Practical guide · Lean manufacturing fundamentals
Toyota Production System (TPS): the house, the two pillars and how it works
Short answer
The Toyota Production System (TPS) is the way Toyota makes vehicles, built on two ideas: just-in-time, which means making only what is needed, when it is needed, in the amount needed, and jidoka, which means stopping the moment something goes wrong.
Toyota describes TPS as a system for removing waste completely, with the aim of a shorter lead time so customers get vehicles quickly, at low cost and with high quality. It is usually drawn as a house. The roof is that aim. The two pillars are just-in-time and jidoka. The foundation is heijunka (leveled production), standardized work and kaizen. The parts depend on each other, which is why a plant that copies one of them, usually kanban, rarely gets the result. Lean manufacturing is the name outside researchers gave to what they saw at Toyota.
Last reviewed:
What is the Toyota Production System?
Toyota's own description starts with waste. The company says the system is built on removing waste completely while looking for the most efficient way to work. The stated objective is a shorter lead time, so that a customer gets a vehicle quickly, at low cost and with high quality. It also says the system rests on making work easier for the people who do it.
Toyota names two pillars. Jidoka, which it translates as automation with a human touch, means a machine or a person stops the work as soon as an abnormality appears, so a defect is never passed on. Just-in-time means each process makes only what the next process needs, in a continuous flow. Everything else in the system exists to make those two possible.
It covers how work is scheduled, how parts move, how problems surface and who fixes them. That is the difference between TPS and lean tools picked one at a time.
The TPS house, part by part
The Lean Enterprise Institute says TPS is often illustrated with a house. Toyota's own page draws none. Take away a pillar or the foundation and the roof comes down.
The TPS house
Goal
Best quality, lowest cost, shortest lead time
Just-in-time
Make what is needed, when needed, in the amount needed
- Continuous flow
- Takt time
- Pull system
Jidoka
Stop when something is abnormal and fix the cause
- Detect the abnormality
- Stop the work
- Fix the cause
- HeijunkaSpread both the mix and the volume of work evenly across a set period
- Standardized workThe current best way to do a job, written down
- KaizenContinuous improvement of the standard
A house. The roof is the goal: Best quality, lowest cost, shortest lead time. Two pillars hold it up: Just-in-time and Jidoka. The foundation has three layers: Heijunka, Standardized work, Kaizen.
| Part of the house | What it is | What it means on the floor | Where to start |
|---|---|---|---|
| Roof: the goals | Best quality, lowest cost, shortest lead time | Every change is judged against these three, together | What lead time is |
| Pillar: just-in-time | Make what is needed, when needed, in the amount needed | Continuous flow, work paced to takt time, and pull from the next process | Just-in-time guide |
| Pillar: jidoka | Stop when something is abnormal and fix the cause | Machines that stop themselves, operators who can stop the line, an andon that calls for help | Jidoka worksheet |
| Foundation: heijunka | Spread both the mix and the volume of work evenly across a set period | A repeating mix of models through the day, not one long batch of each | Heijunka box planner |
| Foundation: standardized work | The current best way to do a job, written down | Takt time, a work sequence and a set amount of in-process stock for each job | Standard work sheet |
| Foundation: kaizen | Continuous improvement of the standard | Small changes by the people doing the work, checked and then made the new standard | Kaizen guide |
The pillars are Toyota's. The roof and foundation wording is the common drawing, not Toyota's text or the Institute's, and drawings vary.
The TPS house template puts the house on one page to check your own plant.
What are the two pillars of the Toyota Production System?
The two pillars are just-in-time and jidoka. Just-in-time means making only what is needed, when it is needed, in the amount needed. Jidoka, which Toyota translates as automation with a human touch, means stopping as soon as something abnormal appears so a defect is never passed on.
Just-in-time
Toyota points out that a car has more than 30,000 parts, so making each one early and storing it is not an option. Its page gives three principles: make only what the customer needs, do not let goods or information be held up, and make things at the pace they are sold. The next process takes what it needs and the first replaces only what was taken. A kanban card carries that message.
Jidoka
Jidoka is the older idea. Toyota traces it to Sakichi Toyoda's power loom, which stopped when a thread broke. On a line today it means equipment that stops itself, and an operator who can stop the work by pulling a cord. The andon board shows where. A machine that stops itself does not need watching, so one operator can look after several. Toyota adds a rule that is easy to miss: do the work by hand first, improve it, and only then build what you learned into the machine.
The pillars need each other. Just-in-time takes out the stock that hides problems, so every defect now stops the flow. Jidoka is what makes that bearable, because it catches the defect where it was made and forces a fix.
The foundation: heijunka, standardized work and kaizen
Heijunka is leveling. Customers do not order evenly, and if the plant follows every swing, each process upstream needs spare people, machines and stock for the peak. So the plant takes the demand for a period and spreads both the quantity and the mix evenly across it. The Lean Enterprise Institute defines heijunka as leveling the type and quantity of production over a fixed period. A pull system fed an uneven schedule passes the swings up the line, which is why drawings of the house put it at the base.
