Skip to content
Try LeanSuite for 90 days for $3,000
LeanSuite - Lean Manufacturing Software

Free template

Updated

Water spider route plan (mizusumashi)

A water spider, or mizusumashi, is a material handler who runs a fixed route at fixed times: picks parts at the supermarket, delivers them to each station, collects empty containers and kanban, and is back before the next trip. This template plans that route. Page 1 lists the stops in order with the arrival time, what is delivered and collected, time at the stop and travel to the next, then the route time against the route cycle and the cart load per trip. Page 2 is a trip log for a shift, a space to sketch the route, the rules of the route and a worked example. The Excel version works out trips per shift, containers per trip and cart spaces for each part, time at each stop from the containers it gets, arrival and departure minutes, route time against the cycle with a check, and a trip log with lateness, route minutes, missed stops and shortages.

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Page 1 of the water spider route plan: fields for route, water spider, shift, route cycle and trips per shift, a table of stops in route order with arrival time, parts delivered, what is collected, time at stop and travel to the next, and boxes for the route timing and the cart load per trip.
Route cycle and tripsStops in orderArrival timesDeliver and collectRoute time against cycleCart loadTrip logRoute rules

When to use it

When to use a water spider route plan

  • When setting up a water spider for a line or a cell for the first time.
  • When operators leave their stations to fetch parts or take away empties.
  • When the route keeps running late or stations run short between trips.
  • When demand, the product mix or the line layout changes.

How to fill it in

  1. 1

    Set the route cycle

    Pick how often the route runs, for example every 20 minutes. Many plants set it as a multiple of the pitch. Trips per shift = available minutes ÷ route cycle, rounded down.

  2. 2

    List the stops in order

    Supermarket first, then each station in the order you will walk or drive past it. Note one-way aisles and crossings.

  3. 3

    Work out what each trip carries

    For each part, containers per shift = demand ÷ quantity per container, and per trip = containers per shift ÷ trips. Round up to size the cart.

  4. 4

    Time the route

    Walk it with a stopwatch: picking at the supermarket, time at each stop, travel between stops and back. Add them up.

  5. 5

    Check it fits with time to spare

    Route time ÷ route cycle should leave a margin for a problem at a station or a busier trip. If it does not fit, cut stops or lengthen the cycle.

  6. 6

    Run it and log every trip

    Planned and actual departure, return, stops missed and shortages found. A route that is often late needs a new plan, not a faster water spider.

A filled-in example

Illustrative, not a benchmark

An example: a 20-minute route feeding four stations and the end of an assembly line, 440 available minutes, 22 trips a shift (illustrative).

  • Per trip: 1 container of brackets, 2 of harnesses, 2.5 of covers on average (2 on some trips, 3 on others) and 1 bundle of cartons, 6.5 containers in all.
  • Supermarket: 90 s + 6.5 × 30 s = 285 s. Stops: 50 + 70 + 80 + 50 s, plus 60 s at the end of the line to collect finished goods kanban: 310 s.
  • Travel: 110 s to the first station, 40 + 40 + 40 + 55 s between stops and 140 s back: 425 s.
  • Route time = 285 + 310 + 425 = 1,020 s = 17.0 minutes, 85% of the 20-minute cycle, with 3 minutes spare. The cart needs 1 + 2 + 3 + 1 = 7 container spaces.

The route fits with 3 minutes spare a trip. The trip log in the first week showed the 10:00 trip late most days, behind a forklift unloading at the same crossing, so the forklift run moved to 10:30.

Common mistakes

  • Delivering what looks low

    The kanban collected on the last trip decide what comes on the next. Topping up by eye brings back the overstock the route was meant to remove.

  • A route with no spare time

    A route planned at 100% of the cycle runs late the first time a station has a problem, and every station after it waits.

  • Adding jobs to the water spider

    Each extra task makes the route late. Change the plan first, then the job.

  • Fixing shortages on the next trip

    A shortage found on the route goes to the team leader straight away. Waiting 20 minutes can stop the line.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite runs a plant's daily lean routines in one platform: anyone on the floor raises a problem by scanning a machine's QR code and adding a photo, rules route it to the right owner with a due date set by priority, and it can be escalated from tier to tier.

FAQ

Water spider route plan (mizusumashi): common questions

More free templates

All templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.