Lean and CI poster
Updated · Free to print and share
Four loss families poster
A loss is any cost the product does not need. Most plants sort losses into four families: machine or equipment losses (the machine is not making good parts), people (time that adds no value), material (more material used than the product needs) and energy (energy used when nothing is made). Naming losses the same way in every department lets them be added up, compared and ranked. This poster shows the four families with three common losses in each.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
Four panels for machine, people, material and energy losses, each with three common examples.The words on the poster
Where cost is lost
Four families of loss. Call them by the same names in every department.
- Machine Not making good parts. Breakdowns and small stops Changeovers and running slow Startup and quality losses
- People Time that adds no value. Walking, searching and waiting Work unbalanced between people Checks and rework by hand
- Material More than the product needs. Scrap and yield loss Supplier defects Consumables and tools used up
- Energy Used when nothing is made. Machines left running idle Compressed air leaks Heat and light in empty areas
Machine losses after Nakajima's six big losses; families as commonly grouped in cost deployment.
On the floor
How to use it
Putting the Four loss families poster to work
- 1
Put it where losses are logged, so everyone books them under the same names.
- 2
Use it on a loss walk: find one example of each family in the area.
- 3
Use it before a cost deployment cycle to agree the loss list.
- 4
Pair it with the free six big losses worksheet and loss tree worksheet.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- Seiichi Nakajima, Introduction to TPM: Total Productive Maintenance (Productivity Press, 1988): the six big losses, which make up most of the machine family.
- The grouping into machine (equipment), people, material and energy is common practice in cost deployment; see Yamashina and Kubo, Manufacturing cost deployment (2002).
Templates, decks and guides to go with it
- Manufacturing excellence pillars training presentationFree training deck: The 20 pillars, cost deployment, the 7-step approach, model areas and audits, in 17 slides.
- Six big losses worksheetWhere a machine's planned time goes: the six big losses in minutes, ranked, with A, P, Q and OEE worked out.
- Loss tree worksheetBreak one big loss number into area, line, machine, loss type and cause, and stop at the cause a team can fix.
- Cost deployment matrixWCM cost deployment on paper and in Excel: loss quantities by process, causal and resultant losses, the cost of each loss, a Pareto and the projects that recover them.
- Energy loss matrix templateSeven types of energy loss by six energy sources with a cost in each cell, an action plan and an idle-period shutdown checklist.
- Topic: Kaizen and continuous improvementEvery guide we have on the subject, sorted.
More lean and ci posters
All posters
5S poster
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
CILR poster: clean, inspect, lubricate, re-tighten
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
