Lean and CI poster
Updated · Free to print and share
Milk run poster
A milk run is an in-plant delivery route run on a fixed path and a fixed timetable, like a milk round. At each stop the material handler (often called the water spider) drops full containers, collects empties and kanban cards, and brings next time only what those cards ask for. Done well, lines never wait for parts and parts never pile up beside them. This poster gives six rules for running one.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Six numbered rules from fixed route and fixed time to watching the misses, and a band on what good looks like.The words on the poster
The milk run
One route, one timetable. Bring what was used, take the empties back.
- Fixed route The same stops in the same order, marked on the floor plan.
- Fixed time Leaves on the clock, every cycle, full or not.
- Pull, not push Bring what the cards or empty bins ask for. Nothing more.
- Full for empty Drop full containers, collect empties and cards.
- Standard work Route, stops and times written down and followed.
- Watch the misses A line short or a stop with no bins: note it, fix the cause.
- Lines never wait for parts, and parts never pile up beside them.
On the floor
How to use it
Putting the Milk run poster to work
- 1
Put it at the start of the route and in the material handlers' area.
- 2
Use it when designing a route: check each rule against the plan before it starts.
- 3
Review the misses weekly: which stops had no bins, and why?
- 4
Pair it with the free water spider route plan and plan for every part template.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- Rick Harris, Chris Harris and Earl Wilson, Making Materials Flow (Lean Enterprise Institute, 2003): delivery routes, the plan for every part and material handling.
Templates, decks and guides to go with it
- Water spider route plan (mizusumashi)A water spider's fixed route: stops with arrival times, what is delivered and collected, route time against the cycle, cart load and a trip log.
- Plan for every part (PFEP) templateOne row per part: supplier, pack, container, usage, lead time and locations, with ABC classes, market and line kanban counts and a lineside space check.
- Kanban card templateSix production and six withdrawal kanban cards to print and cut out, with loop sizing and a card register.
- Topic: Value stream mapping and flowEvery guide we have on the subject, sorted.
More lean and ci posters
All posters
5S poster
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
