Job safety analysis (JSA): what goes on the form and how to write one
Short answer
A job safety analysis (JSA) is a short written document that lists the steps of one job in order, what could hurt someone at each step, and the control that prevents it. It is written with the people who do the job, signed, and used to brief the crew.
JSA stands for job safety analysis. The form has a header (one job, one place, who wrote it, when it is due for review) and three working columns: the step, the hazard and the control. Many forms add the control type, the person who checks it and a risk score. Write the steps by watching the job, describe each hazard as what happens to whom and how, and write each control as something a person does or a thing that is fitted, strongest first. Then sign it, brief everyone who does the job, and move the controls into the procedure and the training. Job hazard analysis (JHA) is the same method under another name in most workplaces. This is general guidance, not legal advice; rules differ by country and industry.
Last reviewed:
What is a job safety analysis?
A job safety analysis is a written answer to three questions about one job: what are the steps, what could hurt someone at each step, and what stops that from happening. The answers sit side by side in a table, one row a step. That is the whole idea. The Canadian Centre for Occupational Health and Safety defines it as a process that helps assess a job to identify hazards and the control measures they need.
The full form of JSA is job safety analysis. In most workplaces it is the same thing as a job hazard analysis, or JHA. OSHA's booklet on the method is titled Job Hazard Analysis, and the same booklet uses the words job safety analysis in its own text. Some companies keep the two names apart, with the JHA scoring the risk and the JSA only listing it, but that is a house rule and not something a regulator defines. Our job hazard analysis guide teaches the method and the risk rating. This page is about the document: what goes on it, how to write each line well, who signs it and where it goes next.
It exists because most injuries happen in the gap between how a job is described and how it is done. Nobody writes "reach into the chamber while the rotor is still turning" in a procedure. People do it on a Friday afternoon when the machine is jammed. A JSA forces the team to walk through the job one step at a time and look at each one as a place where something can go wrong.
What goes on a JSA form, column by column
JSA forms differ from company to company, and no regulator publishes a required layout. The good ones share the same parts. The picture shows three rows of the filled example from later in this guide, with each part numbered; the table says what belongs in each part and what it is for.
One JSA form, three of its nine rows
Example numbersA job safety analysis form for changing the knives on a granulator. A header names the job. Each row has a step, a hazard, a control, the control type and who checks it. Rows for steps 2, 4 and 6 are shown.
| Part of the form | What goes in it | Why it is there |
|---|---|---|
| Header | The job (one job, named the way the floor names it), the machine and area, whether it is routine or non-routine and how often it is done, who wrote it, the date, the review date, and any procedure or permit the job needs | So a reader knows in ten seconds whether this sheet is about the job in front of them, and whether it is still current |
| Step | One action a row, in the order it is done, written as a verb and an object: "Pin the rotor" | The steps are the skeleton. A hazard that is not attached to a step has nowhere to be controlled |
| Hazard | What could happen at this step, to whom, and how: the event and the injury, not a one-word label | A full sentence points at its own control. "Cuts" does not |
| Control | What is done or fitted so the event cannot happen, or hurts less if it does. Strongest control first, one line each | This is the column people work from. If it is vague, the whole sheet is |
| Control type | Where each control sits on the hierarchy of controls: elimination, substitution, engineering, administrative or PPE | It shows at a glance how much of the job's safety rests on hardware and how much on memory |
| Who checks | The role that confirms the control is in place before the step: the setter, a second person, the supervisor | A control with no owner is a wish |
| Risk score (optional) | Severity times likelihood before and after the controls, on your site's scales | It puts the rows in order. The JHA guide and the JSRA guide cover two ways to score |
| PPE for the whole job | The protective equipment needed for the job as a whole, in one box | So nobody has to read nine rows to find out they need cut-resistant gloves |
| Sign-off | Who wrote it, who reviewed it, who approved it, and a line for every person briefed on it, with dates | A signature says who stands behind the sheet. The briefing list says who has seen it |
The free [job safety analysis template](/templates/job-safety-analysis-template) has these parts, with a risk score before and after the controls.
Keep it to one job a sheet and, where you can, one page. A JSA that runs to five pages gets filed. If the job needs more than about ten steps, it is two jobs: split it and write two sheets.
