Lean and CI poster
Updated · Free to print and share
5S poster
5S is a five-step method for organizing a work area and keeping it that way: sort, set in order, shine, standardize and sustain (seiri, seiton, seiso, seiketsu and shitsuke). This poster gives each S in large type with what to do and one question the team can ask in its own area, for 5S boards, team areas and the start of a 5S event.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Five numbered rows for sort, set in order, shine, standardize and sustain, each with its Japanese name, what to do and a question.The words on the poster
5S
A workplace that shows its problems.
- Sort (seiri) Keep what the work needs. Red-tag the rest. Is it needed here?
- Set in order (seiton) A marked place for everything, close to where it is used. Can anyone find it fast?
- Shine (seiso) Clean, and inspect while you clean. What did cleaning show us?
- Standardize (seiketsu) Photo standards, labels and checklists. Would someone new know what good looks like?
- Sustain (shitsuke) Short audits on a schedule. Act on what they find. What changed since the last audit?
- With the team, one area at a time. 5S is done by the people who work there.
On the floor
How to use it
Putting the 5S poster to work
- 1
Put it on the 5S board in each area, next to the photo standard and the audit scores.
- 2
Use the question under each S as the start of the area's 5S audit.
- 3
Teach it with the free 5S training deck, then do a 15-minute sort.
- 4
Pair it with the free 5S audit checklist and red tag log.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Templates, decks and guides to go with it
- 5S training presentationFree training deck: Sort, set in order, shine, standardize and sustain in 16 slides, with a 15-minute sort activity and a quiz.
- 5S audit checklist template25 checks, five per S, scored 1 to 5, with a score summary and a chart of the five S's.
- 5S red tag log and red tagsA log of every red-tagged item with its decision, and six printable red tags to cut out.
- Office 5S audit checklist25 checks written for offices and shared areas, five per S, scored 1 to 5, with a score summary and actions.
- Shadow board plannerTool inventory with fetch time, a layout planned from each tool's outline size, a month of daily checks with 5S audit evidence, and a missing tool log.
- Floor marking color guideA floor marking color standard with swatches, marks and line widths to fill in, and a floor marking check with a layout sketch.
- Topic: 5S and visual managementEvery guide we have on the subject, sorted.
Terms on this poster
More lean and ci posters
All posters
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
How to write an OKR poster
Goal cascade poster
Catchball: three replies poster
Reading the X-matrix poster
Monthly operations review poster
RACI chart poster: who does what, who decides
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
