JSRA: job safety risk assessment, the three-factor score and a worked form

Short answer

JSRA stands for job safety risk assessment, also written job safety risk analysis. It is a job safety analysis with a score: each step of a job is rated for probability, gravity and controls, one to three each, and the three are multiplied to give a number from 1 to 27.

JSRA is short for job safety risk assessment, sometimes job safety risk analysis. It is a company method, not a term any regulator defines. You break one job into steps, name the hazard at each step, and give three ratings from 1 to 3: probability (how likely), gravity (how bad) and measures and controls (how weak the protection is, where 1 is an engineered control and 3 is nothing). Multiply the three to get a score from 1 to 27, work the highest scores first, fit the controls, and score again to show the risk that is left. Teams use it to rank the steps of a job, justify the fixes and track how many jobs have been assessed. This is general guidance, not legal advice.

Last reviewed:

What is a JSRA, and what does the full form mean?

JSRA stands for job safety risk assessment. You will also see job safety risk analysis, and the letters are used in the same way. It is the plain job safety analysis with one thing added: a number. Every step of the job gets a score for how risky it is, so a team can see which steps to fix first and prove, afterwards, that the fix worked.

Be clear about what it is not. JSRA is a method name that companies use, mostly in manufacturing safety programmes. No regulator defines it, OSHA's booklet on job hazard analysis does not use it, and as far as we can find ISO 45001 does not either. So there is no official JSRA form to be right or wrong about. What you build is your own, and the quality comes from how the scores are given and what is done with them.

How it differs from its neighbours: the JSA lists steps, hazards and controls and may not score anything. The JHA guide scores severity times likelihood on a five-by-five scale. The JSRA scores three factors on a three-point scale, and the third factor, how good the existing protection is, is what sets it apart. The comparison guide puts all the documents side by side.

The three-factor score: probability, gravity, measures and controls

Each step gets three ratings from 1 to 3. The wording below is ours, written so that a team can argue about it for a minute and settle. Replace it with your site's own definitions, and write them on the form so every team scores the same way.

The three JSRA scales, with example wordings (our convention; use your site's)
ScoreP: probabilityG: gravityM/C: measures and controls
1Unlikely: has not happened on this job and is not expected in a working yearMinor: first aid, no lost timeEngineered control in place and working: a guard, interlock, fixture or lifting aid that does not depend on memory
2Possible: could happen within a year, or has happened on a similar jobSerious: medical treatment or lost time, full recovery expectedProcedure, training or PPE only: protection depends on a person doing the right thing
3Likely: happens, or nearly happens, on this job or in this areaSevere: permanent injury, loss of a limb or sight, a fatality, or several people hurtNothing effective in place, or the control is routinely bypassed

Gravity means the realistic worst injury at this step, not the worst imaginable. Score it with the controls in place for P and M/C, and say so on the form.

Mind the direction of the third scale. For probability and gravity a higher number is worse, as you would expect. For measures and controls it is the same: 3 means the protection is poor. That feels backwards when you read it as "measures: 3", which sounds like a lot. Say it aloud as "controls: weak" until it sticks, or rename the column "control weakness" on your own form.

Multiply the three numbers. A step with probability 2, gravity 3 and weak controls (3) scores 2 times 3 times 3, which is 18. Multiplying, rather than adding, lets one very good control or one very low gravity pull the score down hard, and one bad factor push it up. Because each factor is 1, 2 or 3, only ten scores are possible: 1, 2, 3, 4, 6, 8, 9, 12, 18 and 27. That makes ranking quick and also means many steps will tie.

Most programmes group the ten into three bands. The bands below are a common convention, not a standard: you set your own. Out of the 27 possible combinations of three ratings, 4 land in the top band, 7 in the middle one and 16 in the bottom one, so a job with a lot of steps in the top band has a real problem.

Three ratings from 1 to 3 give only ten possible scores

P 2G 3M/C 318possible, serious, weak controls
Act now: 18 to 274 of the 27 combinations
271 combination
183 combinations
Plan the fix: 8 to 127 of the 27
123 combinations
93 combinations: incl. P1 G3 M/C3
81 combination
Monitor: 1 to 616 of the 27
66 combinations
43 combinations
33 combinations
23 combinations
11 combination

P times G times M/C, each 1 to 3, can only produce 1, 2, 3, 4, 6, 8, 9, 12, 18 or 27. Of the 27 combinations, 4 score 18 or more, 7 score 8 to 12 and 16 score 6 or less. The bands are a convention. A step with probability 1, gravity 3 and weak controls scores 9.

Bands are a convention, not a standard. Watch the 9: probability 1, gravity 3 and weak controls lands in the middle band, where a rare but severe step can hide.