Standardized work has three elements in the Institute's definition: takt time, the sequence in which the operator does the work, and the standard in-process stock needed to keep the job moving. It is recorded on forms such as the standardized work combination table.
Kaizen keeps the house moving. A problem found by jidoka, or a gap against takt, becomes a small change that is checked and written into the standard.
A worked example: leveling one week of production
Illustrative numbers. A cell assembles three pump models. This week's orders are 600 of model A, 300 of B and 100 of C, which is 1,000 pumps. The cell runs five days with 450 minutes of working time a day.
| Model | Orders this week | Batched: when it is built | Leveled: built every day | Leveled: share of each 10 pumps |
|---|---|---|---|---|
| A | 600 | Monday to Wednesday | 120 | 6 |
| B | 300 | Thursday and Friday morning | 60 | 3 |
| C | 100 | Friday afternoon | 20 | 1 |
| Total | 1,000 | 5 days | 200 | 10 |
Takt time is 450 minutes ÷ 200 pumps = 2.25 minutes, or 135 seconds a pump. One repeat of 10 pumps takes 22.5 minutes and the cell runs 20 repeats a day.
One week of pumps: batched and leveled
Example numbersBatched: one model at a time
- Mon
- A
- A
- Tue
- A
- A
- Wed
- A
- A
- Thu
- B
- B
- Fri
- B
- C
Leveled: the same 10 pumps, 20 times a day
- A
- B
- A
- A
- B
- A
- C
- A
- B
- A
10 pumps at 135 seconds each is 22.5 minutes. 20 repeats fill the 450 minute day.
Batched: model A fills Monday to Wednesday, model B Thursday and Friday morning, model C Friday afternoon. Leveled: the pattern A B A A B A C A B A repeats 20 times a day, every day.
- Batched, the cell builds 200 pumps a day either way, but a customer who orders model C on Monday waits until Friday afternoon.
- Batched, the process that supplies model A housings is flat out for three days and idle for two. It needs stock or spare capacity to cope.
- Leveled, the cell repeats a pattern of 10 pumps, such as A B A A B A C A B A, so every model is built every 22.5 minutes.
- Leveled, each supplier sees the same small demand all day: 120 A housings, 60 B and 20 C, every day.
The catch is changeovers. The leveled pattern switches model 8 times in every 10 pumps, so it only works once a changeover takes seconds. Quick changeover work usually comes first. Work out your own takt with the takt time calculator.
The seven wastes TPS sets out to remove
Ohno's seven forms of muda, as listed from his 1988 English edition, are the target of the whole house.
- Overproduction: making more or sooner than the next step needs.
- Waiting: people or parts idle.
- Transport: moving parts further than the work needs.
- Over-processing: effort the customer does not value.
- Inventory: stock that hides problems.
- Motion: walking and reaching that adds nothing.
- Defects: making it wrong and fixing it.
Which part of the house is missing?
Which part of the house is missing
What you see
Big batches, long waits for each model
Part of the house
Heijunka
Level the mix across the day
What you see
Defects pass to the next station
Part of the house
Jidoka
Agree what is abnormal and let operators stop
What you see
Every shift does the job differently
Part of the house
Standardized work
Write the current best way with the operators
What you see
The same problem keeps coming back
Part of the house
Kaizen
Fix one cause a week and rewrite the standard
Where TPS came from
TPS was not designed in one go. Toyota's account starts in a loom works.
How the Toyota Production System came together
- 1896Sakichi Toyoda's power loom stops itself when a thread breaksThe origin of jidoka
- 1924The Type-G automatic loom changes shuttles without stoppingToyota calls it the first automatic loom with a non-stop shuttle change
- 1938Kiichiro Toyoda brings conveyor flow production to the body line at the Koromo plantFlow reaches car making. Kiichiro is credited with the just-in-time idea in the 1930s
- 1949 to 1950Taiichi Ohno takes his first steps toward just-in-time in the machine shop he managesPull and flow tried in practice
- 1978Ohno publishes Toyota Production System in Japanese. The English edition follows in 1988The system described by the person who led it
- 1984Toyota and General Motors open the NUMMI joint venture in CaliforniaTPS begins to spread outside Japan in earnest
Ohno's book is the shortest way to hear the reasoning from its source.
TPS, lean manufacturing and the Toyota Way: the difference
| Name | Whose words | What it describes |
|---|---|---|
| Toyota Production System | Toyota, with Ohno's 1978 book the classic account | How Toyota makes vehicles: the house on this page |
| Lean manufacturing | MIT-led researchers, in The Machine That Changed the World in 1990 | The same practices described for any company, later reduced to five principles |
| The Toyota Way | Toyota in 2001, and Jeffrey Liker's book in 2004 | The company's values and management habits: continuous improvement and respect for people |
So lean is TPS seen from outside. The lean principles talk about value streams and say little about jidoka or leveling, which Toyota treats as structural. A stuck lean program often lacks one of those two.