How to write a JSA in five steps
The JHA guide groups the method into four steps. Add the one that most often gets left out, telling people, and you have the five that CCOHS lists. Here they are from the point of view of the person holding the pen.
The five steps of a JSA
- 1
Choose the job
- 2
Watch the job and write the steps
- 3
Write the hazard for each step
- 4
Write the control for each hazard
- 5
Sign it, brief it and keep it alive
- 1
Choose the job
Pick one job and name it narrowly. OSHA's booklet puts these first: jobs with the highest injury or illness rates, jobs that could cause severe injury even with no history of it, jobs where one simple human error could lead to a severe injury, jobs that are new or have changed, and jobs complex enough to need written instructions. Non-routine work such as changeovers, jam clearing and maintenance belongs near the top of the list.
- 2
Watch the job and write the steps
Stand at the job with the person who does it and write each action as it happens, or film it and write the steps from the video. Tell the person you are studying the job, not them. Use a verb and an object for each step and keep the order. Then read the list back to them and ask what you missed and what happens when the step goes wrong.
- 3
Write the hazard for each step
For every step ask what could go wrong, how it could happen and what the injury would be. Write it as a short scenario. Cover the energy in the step (motion, gravity, pressure, electricity, heat), what is sharp, heavy, hot or airborne, and the posture. Ask the operator about the times it nearly went wrong; those are the best lines on the sheet.
- 4
Write the control for each hazard
Start at the top of the hierarchy: can the step be removed, or the hazard designed out? If not, what guard, interlock, pin, jig or tool makes the event impossible or unlikely? Only then write the procedure, the second-person check and the PPE. Name each control so that someone could walk up and see whether it is there.
- 5
Sign it, brief it and keep it alive
Have it reviewed and approved, then walk every person who does the job through it at the machine and get their signature. Move the controls into the procedure and the training plan. Set a review date, and redo the sheet when the job, the machine or the material changes, or when something goes wrong.
Video helps with step two more than people expect. A job watched live gets written the way the watcher remembers it. A job watched on video gets written the way it was done, pauses and shortcuts included. See how to write a JSA from video for the method.
How to write a good step, hazard and control line
Most weak JSAs have the right columns and the wrong sentences. The test for any line is simple: could a new person act on it without asking a question? The pairs below come from the same job, a knife change on a plastics granulator.
| Column | Weak line | What is wrong with it | Better line |
|---|---|---|---|
| Step, too broad | Change the knives | It is the whole job in one row, so every hazard lands on it and none can be tied to a moment | Remove the three rotor knives and the two bed knives |
| Step, too fine | Place the right hand on the 19 mm wrench and turn it a quarter turn | Too fine. That is a work instruction, and a JSA written at this level runs to 60 rows | Loosen the knife bolts |
| Hazard, a label | Cuts | A label. It does not say what cuts, when, or how badly, so it cannot point at a control | The wrench slips when a bolt breaks free and the hand lands on the knife edge: deep cut to the palm |
| Hazard, blames a person | Operator not paying attention | It names a person as the hazard. The real question is what makes the mistake easy | The rotor turns under its own weight when a knife comes off, with fingers between the rotor and the bed knife |
| Control, a slogan | Be careful | Nobody can check whether it was done | Fit the rotor lock pin before any hand enters the chamber |
| Control, PPE first | Wear PPE | Which PPE, for which step? It also puts the weakest control first | Lift each knife with the magnetic lifter straight into the carry box; cut-resistant gloves and sleeves as backup |
| Control, true but vague | Follow the lockout procedure | True and unhelpful. The sheet should name the procedure and the proof | Main disconnect off, your own lock and tag on, press start to prove it is dead |
The pattern for a hazard line follows OSHA's booklet, which describes a good hazard scenario by where it happens, who or what it happens to, what triggers it and the outcome.
- Steps: a verb and an object, in the order done. Small enough that one row holds one or two hazards, big enough that the job fits on a page. CCOHS's rule of thumb is that most jobs can be described in fewer than ten steps.
- Hazards: an event and an injury. If the line would fit any job in the plant ("slips, trips and falls"), it is too general for this one.
- Controls: a thing you can see or an action you can witness. Write the engineering control before the procedure, and the procedure before the PPE.
- Words: the ones the floor uses. If the operators call it the cradle, the sheet says cradle.
