JSRA stands for job safety risk assessment, also written job safety risk analysis. It is a job safety analysis with a score: each step of a job is rated for probability, gravity and controls, one to three each, and the three are multiplied to give a number from 1 to 27.
JSRA is short for job safety risk assessment, sometimes job safety risk analysis. It is a company method, not a term any regulator defines. You break one job into steps, name the hazard at each step, and give three ratings from 1 to 3: probability (how likely), gravity (how bad) and measures and controls (how weak the protection is, where 1 is an engineered control and 3 is nothing). Multiply the three to get a score from 1 to 27, work the highest scores first, fit the controls, and score again to show the risk that is left. Teams use it to rank the steps of a job, justify the fixes and track how many jobs have been assessed. This is general guidance, not legal advice.
Last reviewed:
What is a JSRA, and what does the full form mean?
JSRA stands for job safety risk assessment. You will also see job safety risk analysis, and the letters are used in the same way. It is the plain job safety analysis with one thing added: a number. Every step of the job gets a score for how risky it is, so a team can see which steps to fix first and prove, afterwards, that the fix worked.
Be clear about what it is not. JSRA is a method name that companies use, mostly in manufacturing safety programmes. No regulator defines it, OSHA's booklet on job hazard analysis does not use it, and as far as we can find ISO 45001 does not either. So there is no official JSRA form to be right or wrong about. What you build is your own, and the quality comes from how the scores are given and what is done with them.
How it differs from its neighbours: the JSA lists steps, hazards and controls and may not score anything. The JHA guide scores severity times likelihood on a five-by-five scale. The JSRA scores three factors on a three-point scale, and the third factor, how good the existing protection is, is what sets it apart. The comparison guide puts all the documents side by side.
The three-factor score: probability, gravity, measures and controls
Each step gets three ratings from 1 to 3. The wording below is ours, written so that a team can argue about it for a minute and settle. Replace it with your site's own definitions, and write them on the form so every team scores the same way.
| Score | P: probability | G: gravity | M/C: measures and controls |
|---|---|---|---|
| 1 | Unlikely: has not happened on this job and is not expected in a working year | Minor: first aid, no lost time | Engineered control in place and working: a guard, interlock, fixture or lifting aid that does not depend on memory |
| 2 | Possible: could happen within a year, or has happened on a similar job | Serious: medical treatment or lost time, full recovery expected | Procedure, training or PPE only: protection depends on a person doing the right thing |
| 3 | Likely: happens, or nearly happens, on this job or in this area | Severe: permanent injury, loss of a limb or sight, a fatality, or several people hurt | Nothing effective in place, or the control is routinely bypassed |
Gravity means the realistic worst injury at this step, not the worst imaginable. Score it with the controls in place for P and M/C, and say so on the form.
Mind the direction of the third scale. For probability and gravity a higher number is worse, as you would expect. For measures and controls it is the same: 3 means the protection is poor. That feels backwards when you read it as "measures: 3", which sounds like a lot. Say it aloud as "controls: weak" until it sticks, or rename the column "control weakness" on your own form.
Multiply the three numbers. A step with probability 2, gravity 3 and weak controls (3) scores 2 times 3 times 3, which is 18. Multiplying, rather than adding, lets one very good control or one very low gravity pull the score down hard, and one bad factor push it up. Because each factor is 1, 2 or 3, only ten scores are possible: 1, 2, 3, 4, 6, 8, 9, 12, 18 and 27. That makes ranking quick and also means many steps will tie.
Most programmes group the ten into three bands. The bands below are a common convention, not a standard: you set your own. Out of the 27 possible combinations of three ratings, 4 land in the top band, 7 in the middle one and 16 in the bottom one, so a job with a lot of steps in the top band has a real problem.
