Lean and CI poster
Updated · Free to print and share
KPI tree poster
A KPI tree links the plant's top goals to the measures each area and team works on, so every measure on a team board moves a number above it. Read down, it shows who has to act; read up, it shows why the action matters. This poster follows one example chain from a plant goal on cost per good unit, through an area result and a line measure, to a team action and the daily check that proves it was done.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
A five-level ladder from plant goal to area result, line measure, team action and daily check, with a rule for orphan measures.The words on the poster
KPI tree: goal to action
Read down to find who acts. Read up to see why it matters.
One example chain
- Plant goal Lower cost per good unit this year.
- Area result Higher OEE on the packing lines.
- Line measure Fewer minutes of small stops per shift.
- Team action Clean and check the infeed sensors at every shift start.
- Daily check Sensor check done? Yes or no, on the team board.
- Links to nothing above it? Stop tracking it, or find the goal it serves.
On the floor
How to use it
Putting the KPI tree poster to work
- 1
Put it where goals are deployed, next to the plant's goals or X-matrix.
- 2
Build one chain per plant goal with the team leaders, on the wall, with sticky notes.
- 3
Use the closing rule to clear boards of measures that link to nothing.
- 4
Pair it with the free SMART goals template and manufacturing KPI dashboard.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Templates, decks and guides to go with it
- SMART goals templateWrite a goal, test it against the five SMART letters, then track progress toward the target against the time used.
- Manufacturing KPI dashboard templateWeekly plant numbers in, 14 KPIs out: OEE and its parts, first pass yield, scrap, on-time delivery, recordable rate, cost and absence, each against a target.
- Topic: Lean leadership and employee engagementEvery guide we have on the subject, sorted.
More lean and ci posters
All posters
5S poster
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