A complete JSA example: changing the knives on a granulator
Illustrative example, invented for this page. A plastics granulator beside a moulding press chops sprues and reject parts into regrind. Its three rotor knives and two bed knives are changed about every six weeks by a maintenance technician and a helper. It is a non-routine job with stored energy, sharp parts and a heavy hinged hopper, which is the kind of job a JSA is for. Header: job, change the knives on granulator G2; area, moulding hall, press 7; non-routine, about every six weeks; procedure needed, the lockout procedure for G2; PPE for the whole job, safety glasses, cut-resistant gloves and sleeves, safety shoes.
| Step | What could go wrong | Control | Strongest control type |
|---|---|---|---|
| 1. Run the chamber empty, stop the machine and swing the sprue chute to the scrap bin | Sprues keep dropping into the open chamber and hit the hands or face of the person working in it | Chute swung away and pinned; a "knife change" tag on the press robot panel | Engineering |
| 2. Switch off the main disconnect, fit your own lock and tag, press start | Someone starts the rotor while hands are in the chamber: amputation | Lockout to the written procedure for G2, one lock a person, start button pressed every time to prove it is dead | Administrative |
| 3. Wait for the rotor to stop, open the hopper and fit its prop | The rotor is still coasting when the chamber opens; the 40 kg hopper drops onto an arm | A time-delay interlock holds the hopper bolt until the rotor has stopped; prop pinned before anyone reaches in | Engineering |
| 4. Pin the rotor | The rotor turns under its own weight when a knife comes off, with fingers between the rotor knife and the bed knife | Rotor lock pin fitted before any hand enters; the red flag on the pin hangs outside the chamber | Engineering |
| 5. Clean the chamber and the knives | Dust blown into the eyes and lungs; a hand brushes a knife edge | Vacuum, never compressed air; safety glasses and cut-resistant gloves as backup | Substitution |
| 6. Remove the three rotor knives and the two bed knives | The wrench slips when a bolt breaks free and the hand lands on the edge: deep cut. A 4 kg knife dropped on a foot | Pull the wrench away from the edge; magnetic lifter; each knife straight into the slotted carry box; gloves, sleeves and safety shoes as backup | Engineering |
| 7. Fit the sharpened knives, set the gap and torque every bolt | A loose knife is thrown out at start-up or wrecks the rotor | Setting jig for the gap; torque wrench at the maker's value; a second person checks and initials every bolt | Engineering |
| 8. Take out the rotor pin, count the tools, close and latch the screen and hopper | A pin or wrench left inside is thrown out at start-up; fingers pinched under the closing hopper | Flag on the pin; tool count against the shadow board; hands on the hopper handles only, helper standing clear | Administrative |
| 9. Remove your lock, start the machine empty, listen for one minute and hand back | Someone is in line with the feed throat at start-up; a knock is ignored and a knife comes loose under load | Area clear and the starter standing to the side of the throat; stop at any knock; job signed back to production | Administrative |
Illustrative. "Strongest control type" is the highest level of the hierarchy among the controls in that row.
What each step of the granulator job rests on
Example numbers- 1Chute swung away and pinnedEngineering
- 2Lockout, your own lock, press startAdministrative
- 3Interlock holds the hopper, prop pinnedEngineering
- 4Rotor lock pin with outside flagEngineering
- 5Vacuum instead of compressed airSubstitution
- 6Magnetic lifter and carry boxEngineering
- 7Setting jig and torque wrenchEngineering
- 8Tool count, flag on the pinAdministrative
- 9Area clear, stand to the side, stop at a knockAdministrative
Nine steps coloured by the strongest control type. Engineering controls hold steps 1, 3, 4, 6 and 7. Substitution holds step 5. Steps 2, 8 and 9 rest on a person doing the right thing. No step rests on PPE alone.
Now read the last column, because it tells you how safe the job is on a bad day. Five of the nine steps rest on an engineering control: a chute, an interlock, a pin, a lifter, a jig. One rests on a substitution, the vacuum for the air line. No step rests on PPE alone, and PPE shows up only as a backup in steps 5 and 6. That leaves three steps, 2, 8 and 9, where the control is a person doing the right thing in the right order. Those three are where this job will go wrong if it ever does, so they are the ones to put in bold in the briefing, to check on an audit, and to spend the next improvement idea on.
