Skip to content

Free training deck

Updated · About 45 minutes

OEE training presentation

Overall equipment effectiveness (OEE) is the share of planned production time that was truly productive: the machine running, running at its ideal speed and making good parts. This free deck teaches how to calculate it in about 45 minutes. Its 19 editable slides cover availability, performance and quality, the six big losses, the six numbers you need, ideal cycle time, one worked shift, rolling OEE up to a line, what a good score is, the mistakes that inflate the number, a 20-minute exercise on a real shift and four check questions with answers. It teaches the arithmetic and what each loss means; the TPM deck covers the pillars. Every slide has speaker notes, so a team leader can present it without a script.

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

The cover slide of the OEE training presentationThe title OEE, how to calculate it and read the losses, on a navy background with the LeanSuite logo.
19 editable slidesSpeaker notesAvailability, performance, qualityThe six big lossesWorked shift with the shortcut checkMixed products and roll-upCommon mistakesCalculation exercise4 check questions with answersPDF handout

A look inside

What is in the 19 slides

For operators, team leaders, supervisors and engineers who record or review OEE. Widescreen, in plain language, with speaker notes on every slide.

  • Slide 4 of the oee training presentation: The three factors.
    Slide 4: The three factors
  • Slide 9 of the oee training presentation: Example: one shift, from planned time to OEE.
    Slide 9: Example: one shift, from planned time to OEE
  • Slide 16 of the oee training presentation: Try it: calculate one shift.
    Slide 16: Try it: calculate one shift
  1. 1OEE: how to calculate it and read the lossesCover
  2. 2AgendaWhat OEE is · Availability, performance and quality · The six big losses · Calculating one shift · Mistakes and what a good score is · Calculate a real shift
  3. 3What OEE measuresOEE is the share of planned production time that was truly productive.
  4. 4The three factorsEach factor catches a different kind of lost time.
  5. 5The six big lossesBreakdowns, Setup and adjustment, Small stops, Reduced speed, Startup rejects, Production rejects
  6. 6Planned time and lost timeDecide what comes out of the clock before you start counting.
  7. 7The six numbers you needSix numbers from one machine or line over one period are enough.
  8. 8Ideal cycle time: the number people get wrongPerformance is only as good as the ideal cycle time behind it.
  9. 9Example: one shift, from planned time to OEEA line with a 450-minute planned production time.
  10. 10Where to look when a factor is lowWork on the loss with the most minutes, not the factor with the lowest score.
  11. 11Two products on one machineEach product has its own ideal cycle time, so one average will mislead you.
  12. 12Rolling up to a line or a plantDo not average OEE percentages.
  13. 13What is a good OEE?There is no single right number.
  14. 14Mistakes that move the numberMost of these make OEE look better than the floor feels.
  15. 15Using OEE on the floorThe number only helps if the people who see the losses record them.
  16. 16Try it: calculate one shiftA 20-minute team activity
  17. 17Check your understanding4 check questions
  18. 18AnswersThe answers, to discuss
  19. 19Key points and next stepsNext: calculate one real shift and look at its biggest loss.

The 45-minute session, slide by slide

  • Slides, about: 25 minutes
  • Activity (slide 16): 20 minutes
  1. Present · 15 slides

    1. 1OEE: how to calculate it and read the losses
    2. 2Agenda
    3. 3What OEE measures
    4. 4The three factors
    5. 5The six big losses
    6. 6Planned time and lost time
    7. 7The six numbers you need
    8. 8Ideal cycle time: the number people get wrong
    9. 9Example: one shift, from planned time to OEE
    10. 10Where to look when a factor is low
    11. 11Two products on one machine
    12. 12Rolling up to a line or a plant
    13. 13What is a good OEE?
    14. 14Mistakes that move the number
    15. 15Using OEE on the floor
  2. Do the activity · 1 slide

    1. 16Try it: calculate one shift
  3. Check and follow up · 3 slides

    1. 17Check your understanding
    2. 18Answers
    3. 19Key points and next steps

About 25 minutes of slides and 20 minutes of activity. Present: slides 1 to 15 (OEE: how to calculate it and read the losses; Agenda; What OEE measures; The three factors; The six big losses; Planned time and lost time; The six numbers you need; Ideal cycle time: the number people get wrong; Example: one shift, from planned time to OEE; Where to look when a factor is low; Two products on one machine; Rolling up to a line or a plant; What is a good OEE?; Mistakes that move the number; Using OEE on the floor). Do the activity: slide 16 (Try it: calculate one shift). Check and follow up: slides 17 to 19 (Check your understanding; Answers; Key points and next steps).

Prepare happens before slide 1: read the notes and swap in your own example. Then the deck runs in order: present is slides 1 to 15, do the activity is slide 16 and check and follow up is slides 17 to 19. The check questions come before their answers, so ask first.

How to run it

Running the session

  1. 1

    Prepare

    Read the speaker notes once and swap the illustrative example for one from your own area if you have it. Print the PDF if people like a handout.

  2. 2

    Present

    The slides take about 25 minutes. Every slide has notes, so you can talk from them rather than read the slide.

  3. 3

    Do the activity

    Pick one machine and one finished shift. Gather the six numbers from the schedule, the stop log and the counts. The activity slide takes the team through it step by step; allow 20 minutes.

  4. 4

    Check and follow up

    Ask the check questions before showing the answers, then agree one next step with an owner and a date before people leave.

The check questions

1. A machine ran 360 minutes of a 400-minute planned production time. What is availability?
360 ÷ 400 = 90%.
2. Which of the six big losses are performance losses?
Small stops and reduced speed.
3. Machine 1 ran 8 planned hours at 80% and machine 2 ran 2 planned hours at 50%. Is the combined OEE 65%?
No. Weighted by planned time it is 74%. Never average the percentages.
4. A line reports performance of 108%. What does that tell you?
The ideal cycle time or the count is wrong, because a machine cannot beat its ideal rate. Find the error.

After the session

Put it on the wall

Free printable poster on the same subject, so the team sees it every day: a PNG to download now, and print-ready PDFs from Letter to 24 x 36 in.

FAQ

OEE training presentation: common questions

  1. About 45 minutes: roughly 20 minutes of slides, a 20-minute exercise on a real shift and the check questions.

  2. Yes. It works one shift step by step: availability, performance, quality and OEE, then checks the answer with the one-step shortcut and turns the result into lost minutes. It also covers mixed products and how to roll OEE up to a line.

  3. The 85% often called world-class is attributed to Seiichi Nakajima's work on total productive maintenance. It is a reference for discrete manufacturing, not a target for every process. The comparison that matters is your own line, measured the same way over time.

  4. Only the part that touches OEE: the six big losses. The separate TPM training deck covers the pillars, autonomous maintenance and how plants start. This deck is the one to use when people need to calculate and read the number.

  5. Yes. The PowerPoint file is fully editable, including the speaker notes. Many teams swap the worked shift for last week's figures from one of their own machines.

More free training decks

Training is the start. Keeping it going is the hard part.

See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.

Book a 45-minute demo