Two cautions belong with the bands. First, do not let a low score hide a high gravity. A step with probability 1, gravity 3 and weak controls (3) scores only 9 and sits in the middle band, yet it is a step where one lapse could kill. Many teams add their own rule that any step with gravity 3 gets a named owner and a written reason, whatever its score. Second, treat the number as a way to start the conversation, not to end it.

The JSRA form, column by column

Layouts vary, but a working JSRA form has a header and one row per step with these columns. It is a JSA form with five extra columns: the three ratings, the score, and a second set of ratings for after the fix.

Columns of a JSRA form
ColumnWhat goes in it
HeaderDepartment, area or station, shift, the job, routine or non-routine, date, review date, and the team that did the assessment, including at least one person who does the job
Step or elementOne action, a verb and an object, in the order done. The element list of a time study works as the step list
Hazard and risk familyWhat could happen and to whom, and the family it belongs to: equipment, environment, location, ergonomic, chemical, electrical or your own list. Families let you add up the picture later
Body partThe part of the body at risk: hands, eyes, back. It points straight at the PPE and the guard
P, G, M/C and scoreThe three ratings, 1 to 3 each, and their product
Current countermeasureWhat is in place today that makes the M/C rating what it is. If you cannot write something here, M/C is 3
PPEWhat protective equipment the step needs, named, not "as required"
Proposed countermeasureWhat will change, strongest control first (see the hierarchy of controls), with an owner and a date
Second P, G, M/C and scoreThe ratings you expect once the proposed countermeasure is in. This is the residual risk, and the number to re-check after the fix
Sign-offTeam members, approver and the date the operators were briefed

The second score is a prediction until you re-check. Many programmes re-score some weeks after the fix, with the people who work the job, and replace the prediction with what they find.

How to run a JSRA in six steps

The method is a loop, and the last two steps are the ones that turn a form into an improvement. A small team does it: the supervisor or team leader, two or three people who do the job, and someone from safety or maintenance who can say what is possible.

Six steps of a JSRA

  1. 1

    Identify: break the job down and list the hazards

  2. 2

    Assess: give P, G and M/C and multiply

  3. 3

    Choose countermeasures from the top of the hierarchy

  4. 4

    Implement and update the paperwork

  5. 5

    Check that it worked

  6. 6

    Expand sideways

Steps 5 and 6 turn the form into an improvement: check that the fix worked, then copy it to every similar job.
  1. 1

    Identify: break the job down and list the hazards

    Watch the job, or film it, and write the steps. Walk through the hazard families for each step and write what could happen to whom. Ask the operators about the near misses and the workarounds. See JSA from video for getting the steps from a time study video.

  2. 2

    Assess: give P, G and M/C and multiply

    Score every row with the people in the room, one factor at a time and out loud. Write down why when the team disagrees. Score with today's controls, as they are used on a bad day, not as they are drawn.

  3. 3

    Choose countermeasures from the top of the hierarchy

    Start with the highest scores. Ask first whether the step can go, then whether it can be made safe by design, then whether a guard, fixture or aid can hold it. Procedure and PPE come last. Write the second ratings as you go.

  4. 4

    Implement and update the paperwork

    Fit the control, change the procedure and the training, update the PPE list and the station placard. Brief the operators at the job and collect signatures.

  5. 5

    Check that it worked

    Go back after a few weeks, with a time long enough for the control to be used for real, and score again. If the real score is higher than the prediction, the control is not doing its job. Many programmes use about 90 days; pick what fits your job.

  6. 6

    Expand sideways

    List the other stations, lines and plants with the same hazard and copy the fix. A fix that is found once and used once is a repair. A fix copied to every similar job is a standard.

A worked JSRA: the trim press job, before and after

Illustrative example. An operator trims and stacks a die-cast housing at a trim press cell, one housing a cycle, 9 kg. Observed at a normal pace the job has eight elements and a 48 second cycle. The same job is worked as a time study, a severity times likelihood JSA and a REBA score in the one study, three outputs guide; here it is scored on the JSRA scale. The elements, the hazards and the scores are invented for this page.