Step 2 deserves a note. The lock is hardware, but a lockout only works if a person applies it, so this guide counts it as an administrative control backed by a physical lock. Some sites class it as isolation. Use your own site's classes, and see the lockout tagout guide for the procedure itself. The JSA names the lockout procedure. It does not replace it.
Who writes a JSA and who signs it
A JSA written by one person at a desk is a guess. CCOHS notes that a supervisor, a safety specialist or a safety committee member can lead one, and both it and OSHA stress the same point: involve the employees who do the job. A workable split looks like this.
| Role | What they do | What their signature says |
|---|---|---|
| The people who do the job | Walk through the steps, say what goes wrong in real life, test whether the controls are workable | "These are the real steps, and I have been briefed on the hazards and controls" |
| Supervisor or team leader | Leads the writing, owns the sheet, makes sure every person on every shift is briefed | "This is how the job is done in my area, and my people know it" |
| Safety or EHS lead | Checks the hazards against site rules and the regulations that apply, challenges weak controls | "The hazards are complete and the controls are adequate, as far as I can judge" |
| Maintenance or engineering | Confirms the engineering controls exist, work and are on a check schedule | "The hardware named on this sheet is real" |
| Area or plant manager | Approves the sheet and the actions that came out of it | "I accept this as the way the job is done, and I will fund the open actions" |
Titles differ by site. What matters is that the writer, a reviewer with safety knowledge and an approver with authority are three different people.
Two rules keep signatures honest. First, nobody signs as briefed until they have been walked through the sheet at the job, not handed it in a canteen. Second, a contractor's crew signs your JSA for your machine, or brings their own for you to review; see contractor safety management. Keep the signed copy where the job is done, and the master where it can be found on the day someone asks for it.
How a JSA turns into the SOP and the training
A JSA is an analysis. People do not work from an analysis; they work from a procedure and from what they were taught. So each row of a finished JSA has three places to go: a step with its warning in the standard operating procedure, a key point with its reason in the training, and a question in the pre-job briefing. If a control appears on the JSA and nowhere else, it will be forgotten within a month.
| JSA | SOP | |
|---|---|---|
| Question it answers | What could hurt someone in this job, and what stops it? | How is this job done correctly, every time? |
| What it covers | Safety only: steps, hazards, controls | Everything: safety, quality, sequence, settings, tools, checks |
| Level of detail | The main steps, usually under ten | Every step a trained person needs, with pictures where they help |
| Who writes it | The team that does the job, with a supervisor and a safety lead | The process owner, often engineering, with the operators |
| When it changes | When the hazards change, or after an incident | When the method, the product or the equipment changes |
| How it is used | To design the job, brief the crew and feed the SOP | As the working standard and the base for training and audits |
Write the JSA first. An SOP written before the hazards are understood has the warnings bolted on afterwards.
The order matters. Do the JSA while the method can still change, because the best controls change the method: a rotor pin adds a step, a magnetic lifter changes how a knife is held. Then write the SOP around the safer method, with each control as a numbered step or a warning placed before the step it protects, never after. Then train to it. In job instruction terms the JSA step becomes the important step, the control becomes the key point, and the hazard is the reason you give for it. People keep to a key point far better when they have been told what it prevents.
One JSA row, three places it has to go
A JSA row for step 4, pin the rotor, feeds a numbered step and a warning in the SOP, a step, key point and reason in the training, and a question in the pre-job briefing.
For work that is planned on the day, such as a contractor repair or a one-off lift, the JSA also feeds the pre-task plan and, where your rules call for one, the permit to work. The guide to JSA, JHA, JSRA and the other documents shows where each one sits.
Does OSHA require a job safety analysis?
Not by that name, as far as we can find. OSHA's publication 3071, Job Hazard Analysis (2002, revised), is a guidance booklet. It explains the technique and offers guidelines for doing one, and it reminds the reader that the OSHA standards for their industry are mandatory. The booklet is not itself a standard, and we know of no federal OSHA standard for general industry that tells every employer to keep a document called a JSA or a JHA for every job.
What OSHA standards do require, in many places, is that particular hazards are assessed. One example that touches almost every plant: 29 CFR 1910.132(d)(1) says the employer shall assess the workplace to determine whether hazards are present, or likely to be present, that make personal protective equipment necessary, and 1910.132(d)(2) requires a written certification that names the workplace evaluated, the person certifying and the date of the assessment. A set of JSAs with a PPE column covers much of the same ground job by job. Whether your JSAs can serve as that record is a question for your own safety professional or counsel, not for a web page.