Three ratings from 1 to 3 give only ten possible scores
P times G times M/C, each 1 to 3, can only produce 1, 2, 3, 4, 6, 8, 9, 12, 18 or 27. Of the 27 combinations, 4 score 18 or more, 7 score 8 to 12 and 16 score 6 or less. The bands are a convention. A step with probability 1, gravity 3 and weak controls scores 9.
Two cautions belong with the bands. First, do not let a low score hide a high gravity. A step with probability 1, gravity 3 and weak controls (3) scores only 9 and sits in the middle band, yet it is a step where one lapse could kill. Many teams add their own rule that any step with gravity 3 gets a named owner and a written reason, whatever its score. Second, treat the number as a way to start the conversation, not to end it.
The JSRA form, column by column
Layouts vary, but a working JSRA form has a header and one row per step with these columns. It is a JSA form with five extra columns: the three ratings, the score, and a second set of ratings for after the fix.
| Column | What goes in it |
|---|---|
| Header | Department, area or station, shift, the job, routine or non-routine, date, review date, and the team that did the assessment, including at least one person who does the job |
| Step or element | One action, a verb and an object, in the order done. The element list of a time study works as the step list |
| Hazard and risk family | What could happen and to whom, and the family it belongs to: equipment, environment, location, ergonomic, chemical, electrical or your own list. Families let you add up the picture later |
| Body part | The part of the body at risk: hands, eyes, back. It points straight at the PPE and the guard |
| P, G, M/C and score | The three ratings, 1 to 3 each, and their product |
| Current countermeasure | What is in place today that makes the M/C rating what it is. If you cannot write something here, M/C is 3 |
| PPE | What protective equipment the step needs, named, not "as required" |
| Proposed countermeasure | What will change, strongest control first (see the hierarchy of controls), with an owner and a date |
| Second P, G, M/C and score | The ratings you expect once the proposed countermeasure is in. This is the residual risk, and the number to re-check after the fix |
| Sign-off | Team members, approver and the date the operators were briefed |
The second score is a prediction until you re-check. Many programmes re-score some weeks after the fix, with the people who work the job, and replace the prediction with what they find.
How to run a JSRA in six steps
The method is a loop, and the last two steps are the ones that turn a form into an improvement. A small team does it: the supervisor or team leader, two or three people who do the job, and someone from safety or maintenance who can say what is possible.
Six steps of a JSRA
- 1
Identify: break the job down and list the hazards
- 2
Assess: give P, G and M/C and multiply
- 3
Choose countermeasures from the top of the hierarchy
- 4
Implement and update the paperwork
- 5
Check that it worked
- 6
Expand sideways
- 1
Identify: break the job down and list the hazards
Watch the job, or film it, and write the steps. Walk through the hazard families for each step and write what could happen to whom. Ask the operators about the near misses and the workarounds. See JSA from video for getting the steps from a time study video.
- 2
Assess: give P, G and M/C and multiply
Score every row with the people in the room, one factor at a time and out loud. Write down why when the team disagrees. Score with today's controls, as they are used on a bad day, not as they are drawn.
- 3
Choose countermeasures from the top of the hierarchy
Start with the highest scores. Ask first whether the step can go, then whether it can be made safe by design, then whether a guard, fixture or aid can hold it. Procedure and PPE come last. Write the second ratings as you go.
- 4
Implement and update the paperwork
Fit the control, change the procedure and the training, update the PPE list and the station placard. Brief the operators at the job and collect signatures.
- 5
Check that it worked
Go back after a few weeks, with a time long enough for the control to be used for real, and score again. If the real score is higher than the prediction, the control is not doing its job. Many programmes use about 90 days; pick what fits your job.
- 6
Expand sideways
List the other stations, lines and plants with the same hazard and copy the fix. A fix that is found once and used once is a repair. A fix copied to every similar job is a standard.
