Lean and CI poster
Updated · Free to print and share
CILR poster: clean, inspect, lubricate, re-tighten
CILR stands for clean, inspect, lubricate and re-tighten: the four routines that keep a machine in its basic condition, done by operators as part of autonomous maintenance. Much accelerated wear comes from missing one of them. This poster shows the four as a cycle with what each means, and reminds the team that every CILR task belongs on the machine's written standard and calendar, with who does it, when and how long it takes.
Download the poster
The PNG is free to download now. The print-ready vector PDFs open after a short form, once.
Free to print and share with your team. Enter your name and work email once to download.
A four-part cycle of clean, inspect, lubricate and re-tighten around the letters CILR, with a line on each.The words on the poster
CILR
Clean, inspect, lubricate, re-tighten. Every day, by the people who run the machine.
- Clean Remove dirt, chips and oil so faults can be seen.
- Inspect Levels, gauges, belts, leaks, noise, against the standard.
- Lubricate Right lubricant, right amount, right point, right time.
- Re-tighten Check marked bolts. Loose ones get tightened or tagged.
- Who, what, when, how long: every CILR task is on the machine's standard and calendar.
- CILR standard for this machine is at: ____
On the floor
How to use it
Putting the CILR poster: clean, inspect, lubricate, re-tighten poster to work
- 1
Put it at each machine next to its CILR standard, and write where that standard is kept.
- 2
Use it to teach new operators what the daily machine checks are for, not just how to tick them.
- 3
In a standard review, check that every task on the CILR sheet sits under one of the four.
- 4
Pair it with the free autonomous maintenance checklist and lubrication schedule.
Which size to print
- 24 x 36 in or A2: a main wall or team board, read from a few metres away.
- 18 x 24 in or A3: a station or notice board. The A3 file also fits 11 x 17 in paper.
- Letter or A4: a clipboard, binder or handout, on any office printer.
Every PDF is vector, so it stays sharp at full size. Nothing runs to the edge of the page, so no bleed is needed.
Sources and notes
- Japan Institute of Plant Maintenance (ed.), Autonomous Maintenance for Operators (Productivity Press, 1997), and TPM for Every Operator (Productivity Press, 1996).
Templates, decks and guides to go with it
- Autonomous maintenance training presentation: the 7 stepsFree training deck: The 7 steps of jishu hozen, who does what and how step audits work, in 19 slides with notes and a quiz.
- Autonomous maintenance (CILR) checklist20 clean, inspect, lubricate and retighten checks with a box per day, an abnormality log and sign-off.
- Lubrication schedule templateEvery lube point with lubricant, method, amount, frequency and who, with next due dates and a monthly sign-off record.
- Preventive maintenance checklist templateA PM checklist per machine with readings and sign-off, and a PM schedule that works out the next due date.
- Topic: TPM and maintenanceEvery guide we have on the subject, sorted.
More lean and ci posters
All posters
5S poster
8 wastes of lean poster (DOWNTIME)
Kaizen principles poster
Visual management poster
Standard work poster
Gemba walk questions poster
TPM 8 pillars poster
Kanban rules poster
Autonomous maintenance 7 steps poster
Cleaning is inspection poster
7 types of abnormality poster (TPM tags)
Lubrication basics poster: the five rights
Bolt match marks poster
Small stops poster
Breakdown analysis poster
Types of maintenance poster
Natural vs accelerated wear poster
Failure warning signs poster (P-F curve)
Spare parts min/max poster
Machine visual controls poster
How to run a 5S audit poster
Red tag event poster
Shadow board poster
Floor marking colours poster
Set in order poster: where, what, how many
Kaizen sizes poster
Quick kaizen card poster
Cost deployment 7 steps poster
Causal and resultant losses poster
Four loss families poster
ECRS poster
PICK chart poster
Suggestion system poster
Benefit-cost ratio and payback poster
Model area and expansion poster
Skills matrix levels poster
Job instruction 4 steps poster
One-point lesson poster
Learn, use, teach, inspect poster
Leader standard work poster
Tiered meetings poster
SQDCP board poster
Leading and lagging indicators poster
KPI tree poster
A3 report layout poster
Heijunka production levelling poster
Milk run poster
FIFO lane rules poster
Flow, supermarket or FIFO lane poster
Value stream map symbols poster
Bottleneck five focusing steps poster
A poster reminds. A routine makes it stick.
See how plants run their audits, improvements and follow-ups in LeanSuite, on a call built around your own problem.
Book a 45-minute demo
