4M change management training presentation

4M change management, also called change point management, is the practice of logging every change to the people, machines, materials and methods a process depends on, and checking the product more closely until the change is proven. This free deck teaches it in about 45 minutes. Its 19 editable slides cover what 4M change management is, the four Ms, why changes cause defects, planned and unplanned changes, the change point board, a five-step routine, rating the risk, extra checks and how they end, what IATF 16949 asks, supplier changes, people changes, an illustrative worked example, the common mistakes, a 15-minute activity and four check questions with answers. Every slide has speaker notes.

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

The cover slide of the 4M change management training presentationThe title 4M change management, control every change point, on a navy background with the LeanSuite logo.
19 editable slidesSpeaker notesThe four MsPlanned and unplanned changesChange point boardFive-step routineRisk and extra checksIllustrative exampleChange point activity4 check questions with answersPDF handout

A look inside

What is in the 19 slides

For team leaders, supervisors, production, quality, maintenance and engineering staff. Widescreen, in plain language, with speaker notes on every slide.

  • Slide 4 of the 4m change management training presentation: The four Ms.
    Slide 4: The four Ms
  • Slide 14 of the 4m change management training presentation: Example: a new torque gun and a new housing lot.
    Slide 14: Example: a new torque gun and a new housing lot
  • Slide 16 of the 4m change management training presentation: Try it: find this week's change points.
    Slide 16: Try it: find this week's change points
  1. 14M change management: control every change pointCover
  2. 2AgendaWhat 4M change management is and the four Ms · Why changes cause defects, planned and unplanned · The routine: log, rate, check, display, close · What the standards and customers expect · Example, common mistakes and activity
  3. 3What 4M change management isLog every change to the process, and check the product more closely until the change is proven.
  4. 4The four MsTypical change points under each M.
  5. 5Why changes cause defectsA stable process makes good parts. The first parts after a change are the least proven.
  6. 6Planned and unplanned changesLog both. The unplanned ones are the ones that slip through.
  7. 7Making changes visible: the change point boardA board at the line shows what has changed and where to look.
  8. 8The routine in five stepsEvery change, every time.
  9. 9Rating the riskThe levels are yours to set with quality. These are common questions.
  10. 10Extra checks, and when they endExtra checks need a number and a time, or they fade out on their own.
  11. 11What IATF 16949 and customers ask forIATF 16949 clause 8.5.6.1 asks for a documented process to control and react to changes that affect product realization, with the effects of a change assessed.
  12. 12Changes at suppliersA change at a supplier is a change to your process, even if you did not make it.
  13. 13People changesThe M that is most often missed.
  14. 14Example: a new torque gun and a new housing lotAn illustrative example of two change points on one line in one week. Your own plant will differ.
  15. 15Common mistakesLogging only planned changes, so repairs and relief operators are missed.
  16. 16Try it: find this week's change pointsA 15-minute team activity
  17. 17Check your understanding4 check questions
  18. 18AnswersThe answers, to discuss
  19. 19Key points and next stepsNext: put the change point board up in one area and review it in tomorrow's huddle.

The 45-minute session, slide by slide

  • Slides, about: 30 minutes
  • Activity (slide 16): 15 minutes
  1. Present · 15 slides

    1. 14M change management: control every change point
    2. 2Agenda
    3. 3What 4M change management is
    4. 4The four Ms
    5. 5Why changes cause defects
    6. 6Planned and unplanned changes
    7. 7Making changes visible: the change point board
    8. 8The routine in five steps
    9. 9Rating the risk
    10. 10Extra checks, and when they end
    11. 11What IATF 16949 and customers ask for
    12. 12Changes at suppliers
    13. 13People changes
    14. 14Example: a new torque gun and a new housing lot
    15. 15Common mistakes
  2. Do the activity · 1 slide

    1. 16Try it: find this week's change points
  3. Check and follow up · 3 slides

    1. 17Check your understanding
    2. 18Answers
    3. 19Key points and next steps

About 30 minutes of slides and 15 minutes of activity. Present: slides 1 to 15 (4M change management: control every change point; Agenda; What 4M change management is; The four Ms; Why changes cause defects; Planned and unplanned changes; Making changes visible: the change point board; The routine in five steps; Rating the risk; Extra checks, and when they end; What IATF 16949 and customers ask for; Changes at suppliers; People changes; Example: a new torque gun and a new housing lot; Common mistakes). Do the activity: slide 16 (Try it: find this week's change points). Check and follow up: slides 17 to 19 (Check your understanding; Answers; Key points and next steps).

Prepare happens before slide 1: read the notes and swap in your own example. Then the deck runs in order: present is slides 1 to 15, do the activity is slide 16 and check and follow up is slides 17 to 19. The check questions come before their answers, so ask first.

How to run it

Running the session

  1. 1

    Prepare

    Read the speaker notes once and swap the illustrative example for one from your own area if you have it. Print the PDF if people like a handout.

  2. 2

    Present

    The slides take about 30 minutes. Every slide has notes, so you can talk from them rather than read the slide.

  3. 3

    Do the activity

    List every change on the line in the last seven days. Use the maintenance log, shift notes, goods-in records and document changes. The activity slide takes the team through it step by step; allow 15 minutes.

  4. 4

    Check and follow up

    Ask the check questions before showing the answers, then agree one next step with an owner and a date before people leave.

The check questions

1. What are the four Ms?
Man, Machine, Material and Method. Some plants add Design, and some add Measurement and Environment.
2. Why are unplanned changes the riskiest?
Nobody planned the extra checks, and a repair or a relief operator is easy to forget to log.
3. What do extra checks need so they do not fade out?
A number of parts to check and a time to have them done, and a recorded time when normal checks resume.
4. When can normal checks resume?
Only when the extra checks are done and passed. A defect keeps the change open.

After the session

Put it on the wall

Free printable poster on the same subject, so the team sees it every day: a PNG to download now, and print-ready PDFs from Letter to 24 x 36 in.

FAQ

4M change management training presentation: common questions

  1. It is the practice of logging every change to Man, Machine, Material and Method, and checking the product more closely until the change is proven. It is also called change point management, and Toyota-style plants call a change point a henkaten.

  2. About 45 minutes: roughly 25 minutes of slides, a 15-minute activity and the check questions.

  3. 4M1D adds Design to the four Ms, so a drawing or specification change is logged the same way. Some plants use 6M and add Measurement and Environment. Use the set that matches your customers and your process.

  4. IATF 16949 clause 8.5.6.1 requires a documented process to control and react to changes that affect product realization, and clause 8.5.6.1.1 covers temporary changes to process controls. It does not call the method 4M, so check the standard and your customer's requirements.

  5. Yes. The PowerPoint file is fully editable, including the speaker notes. Many teams replace the illustrative example with changes from their own line and add their own check levels.