A worked JSRA: the trim press job, before and after
Illustrative example. An operator trims and stacks a die-cast housing at a trim press cell, one housing a cycle, 9 kg. Observed at a normal pace the job has eight elements and a 48 second cycle. The same job is worked as a time study, a severity times likelihood JSA and a REBA score in the one study, three outputs guide; here it is scored on the JSRA scale. The elements, the hazards and the scores are invented for this page.
| # | Element and hazard | P | G | M/C | Score | Countermeasure | P after | G after | M/C after | Score after |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Pick the housing from the cooling conveyor: contact with a warm part | 2 | 1 | 2 | 4 | None needed beyond gloves | 2 | 1 | 2 | 4 |
| 2 | Load it into the trim die: hands at the point of operation | 1 | 3 | 1 | 3 | Already behind a two-hand control and a light curtain | 1 | 3 | 1 | 3 |
| 3 | Step back, press the start, press trims: ejected flash and noise | 2 | 2 | 2 | 8 | Next planned: a fixed shield at the die | 2 | 2 | 2 | 8 |
| 4 | Unload the trimmed housing: sharp flash edge | 3 | 1 | 2 | 6 | Cut-resistant gloves and sleeves | 2 | 1 | 2 | 4 |
| 5 | Clear trimmed flash from the die by hand: hand in the die, sharp scrap | 2 | 3 | 3 | 18 | Eliminate: air blast and a scrap chute clear the flash | step removed | 0 | ||
| 6 | Deburr two edges with a hand file: repeated wrist motion, sharp edge | 2 | 1 | 2 | 4 | None this round | 2 | 1 | 2 | 4 |
| 7 | Turn, bend and stack on a pallet on the floor: back strain | 3 | 2 | 3 | 18 | Pallet on a spring lift table, turned to face the operator | 1 | 2 | 1 | 2 |
| 8 | Walk back to the conveyor: trip on flash on the floor | 2 | 2 | 3 | 12 | The chute keeps flash off the floor | 1 | 2 | 1 | 2 |
Score = P times G times M/C. Before: 4, 3, 8, 6, 18, 4, 18, 12, which adds up to 73. After: 4, 3, 8, 4, 0, 4, 2, 2, which adds up to 27. The sum is only a rough size of the problem; it is not a measure of safety.
JSRA scores for the trim press job, before and after
Example numbersScores before and after the fixes, element by element: 1 pick, 4 then 4. 2 load, 3 then 3. 3 start and trim, 8 then 8. 4 unload, 6 then 4. 5 clear flash, 18 then removed. 6 deburr, 4 then 4. 7 stack, 18 then 2. 8 walk back, 12 then 2. The highest score falls from 18 to 8.
Read it from the top score down. Elements 5 and 7 are both 18, and they have different causes. In element 5 the controls are absent (M/C 3) and the gravity is severe, since a hand is in a die. The fix is to remove the step: an air blast and a chute do the clearing, so nobody reaches in. That is the strongest control there is, and it takes 5 seconds out of the cycle. In element 7 it is probability and weak controls together: a twisted lift to floor level, done every cycle. A lift table that raises the pallet and turns it toward the operator takes probability to 1 and M/C to 1.
Element 8, at 12, is the quiet one. A trip hazard rarely makes a risk list, and here it exists because of element 5: flash on the floor. Removing the cause removes the hazard, and the score falls to 2 with no new equipment on the walking route. Element 4 is the honest one: gloves and sleeves are PPE, which is the weakest kind of control, so M/C stays at 2 and only the probability falls a point, from 3 to 2.
After the fixes the highest score on the job is 8, from element 3, down from 18. That is the next planned fix, a fixed shield at the die, and the form says so. Do not compare these numbers with the severity times likelihood scores the same job gets on a five-by-five scale in the other guides: highest 15 before and 10 after there. Different scales give different numbers for the same job, and a score only means something against the scale it came from.