Three more things can make a JSA a requirement for you even where the federal rules do not name it. State plans can differ from federal OSHA. Customers and owners often demand one by contract: construction contractors working for the US Army Corps of Engineers, for example, deal with the activity hazard analysis its safety manual calls for. And your own safety management system, or ISO 45001 if you hold it, will ask how you identify hazards for the work you do. Outside the United States the rules are different again. Check what applies to your site.
When to write a JSA and when to redo it
Write one before the job is done for the first time, not after the first injury. In practice that means these moments.
- A new job, machine, line or material, before it is handed to production.
- Non-routine work: changeovers, jam clearing, cleaning inside machines, maintenance, anything done by contractors.
- A job with a history: an injury, a first aid case or a near miss on it or on one like it.
- A job where one slip could be severe, even if nothing has ever happened.
- A job that is about to get a written procedure or a standard time. The steps are being listed anyway.
A JSA describes a job on the day it was written. It goes out of date the way a map does. OSHA's booklet says a periodic review keeps the analysis current, that a review can find hazards the first pass missed even when the job has not changed, and that it is particularly important to review after an injury or illness on that job. Redo or review the sheet when any of these happen.
- The method, the tooling, the machine, the material or the layout changes. Tie this to your management of change process so the JSA is on the checklist.
- An injury, a near miss or a stop-work call on the job.
- A new control is added. Controls bring their own hazards: a lift table adds a pinch point.
- The people change: a new crew, a new shift, a contractor.
- The review date arrives. Many sites set a yearly review for high-risk jobs and a longer cycle for the rest; choose your own and write it on the sheet.
After any revision, brief everyone again and collect the signatures again. OSHA's booklet makes the same point: when the analysis is revised, train all the employees affected by the change.
Common mistakes and the limits of a JSA
- Writing the job as designed instead of the job as done. The JSA for the tidy version protects nobody.
- One generic sheet copied across twenty machines. The hazards that matter are the ones that differ.
- Hazard lines that are labels and control lines that are slogans. See the pairs above.
- Every control is a procedure or PPE. If the last column says administrative nine times, the analysis has not finished its work.
- Signed in the office. A briefing signature collected away from the machine is paperwork.
- Controls that live only on the JSA and never reach the procedure, the training or the audit checklist.
- No review date, so the sheet describes a machine that was rebuilt two years ago.
Know what the document cannot do. A JSA covers one job, so it will not find hazards that belong to the area, such as traffic routes or noise from the next cell; that is what an area risk assessment is for. It describes the planned job, so it cannot see the hydraulic leak that appeared this morning; that is the job of a point-of-work check and of stop-work authority. And it is only as good as the people in the room. Operators who fear the result will describe the job the way the procedure says, so say plainly that the sheet is about the job and that nobody is being graded.
The step list you already have
The slowest part of a JSA is the step list, and many plants already have it without knowing. A time study breaks a job into elements. So does an ergonomic assessment. Those elements are the steps of the JSA, in order, already agreed with the operator. Add two columns to the time study sheet, hazard and control, and one filming session has fed three documents. The guide to writing a JSA from video works through it.
LeanSuite does not write a JSA for you, and it is not a permit-to-work system. What it does is the part before the JSA: you film the job on a phone and upload it, and AI video analysis turns the footage into a time and motion study and an ergonomic study by task element, as drafts for a person to review. The element list those studies produce is the step list of the JSA, which your team then writes. On the floor, the safety module runs safety inspections, gemba walks and LOTO checks from ready-made templates, and a failed item raises a safety tag.
Templates and related guides
- Job safety analysis template: the form in Word, Excel and PDF, with a risk score before and after the controls and a filled example.
- Job hazard analysis: the method in four steps, with a worked example and the risk rating.
- JSRA: the same job breakdown scored with three factors, and a residual score after the fix.
- JSA vs JHA vs JSRA: which document for which situation, including SWMS, HIRA and permits.
- Hierarchy of controls: how to rank the controls you write in the third column.
- Toolbox talk template: for briefing the crew on a new or revised JSA.
