of jishu hozen, who does what and how step audits work, in 19 slides with notes and a quiz.View deck
- 8 wastes of lean training presentationValue vs waste, the 8 wastes (TIMWOODS) with examples, muda, mura and muri and a waste walk, in 17 slides.View deck
- Gemba walk training presentationGo see, ask why, show respect: how to plan, run and follow up a gemba walk, in 16 slides with a practice walk.View deck
- Root cause analysis training presentation: 5 whys and fishboneDefine, contain, the 5 whys, the fishbone diagram and verifying the cause, in 18 slides with a team activity.View deck
- TPM training presentation: the 8 pillarsWhat TPM is, the six big losses, OEE and the 8 pillars, in 19 slides with a loss-spotting activity.View deck
- Manufacturing excellence pillars training presentationThe 20 pillars, cost deployment, the 7-step approach, model areas and audits, in 17 slides.View deck
- Obeya room training presentationWhat an obeya is, what goes on its walls and how to run the meetings, in 15 slides with a design activity.View deck
- DMAIC training presentationDefine, measure, analyze, improve and control, with the main tools of each phase, in 16 slides.View deck
- SMED training presentationInternal and external setup, the four SMED stages and how to halve a changeover, in 16 slides.View deck
- FMEA training presentationDFMEA and PFMEA, severity, occurrence and detection, RPN and action priority, in 16 slides.View deck
- Kanban training presentationPull instead of push: how a kanban loop works, the card types, the rules and how to size it, in 16 slides.View deck
- Lockout tagout (LOTO) training presentationHazardous energy, lockout versus tagout and the six steps in order, with a walk-round activity, in 17 slides.View deck
- Quality management system (QMS) training presentationWhat a quality management system is, the ISO 9001 clauses, procedures and records, corrective action and audits, in 18 slides.View deck
- SPC and Cpk training presentationCommon and special cause variation, X-bar and R limits, reading signals, Cp and Cpk, with worked numbers, in 19 slides.View deck
- MSA and Gage R&R training presentationThe five measurement properties, how a gage R&R study works, %GRR and ndc with worked numbers, and attribute gauges, in 19 slides.View deck
- PPAP and APQP training presentationThe five APQP phases, gates, the 18 PPAP elements, the five submission levels and the capability criteria, in 19 slides.View deck
- OEE training presentationHow to calculate OEE and read the six big losses in 19 slides, with one worked shift, a 20-minute exercise and a quiz.View deck
- Leader standard work training presentationWhat leader standard work is, the routine at each level, five steps to build it and how to keep it going, in 19 slides with an exercise and a quiz.View deck
- 5 Whys training presentationOhno's machine example, how to ask good whys, when to stop and where the method falls short, in 20 slides with a team exercise.View deck
- A3 problem solving training presentationThe seven boxes, the three kinds of A3, how to write and coach one, with two worked example slides and a 30-minute exercise, in 20 slides.View deck
- Poka-yoke (mistake-proofing) training presentationMistakes versus defects, the contact, fixed-value and motion-step methods, control and warning devices and how to design and test one, in 18 slides.View deck
- Layered process audit (LPA) training presentationWhat a layered process audit is, the layers, how to write and ask good questions, handle a no and read the results, in 19 slides.View deck
- Standard work training presentationTakt time, work sequence and standard WIP, how to write a standard with the operators and how to keep it alive, in 18 slides.View deck
- Value stream mapping (VSM) training presentationHow to map the current state, read lead time, design the future state with the eight questions and turn it into a plan, in 19 slides.View deck
- TWI job instruction training presentationThe four steps of TWI job instruction and the job breakdown sheet, from the original wartime card, with a worked example and a practice session.View deck
- 8D problem solving training presentationD0 to D8, containment, the root cause and the escape point, proving a fix and preventing repeats, in 20 slides with a team exercise.View deck
- Forklift safety training presentationOperator training rules, stability and load center, travel and dock rules and the daily exam, each tied to 29 CFR 1910.178, in 20 slides.View deck
- Hazard communication (HazCom, GHS) training presentationLabels, the eight GHS pictograms, the 16 SDS sections, employee training and the 2026 and 2028 dates, each tied to 29 CFR 1910.1200, in 20 slides.View deck
- New-hire safety orientation training presentationA day-one safety orientation for plants and warehouses: reporting, emergencies, PPE, chemicals, machines and trucks, with the OSHA paragraph behind each, in 17 slides.View deck
- 4M change management training presentationMan, machine, material and method changes, rating the risk, extra checks, the change point board and closing a change, in 19 slides.View deck
Training is the start. Keeping it going is the hard part.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