The JSRA summary sheet: one picture for the station
Nobody at a press reads eight rows of scores. A summary sheet takes the highest score in each risk family and the PPE by body area, and is posted at the station so operators and visitors see the top risks in ten seconds. Some teams add a photograph of the machine with numbered callouts at the highest-scoring hazards. Update it whenever a countermeasure changes a score.
| Risk family | Elements in it | Highest before | Highest after |
|---|---|---|---|
| Equipment (point of operation, die) | 2, 5 | 18 | 3 |
| Ergonomic (lifting, repeated motion) | 6, 7 | 18 | 4 |
| Location (floor, walking route) | 8 | 12 | 2 |
| Hazard (heat, flash, noise, sharp edges) | 1, 3, 4 | 8 | 8 |
Family assignments are a house choice. Pick the list that matches the way your site reports incidents.
Summary sheet: highest score by risk family
Example numbersHighest score by risk family for the trim press job, before then after: equipment 18 then 3, ergonomic 18 then 4, location 12 then 2, hazard 8 then 8.
The summary also shows what the fixes did not touch. The hazard family is still at 8, so the next job on the list is clear. And it gives you the one number several programmes track: the share of jobs that have a JSRA at all. If 40 of 80 jobs are assessed, coverage is 50 percent, and the unassessed ones should be the non-routine and maintenance jobs first.
Routine and non-routine jobs
A routine JSRA belongs to a station and describes the work in its standard work instruction. A non-routine job is anything that is not in that instruction: a one-off repair, a shutdown task, a contractor job, a changeover done twice a year. Those are the jobs where severe injuries cluster, because nobody has done them often enough to be sure how, and they need their own form.
- Ask whether the job is in the standard work instruction. If yes, use the routine JSRA for the station.
- If no, open a blank non-routine form, break the job down, score it, get it approved, and only then start the work.
- Keep the form with the job record, and review it after the job: what happened that the form did not say?
- If the job comes back a second time, promote it to a routine JSRA.
Illustrative: a seized bearing on a conveyor roller is replaced about once a year. Scored cold, the removal step comes out at 12: probability 2, gravity 3 (a roller section weighs enough to crush a hand), M/C 2 (there is only a verbal habit of supporting it). The team adds a lifting plan with a support frame and a named second person, which takes M/C to 1 and the residual score to 6. It is rare, but "once a year" is not "low risk", and a rare job is the one where habit does not protect anyone. For work that needs a formal authorization on the day, the JSRA feeds the permit to work and the pre-task plan.
Where the step list comes from
The slow part of a JSRA is the first column. A time study has already broken the job into elements, with seconds against each, agreed with the operator, and an ergonomic assessment has scored the posture of each. Those elements are your rows. Add the hazard and the three ratings, and one filming session has produced three outputs. The guide on writing a JSA from video works the method, including the points where a safety breakdown has to differ from a timing breakdown.
LeanSuite does not write a JSRA. What it does is the first part: film the job on a phone, upload it, and AI video analysis drafts a time and motion study and an ergonomic study with REBA and RULA scores by task element, for a person to review. Your team takes the element list from there and does the assessment. The safety module then covers inspections, gemba walks and LOTO checks on the floor.
Limits of the JSRA and common mistakes
- A three-point scale is coarse. Only ten scores exist, so many steps tie, and a 9 and a 12 may not differ in any way that matters. If you need finer ranking, use a five-by-five matrix; see the risk matrix calculator.
- Scores are judgments. Two teams can rate the same step differently. Fix that with written scale definitions, examples on the form, and a facilitator who asks "why?" for every 3.
- Scoring the plan instead of the practice. If the guard is bypassed on nights, M/C is 3 on nights, whatever the drawing says.
- Scoring to keep the number low. If the team is rewarded for few high scores, they will find few. Reward the hunt for the hard ones.
- Treating the total as a safety measure. The sum of scores in the example fell from 73 to 27, but the figure that matters is the highest score and what stands behind it.
- Using the form as the end. A JSRA with no fixes, no second score and no re-check is a list of problems that someone has now written down.