- Risk matrix calculator: if your form has a risk score.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Five Common Manufacturing HazardsThe hazard types to prompt for when you fill in the second column.
- 7 Preventable Shop Floor Incidents Most Plants MissIncidents that a step-by-step look at the job would have caught.
- Building Proactive Safety Culture Instead of Reactive ResponseWhy operators tell you the real steps in some plants and the official ones in others.
- Five Ways to Improve Safety on the Shop FloorPractical changes that follow once the JSAs show where the weak controls are.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Job safety analysis (JSA) templateJob steps, hazards, risk scored before and after the controls, the hierarchy of controls, PPE and sign-off.
- Toolbox talk templateA record of a short safety talk: topic, key points, questions raised, actions and an attendee sign-in sheet.
- Lockout/tagout (LOTO) procedure templateA machine-specific LOTO procedure: energy sources and isolation points, the steps from shutdown to restart, and the annual review.
- Risk assessment matrix template (5×5)A color-coded 5 × 5 severity and likelihood matrix, a scoring guide and a risk register.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
Doing this in LeanSuite
Safety Improvement
Keeps employees alert to hazards and gives leaders the visibility to drive safety improvements.
See Safety ImprovementAI Video Analysis
One process video becomes a time and motion study, an ergonomic study, line balancing and more.
See AI Video AnalysisTime and Motion Study
Film a station on a phone and get element times, cycle time, standard time and a Yamazumi chart.
See Time and Motion Study
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about job safety analysis (JSA)
A JSA, or job safety analysis, is a written breakdown of one job into its steps, the hazards at each step and the controls that prevent harm. It is written with the people who do the job, reviewed and signed, and then used to brief the crew and to build the safe method into the procedure and the training. Many workplaces call the same document a job hazard analysis.
JSA stands for job safety analysis. It names both the method, which is breaking a job into steps and finding the hazards and controls for each, and the form the result is written on. JHA, job hazard analysis, usually means the same thing. JSRA, job safety risk assessment, is a version that also scores each hazard. The letters JSA have other meanings outside safety, so spell it out the first time you use it.
Choose the job. Break it into steps by watching it done. Identify the hazards at each step. Decide the controls for each hazard, strongest first. Then communicate the result: sign it, brief everyone who does the job and build the controls into the procedure. Many guides list only the first four, but a JSA that is never briefed protects nobody, so the fifth step is the one to guard.
A header that names one job, the place, who wrote it and when it is due for review. A row for each step, with the hazard written as what could happen and how, and the control written as something that is fitted or done. Most forms add the control type, who checks it and the PPE for the whole job. It ends with signatures: writer, reviewer, approver and every person briefed.
Not by that name, as far as we can find. OSHA publication 3071, Job Hazard Analysis, is a guidance booklet, not a standard. OSHA standards do require specific hazard assessments, such as the workplace assessment for PPE and its written certification in 29 CFR 1910.132(d). State plans, customers and contracts can add their own requirements. This is general information and not legal advice, so check the rules that apply to your site.
Before a job is done for the first time, and before any non-routine work such as a changeover, a repair or a contractor job. Give priority to jobs with injuries or near misses, jobs where one mistake could be severe, and jobs that are new or have changed. Review the JSA when the method, machine or material changes, after any incident on the job, and on the review date written on the sheet.
A JSA is an analysis of what could hurt someone in a job and what stops it. An SOP is the full working procedure: sequence, settings, quality checks and safety together. The JSA comes first and feeds the SOP, where each control becomes a step or a warning placed before the step it protects. People work from the SOP day to day and use the JSA to design, brief and review the job.
Watch the job with the person who does it and write each step as a verb and an object, keeping to about ten steps. For each step write what could go wrong as a short scenario: the event, how it happens and the injury. Then write a control you could walk up and check, starting with engineering controls and ending with PPE. Have it reviewed, sign it and brief the crew at the job.
Related guides and tools
- Job hazard analysis: the method in four steps, with the risk rating
- JSA from video: get the step list from the footage of a time study
- JSRA: the job breakdown scored on probability, gravity and controls
- JSA vs JHA vs JSRA: which safety document for which situation
- Free JSA template in Word, Excel and PDF with a filled example
- SOP meaning and format: the procedure the JSA feeds
- Lockout tagout: the energy control procedure a JSA names but does not replace
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.