Lean and CI poster
Updated · Free to print and share
Spare parts min/max poster
A spare parts store works when every bin shows its minimum and maximum: order when stock falls to the minimum, and order up to the maximum. The minimum covers what is used while a new order arrives, plus a safety margin. This poster explains min, max and the bin label, and the five habits that keep the store honest: log every withdrawal, order on the day the minimum is reached, protect critical spares, count and review, and send repairable parts back for repair.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Three cards for min, max and the bin label, and five numbered habits that keep critical spares on the shelf.The words on the poster
Spare parts: min and max
Order at the min, up to the max. Never wait for the bin to be empty.
On every bin
- Min Order here. Covers the wait, plus a margin.
- Max Order up to it, no more.
- Label Part number, what it fits, location.
Keep it working
- Log every withdrawal At the time, against the machine.
- At the min, order The same day, not when it runs out.
- Protect critical spares Long lead time, critical machine: check them first.
- Count and review Change min and max when use or lead time changes.
- Repairables go back Tagged, for repair, not into the bin.
On the floor
How to use it
Putting the Spare parts min/max poster to work
- 1
Hang it in the maintenance stores and at the counter where parts are issued.
- 2
Check a handful of bins against it: are min, max and the location on every label?
- 3
Review min and max for critical spares when a lead time or the usage changes.
- 4
Pair it with the free critical spare parts list and reorder point and safety stock sheet.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Templates, decks and guides to go with it
- TPM training presentation: the 8 pillarsFree training deck: What TPM is, the six big losses, OEE and the 8 pillars, in 19 slides with a loss-spotting activity.
- Critical spare parts list and stocking levelsAssets ranked by consequence, each part classed and given a stocking policy, and min and max worked out from usage and lead time, with the downtime each stock-out would cost.
- Reorder point and safety stock sheet (many parts)Safety stock, reorder point, order quantity and an order list for up to 500 parts, worked out from each part's own demand and lead time history.
- Inventory cycle count sheetA blind count sheet with variance and tolerance, an ABC count schedule and record accuracy, worked out in Excel.
- Equipment criticality analysisAssets scored 1 to 5 on six criteria with your own weights, ranked and sorted into classes A, B and C with a safety override and a suggested maintenance strategy.
- Topic: TPM and maintenanceEvery guide we have on the subject, sorted.
More lean and ci posters
All posters
5S poster
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