- Blaming people. Operator behaviour belongs in the hazard line as what the job makes easy, not as a score against a person.
A JSRA also covers one job at a time. For the whole department, with its non-job hazards, use a HIRA register or an area risk assessment, and for the moment of starting work use the point-of-work check. Rules differ by country and site. Check the requirements that apply to yours; this page is general guidance and not legal advice.
Templates and related guides
- Job safety analysis template: the steps, hazards and controls form, with a risk score before and after.
- Risk assessment matrix: a five-by-five matrix if the three-point scale is too coarse for you.
- Risk matrix calculator: score and rank a list of hazards.
- Job safety analysis: the document, column by column, with a filled example.
- JSA vs JHA vs JSRA: which document for which situation.
- Hierarchy of controls: how to choose the countermeasure in the third step.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Five Common Manufacturing HazardsThe hazard families to walk through when you fill in the second column.
- 7 Preventable Shop Floor Incidents Most Plants MissIncidents that a scored, step-by-step look at the job would have flagged.
- Building Proactive Safety Culture Instead of Reactive ResponseWhy teams score honestly in some plants and defensively in others.
- Five Ways to Improve Safety on the Shop FloorThe kind of fixes that bring a score from 18 to 2.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Job safety analysis (JSA) templateJob steps, hazards, risk scored before and after the controls, the hierarchy of controls, PPE and sign-off.
- Risk assessment matrix template (5×5)A color-coded 5 × 5 severity and likelihood matrix, a scoring guide and a risk register.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
Doing this in LeanSuite
AI Video Analysis
One process video becomes a time and motion study, an ergonomic study, line balancing and more.
See AI Video AnalysisErgonomic Study
REBA and RULA posture scores by task element, drafted from the video for a person to review.
See Ergonomic StudySafety Improvement
Keeps employees alert to hazards and gives leaders the visibility to drive safety improvements.
See Safety Improvement
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about jSRA (job safety risk assessment)
JSRA stands for job safety risk assessment. You will also see job safety risk analysis, and the two mean the same thing. It is a job safety analysis that adds a score to each step, based on probability, gravity and the quality of the controls. No regulator defines the term, so what a JSRA looks like depends on the company that uses it.
Rate each step 1 to 3 for probability, 1 to 3 for gravity and 1 to 3 for measures and controls, where 3 means the protection is weak. Multiply the three. Only ten results are possible: 1, 2, 3, 4, 6, 8, 9, 12, 18 and 27. Many teams treat 18 and above as act now, 8 to 12 as plan the fix, and 6 or below as monitor. Those bands are a convention, not a standard.
A JSA lists the steps of a job, the hazard at each step and the control. A JSRA does the same and also scores every step before and after the controls, so you can rank the steps and show the effect of a fix. A JSA with a risk score on it is close to a JSRA, which is why the two names overlap in practice.
A small team led by the supervisor or team leader, with at least two people who do the job every day and someone from safety or maintenance who knows which controls are possible. The people who do the job know the workarounds and the near misses, so a JSRA written at a desk will miss them. An approver with authority to fund the fixes signs it.
Review it when the method, machine, tooling or material changes, after any injury or near miss on the job, when a new control is added, and on the review date written on the form. Re-score a few weeks after a fix to confirm the control works in use. Non-routine jobs should be reviewed after each time they are done, since the first pass is the most likely to have missed something.
No regulation we know of requires a document called a JSRA. Laws in many countries do require employers to assess the risks of the work, and a JSRA is one way to record that assessment. Whether yours satisfies the rules that apply to your site is a question for your safety professional or counsel. This page is general guidance, not legal advice.
Related guides and tools
- Job safety analysis: the document, column by column
- Job hazard analysis: the method and a severity times likelihood rating
- JSA vs JHA vs JSRA: which safety document for which situation
- JSA from video: one study, three outputs
- HIRA: the department-wide register that JSRAs feed
- Hierarchy of controls: choose the countermeasure
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.