JSRA for the trim press job, before and after the fixes (illustrative)
#Element and hazardPGM/CScoreCountermeasureP afterG afterM/C afterScore after
1Pick the housing from the cooling conveyor: contact with a warm part2124None needed beyond gloves2124
2Load it into the trim die: hands at the point of operation1313Already behind a two-hand control and a light curtain1313
3Step back, press the start, press trims: ejected flash and noise2228Next planned: a fixed shield at the die2228
4Unload the trimmed housing: sharp flash edge3126Cut-resistant gloves and sleeves2124
5Clear trimmed flash from the die by hand: hand in the die, sharp scrap23318Eliminate: air blast and a scrap chute clear the flashstep removed0
6Deburr two edges with a hand file: repeated wrist motion, sharp edge2124None this round2124
7Turn, bend and stack on a pallet on the floor: back strain32318Pallet on a spring lift table, turned to face the operator1212
8Walk back to the conveyor: trip on flash on the floor22312The chute keeps flash off the floor1212

Score = P times G times M/C. Before: 4, 3, 8, 6, 18, 4, 18, 12, which adds up to 73. After: 4, 3, 8, 4, 0, 4, 2, 2, which adds up to 27. The sum is only a rough size of the problem; it is not a measure of safety.

JSRA scores for the trim press job, before and after

Example numbers
Before the fixesAfter the fixes
1 Pick the housing from the conveyor
4
4
2 Load it into the trim die
3
3
3 Step back, start, press trims
8
8next fix: fixed shield
4 Unload the trimmed housing
6
4gloves and sleeves
5 Clear flash from the die by hand
18
Step removed: score 0air blast and chute
6 Deburr two edges with a file
4
4
7 Turn, bend and stack on the floor
18
2lift table
8 Walk back to the conveyor
12
2flash kept off the floor

Scores before and after the fixes, element by element: 1 pick, 4 then 4. 2 load, 3 then 3. 3 start and trim, 8 then 8. 4 unload, 6 then 4. 5 clear flash, 18 then removed. 6 deburr, 4 then 4. 7 stack, 18 then 2. 8 walk back, 12 then 2. The highest score falls from 18 to 8.

Highest score 18 before, 8 after. Element 5 is removed, 7 and 8 fall to 2 with a lift table and a chute, and element 3 at 8 is the next planned fix.

Read it from the top score down. Elements 5 and 7 are both 18, and they have different causes. In element 5 the controls are absent (M/C 3) and the gravity is severe, since a hand is in a die. The fix is to remove the step: an air blast and a chute do the clearing, so nobody reaches in. That is the strongest control there is, and it takes 5 seconds out of the cycle. In element 7 it is probability and weak controls together: a twisted lift to floor level, done every cycle. A lift table that raises the pallet and turns it toward the operator takes probability to 1 and M/C to 1.

Element 8, at 12, is the quiet one. A trip hazard rarely makes a risk list, and here it exists because of element 5: flash on the floor. Removing the cause removes the hazard, and the score falls to 2 with no new equipment on the walking route. Element 4 is the honest one: gloves and sleeves are PPE, which is the weakest kind of control, so M/C stays at 2 and only the probability falls a point, from 3 to 2.

After the fixes the highest score on the job is 8, from element 3, down from 18. That is the next planned fix, a fixed shield at the die, and the form says so. Do not compare these numbers with the severity times likelihood scores the same job gets on a five-by-five scale in the other guides: highest 15 before and 10 after there. Different scales give different numbers for the same job, and a score only means something against the scale it came from.

The JSRA summary sheet: one picture for the station

Nobody at a press reads eight rows of scores. A summary sheet takes the highest score in each risk family and the PPE by body area, and is posted at the station so operators and visitors see the top risks in ten seconds. Some teams add a photograph of the machine with numbered callouts at the highest-scoring hazards. Update it whenever a countermeasure changes a score.

Summary sheet extract for the trim press job: highest score by risk family (illustrative)
Risk familyElements in itHighest beforeHighest after
Equipment (point of operation, die)2, 5183
Ergonomic (lifting, repeated motion)6, 7184
Location (floor, walking route)8122
Hazard (heat, flash, noise, sharp edges)1, 3, 488

Family assignments are a house choice. Pick the list that matches the way your site reports incidents.

Summary sheet: highest score by risk family

Example numbers
Before the fixesAfter the fixes
Equipment (elements 2, 5)
18
3
Ergonomic (elements 6, 7)
18
4
Location (element 8)
12
2
Hazard: heat, flash, noise, sharp (1, 3, 4)
8
8

Highest score by risk family for the trim press job, before then after: equipment 18 then 3, ergonomic 18 then 4, location 12 then 2, hazard 8 then 8.

The hazard family did not move. That one bar tells the team where the next fix goes.

The summary also shows what the fixes did not touch. The hazard family is still at 8, so the next job on the list is clear. And it gives you the one number several programmes track: the share of jobs that have a JSRA at all. If 40 of 80 jobs are assessed, coverage is 50 percent, and the unassessed ones should be the non-routine and maintenance jobs first.

Routine and non-routine jobs

A routine JSRA belongs to a station and describes the work in its standard work instruction. A non-routine job is anything that is not in that instruction: a one-off repair, a shutdown task, a contractor job, a changeover done twice a year. Those are the jobs where severe injuries cluster, because nobody has done them often enough to be sure how, and they need their own form.

