Lean and CI poster
Updated · Free to print and share
Causal and resultant losses poster
A causal loss is one that starts a chain, such as a breakdown. Resultant losses are what follow from it: scrap made during the failure, extra checks, setup and restart, slow running afterwards, spare parts, energy used while nothing is made, people waiting and overtime to catch up. Counting only the stop hides most of the cost. This poster shows one breakdown and the eight losses that follow it, so a team costs the whole chain and attacks the cause.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
A breakdown at the top and eight cards for the resultant losses it causes, from scrap to overtime.The words on the poster
One breakdown, many costs
A causal loss starts the chain. Resultant losses follow it. Count them all, fix the cause.
- Causal loss: the line stops for a breakdown. That is where the bill starts, not where it ends.
Resultant losses that follow
- Scrap and rework Parts spoiled by the failure and the restart.
- Extra checks More inspection until the line is trusted.
- Setup again Re-setting and adjusting after the repair.
- Slow restart Unstable, slower running after the stop.
- Spare parts Parts and materials used in the repair.
- Energy Ovens, air and lights on while nothing is made.
- People waiting Operators idle, or moved to other work.
- Overtime Extra hours to catch up the lost output.
Causal and resultant losses after Yamashina and Kubo, Manufacturing cost deployment (2002).
On the floor
How to use it
Putting the Causal and resultant losses poster to work
- 1
Pin it by the downtime board, so a stop is costed with everything that followed it.
- 2
Use it when ranking losses: a small causal loss can carry a large resultant cost.
- 3
Ask the team which of the eight followed the last big stop, and how much each cost.
- 4
Pair it with the free cost deployment matrix and equipment downtime log.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- H. Yamashina and T. Kubo, "Manufacturing cost deployment", International Journal of Production Research (2002): the seven steps from total cost to an improvement plan, and the split into causal and resultant losses.
Templates, decks and guides to go with it
- Manufacturing excellence pillars training presentationFree training deck: The 20 pillars, cost deployment, the 7-step approach, model areas and audits, in 17 slides.
- Cost deployment matrixWCM cost deployment on paper and in Excel: loss quantities by process, causal and resultant losses, the cost of each loss, a Pareto and the projects that recover them.
- Equipment downtime log (MTTR and MTBF)A breakdown and downtime log, with MTTR, MTBF and downtime by machine and cause worked out in Excel.
- Loss tree worksheetBreak one big loss number into area, line, machine, loss type and cause, and stop at the cause a team can fix.
- Downtime reason codes template26 starter codes mapped to the six big losses, a log with drop-downs, a Pareto by code and by loss, and a code card for the line.
- Topic: Kaizen and continuous improvementEvery guide we have on the subject, sorted.
- Topic: TPM and maintenanceEvery guide we have on the subject, sorted.
Terms on this poster
More lean and ci posters
All posters
5S poster
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
