Lean and CI poster
Updated · Free to print and share
8 wastes of lean poster (DOWNTIME)
The 8 wastes of lean are the kinds of activity that use time and resources without adding value for the customer: defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra processing, remembered as DOWNTIME. Taiichi Ohno described seven; unused talent was added later. This poster gives each waste a definition and an example, plus mura (unevenness) and muri (overburden), which cause much of the waste.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Eight cards spelling DOWNTIME, each with a definition and example, and a strip for muda, mura and muri.The words on the poster
The 8 wastes: DOWNTIME
Waste is anything the customer wouldn't pay for. Learn to see it.
- Defects Scrap, rework, errors. A rework bench.
- Overproduction More, or sooner, than needed. Big batches.
- Waiting People or parts idle. Waiting for sign-off.
- Non-utilized talent Ideas nobody asked for. Skills unused.
- Transportation Moving things more than needed. Forklift trips.
- Inventory More than the next step needs. WIP piles.
- Motion Walking, reaching, searching. Fetching tools.
- Extra processing More than the customer needs. Double entry.
- Muda Waste
- Mura Unevenness
- Muri Overburden
On the floor
How to use it
Putting the 8 wastes of lean poster (DOWNTIME) poster to work
- 1
Take it on a waste walk, or put it where the team meets, so everyone uses the same words.
- 2
Mark the wastes you find in your own area with sticky notes on the poster.
- 3
Teach it with the free 8 wastes training deck.
- 4
Pair it with the free waste walk checklist.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- Taiichi Ohno described seven wastes in the Toyota Production System; non-utilized talent was added later by lean practitioners.
Templates, decks and guides to go with it
- 8 wastes of lean training presentationFree training deck: Value vs waste, the 8 wastes (TIMWOODS) with examples, muda, mura and muri and a waste walk, in 17 slides.
- Waste walk checklist (TIMWOODS)32 things to look for across the eight wastes, with where and how much, and a findings log with dot votes, owners and dates.
- Spaghetti diagram templateSquared paper to trace every trip, a trip log that turns grid squares into feet, meters and walking time, and a before and after comparison.
- Lead time worksheetProduction lead time from the inventory waiting at each step, value-added time and process cycle efficiency, plus an order traced from order to delivery.
- Topic: Lean manufacturing fundamentalsEvery guide we have on the subject, sorted.
- Topic: Value stream mapping and flowEvery guide we have on the subject, sorted.
More lean and ci posters
All posters
5S poster
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
How to write an OKR poster
Goal cascade poster
Catchball: three replies poster
Reading the X-matrix poster
Monthly operations review poster
RACI chart poster: who does what, who decides
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