  • Ask whether the job is in the standard work instruction. If yes, use the routine JSRA for the station.
  • If no, open a blank non-routine form, break the job down, score it, get it approved, and only then start the work.
  • Keep the form with the job record, and review it after the job: what happened that the form did not say?
  • If the job comes back a second time, promote it to a routine JSRA.

Illustrative: a seized bearing on a conveyor roller is replaced about once a year. Scored cold, the removal step comes out at 12: probability 2, gravity 3 (a roller section weighs enough to crush a hand), M/C 2 (there is only a verbal habit of supporting it). The team adds a lifting plan with a support frame and a named second person, which takes M/C to 1 and the residual score to 6. It is rare, but "once a year" is not "low risk", and a rare job is the one where habit does not protect anyone. For work that needs a formal authorization on the day, the JSRA feeds the permit to work and the pre-task plan.

Where the step list comes from

The slow part of a JSRA is the first column. A time study has already broken the job into elements, with seconds against each, agreed with the operator, and an ergonomic assessment has scored the posture of each. Those elements are your rows. Add the hazard and the three ratings, and one filming session has produced three outputs. The guide on writing a JSA from video works the method, including the points where a safety breakdown has to differ from a timing breakdown.

LeanSuite does not write a JSRA. What it does is the first part: film the job on a phone, upload it, and AI video analysis drafts a time and motion study and an ergonomic study with REBA and RULA scores by task element, for a person to review. Your team takes the element list from there and does the assessment. The safety module then covers inspections, gemba walks and LOTO checks on the floor.

Limits of the JSRA and common mistakes

  • A three-point scale is coarse. Only ten scores exist, so many steps tie, and a 9 and a 12 may not differ in any way that matters. If you need finer ranking, use a five-by-five matrix; see the risk matrix calculator.
  • Scores are judgments. Two teams can rate the same step differently. Fix that with written scale definitions, examples on the form, and a facilitator who asks "why?" for every 3.
  • Scoring the plan instead of the practice. If the guard is bypassed on nights, M/C is 3 on nights, whatever the drawing says.
  • Scoring to keep the number low. If the team is rewarded for few high scores, they will find few. Reward the hunt for the hard ones.
  • Treating the total as a safety measure. The sum of scores in the example fell from 73 to 27, but the figure that matters is the highest score and what stands behind it.
  • Using the form as the end. A JSRA with no fixes, no second score and no re-check is a list of problems that someone has now written down.
  • Blaming people. Operator behaviour belongs in the hazard line as what the job makes easy, not as a score against a person.

A JSRA also covers one job at a time. For the whole department, with its non-job hazards, use a HIRA register or an area risk assessment, and for the moment of starting work use the point-of-work check. Rules differ by country and site. Check the requirements that apply to yours; this page is general guidance and not legal advice.

Templates and related guides

FAQ

Questions about jSRA (job safety risk assessment)

  1. JSRA stands for job safety risk assessment. You will also see job safety risk analysis, and the two mean the same thing. It is a job safety analysis that adds a score to each step, based on probability, gravity and the quality of the controls. No regulator defines the term, so what a JSRA looks like depends on the company that uses it.

  2. Rate each step 1 to 3 for probability, 1 to 3 for gravity and 1 to 3 for measures and controls, where 3 means the protection is weak. Multiply the three. Only ten results are possible: 1, 2, 3, 4, 6, 8, 9, 12, 18 and 27. Many teams treat 18 and above as act now, 8 to 12 as plan the fix, and 6 or below as monitor. Those bands are a convention, not a standard.

  3. A JSA lists the steps of a job, the hazard at each step and the control. A JSRA does the same and also scores every step before and after the controls, so you can rank the steps and show the effect of a fix. A JSA with a risk score on it is close to a JSRA, which is why the two names overlap in practice.

  4. A small team led by the supervisor or team leader, with at least two people who do the job every day and someone from safety or maintenance who knows which controls are possible. The people who do the job know the workarounds and the near misses, so a JSRA written at a desk will miss them. An approver with authority to fund the fixes signs it.

  5. Review it when the method, machine, tooling or material changes, after any injury or near miss on the job, when a new control is added, and on the review date written on the form. Re-score a few weeks after a fix to confirm the control works in use. Non-routine jobs should be reviewed after each time they are done, since the first pass is the most likely to have missed something.

  6. No regulation we know of requires a document called a JSRA. Laws in many countries do require employers to assess the risks of the work, and a JSRA is one way to record that assessment. Whether yours satisfies the rules that apply to your site is a question for your safety professional or counsel. This page is general guidance, not legal advice.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.