How to start with TPS in one area
- 1
Choose one line and its goal
Pick a line with steady demand and write down today's lead time, defect rate and cost per unit. These are your roof.
- 2
Make the work stable and standard
Record the current best method for each job with the operators. Fix the equipment that breaks most often.
- 3
Calculate takt and level the schedule
Divide working time by demand, as in the example, and plan a repeating mix by day.
- 4
Build in the stop
Decide what counts as abnormal at each station, give operators a way to signal it, and agree who responds and how fast.
- 5
Connect the steps with flow and pull
Move steps together where you can. Where you cannot, add a small store and a kanban loop.
- 6
Improve the standard
Take the most frequent stop each week, find its cause and rewrite the standard. Then repeat.
The order follows the house from the ground up. Plants that begin at step 5, because kanban is the visible part, find the cards expose problems they have no routine for solving.
Common mistakes when copying TPS
- Copying tools without the house. Kanban without leveling, or andon with nobody responding, gets abandoned.
- Treating jidoka as automation. The point is that work stops and the cause is fixed.
- Cutting stock first. Stock falls as a result of flow, quick changeovers and reliable machines.
- Skipping standardized work. Kaizen with no standard is a string of changes nobody can hold.
Go deeper
This page is the short version. These guides cover each part in full.
- The Toyota Production System: A Complete GuideA longer narrative on TPS and how its ideas apply outside car plants.
- Jidoka in Lean Manufacturing: The Complete GuideThe second pillar in depth: detection, stopping, response and built-in quality.
- Heijunka in JIT: Leveling Mixed-Model ProductionHow to level volume and mix, and how a heijunka box paces the withdrawals.
- Standard Work in Manufacturing: A Complete GuideThe three elements of standardized work and the forms that record them.
All our articles on this subject are in the lean manufacturing fundamentals topic.
Free templates and tools
- Kanban board templateA simple board for the pull loop between two steps.
- Toyota Production System (TPS) house templateThe TPS house for one plant or value stream: roof, two pillars and foundation, with what you do today, the evidence, a status and the next step for each element.
- Jidoka worksheet (stop at abnormality)For one line or cell, every abnormality that should stop the work: how it is detected, how the work stops, who is called, the immediate fix and the root cause step, plus a log of real stops.
- Heijunka box planner (production leveling)Weekly demand turned into containers a day, takt, pitch and slots, a leveled sequence of products and the heijunka box, with a check that the changeovers fit.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
Doing this in LeanSuite
Value Stream Mapping
Turns video of each process step into a current-state value stream map with cycle times, inventory and lead time.
See Value Stream MappingLine Balancing
Drop in a video of your line and get a Yamazumi chart, a takt comparison and rebalancing recommendations.
See Line BalancingKaizen & Projects
Manage every improvement project in one visual hub, from a small kaizen event to a full DMAIC project, and track each one through to results.
See Kaizen & Projects
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about toyota Production System
Toyota's own Toyota Way, written in 2001, rests on continuous improvement and respect for people. In Jeffrey Liker's account, leaders should understand the work thoroughly, live the philosophy and teach it, and go and see the situation themselves instead of relying on reports.
Just-in-time and jidoka. Just-in-time means making only what is needed, when it is needed, in the amount needed. Jidoka, which Toyota translates as automation with a human touch, means stopping as soon as an abnormality is detected so defects are not passed on.
No single person. Toyota credits Sakichi Toyoda with the idea behind jidoka and Kiichiro Toyoda with just-in-time. Taiichi Ohno, backed by Eiji Toyoda, built the working system on the shop floor from the late 1940s and later described it in his book Toyota Production System.
TPS is Toyota's own system. Lean manufacturing is the name researchers gave it in 1990 when they described it for other companies, and it was later summed up in five principles. Lean is broader and looser. TPS is more specific, with jidoka and leveled production built into its structure.
A drawing of the system as a building. The roof is the goal of best quality, lowest cost and shortest lead time. The two pillars are just-in-time and jidoka. The foundation is heijunka, standardized work and kaizen. It shows that the parts hold each other up.
Yes. Toyota still builds vehicles, and the Toyota Production System is how it runs the work. Its own page describes a vehicle as more than 30,000 parts, which is why it makes each part only when the next process needs it.
Related guides and tools
- Lean manufacturing principles: the five that researchers drew from TPS, and how they differ from Toyota's 14
- TPS house template: the house on one page with a self-check for each part
- Just-in-time manufacturing: the first pillar with a worked cell example
- Andon: the signal that makes jidoka work on a line
- Japanese lean terms: jidoka, heijunka, kaizen and the rest in plain English
- Standard work: the three elements and a worked example
- Takt time: the pace set by customer demand, worked on one line
- Continuous improvement: how kaizen works day to day
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Lean manufacturing principles
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.