Free tool
Allowance calculator: personal, fatigue and delay
An allowance is the time added to normal time for personal needs, fatigue and unavoidable delays (PFD). Add the parts for one job, then apply the total: standard time = normal time × (1 + allowance) when the parts are percentages of normal time, or normal time ÷ (1 − allowance) when they are shares of the shift. Personal 5, basic fatigue 4, standing 2 and a measured delay of 4 make 15%, which turns a normal time of 0.672 minutes into a standard of 0.7728.
Allowance formula
Allowance, Aequalspersonal + basic fatigue + variable fatigue + delay
Standard timeequalsnormal time × (1 + A)
or Standard timeequalsnormal time divided by 1 − A
Delay allowanceequalsunavoidable delay time divided by working time
Share of the shiftequalsA added to normal time divided by 1 + A
Washroom, a drink, a short pause. ILO example: 5
Recovery every job needs. ILO example: 4
Heat, or a grade not listed above
Measured at the job. No table gives it.
For the standard time
For allowance minutes per shift
Pre-filled with the worked example below: a standing drill press job with a measured delay of 4%.
Total allowance
15%
Added to normal time: standard time = normal time × (1 + 0.15), which is normal time × 1.15.
What the allowance is made of
The working
Variable fatigue = 2 (standing) = 2%.
Total = 5 + 4 + 2 + 4 = 15%.
Standard time = 0.672 × (1 + 0.15) = 0.7728 min.
Allowance in the shift = 480 − 480 ÷ 1.15 = 62.6 min.
Standard time
0.7728 min
46.4 s. 0.1008 min of it is allowance.
Units per hour
77.6
60 ÷ standard minutes, one operator
Allowance per shift
62.6 min
417.4 min of work in 480
The same, as a share of the shift
13.04%
15 ÷ (100 + 15)
Read as a share of the shift, the same 15% would multiply normal time by 1.1765, not 1.15, and give 0.7906 min. Check which one your allowance table means before the standard is published.
Next step
Want to track this every week?
Bring this result to a 45-minute demo and we will show where it fits in LeanSuite's Time and Motion Study.
How to use it
Build the allowance for one job
1. Enter the two constants. Personal needs and basic fatigue apply to every job. Use your site's figures. The fields start at the ILO example values of 5 and 4.
2. Walk the job and tick what it adds. Standing, bending, lifting, poor light, noise, close attention. Each tick adds an example value. Type anything else, such as heat, in the other field.
3. Enter the delay you measured. Unavoidable delay minutes divided by working minutes. No table can give you this one.
4. Say how your site states allowances. Added to normal time, or a share of the shift. The calculator shows the same allowance both ways.
5. Add the normal time and the shift if you want the standard. You get the standard time, units per hour and the minutes of the shift the allowance covers.
Allowance calculation example
Illustrative numbers, not a benchmarkAn operator drills brackets at a press, standing. The site uses 5% for personal needs and 4% for basic fatigue. An all-day study found 16 minutes of unavoidable delay against 400 minutes of work. Normal time for the job is 0.672 minutes and the shift is 480 paid minutes. Illustrative numbers.
Step 1
Variable fatigue = 2% for standing.Step 2
Delay = 16 ÷ 400 = 4%.Step 3
Total allowance = 5 + 4 + 2 + 4 = 15%, added to normal time.Step 4
Standard time = 0.672 × (1 + 0.15) = 0.7728 min.Step 5
Units per hour = 60 ÷ 0.7728 = 77.6.Step 6
Allowance in the shift = 480 − 480 ÷ 1.15 = 62.6 min, leaving 417.4 min of work.
The example values, and where they come from
The ticks use entries from the table of allowances the ILO printed in the earlier editions of Introduction to Work Study, which Niebel's textbook reprints. All are percentages of normal time. They are examples, not a recommendation for your job.
| Allowance | Percent |
|---|---|
| Personal needs (every job) | 5 |
| Basic fatigue (every job) | 4 |
| Standing | 2 |
| Awkward position, such as bending | 2 |
| Very awkward position, lying or stretching | 7 |
| Lifting or force of 20 lb | 3 |
| Lifting or force of 40 lb | 9 |
| Light well below what is recommended | 2 |
| Intermittent loud noise | 2 |
| Fine or exacting work | 2 |
| Complex process, wide span of attention | 4 |
| Medium monotony | 1 |
| Tedious work | 2 |
The table has more grades in each row, and a row for heat and humidity set from measured conditions. The allowances section of the standard time guide has the full ranges.
Measuring the delay allowance
Only unavoidable delays count: ones a trained operator following the method could not have prevented.
- All-day study: watch a full shift and total the unavoidable delay minutes. Divide by the minutes spent working.
- Work sampling: take random observations over several days. The share of tallies in unavoidable delay, divided by the share working, is the allowance. The work sampling calculator says how many observations that takes.
If your site states allowances as a share of the shift, divide the delay minutes by the shift minutes instead.
What does not belong in an allowance
- Avoidable delays. A late start, a chat, waiting for material that is late every day. Fix them.
- A recurring machine fault. A press that jams every hour is a maintenance problem. If it must be covered, give it a temporary allowance with an end date.
- Fatigue on machine time. While a machine runs on its own the operator is recovering. Some systems give machine-controlled time the personal allowance only.
- Breaks counted twice. If the allowance covers rest, do not take the same breaks off the shift again when you work out capacity.
Sources and how this calculator was checked
- International Labour Office, Introduction to Work Study, ed. George Kanawaty: relaxation allowances as a percentage of basic time, with constants of 5% for personal needs and 4% for basic fatigue in the editions of 1969 to 1979, and a points system in the 4th revised edition of 1992.
- Benjamin W. Niebel, Motion and Time Study, 7th ed. (Irwin, 1982): the reprinted table of ILO recommended allowances the example values come from.
- Andris Freivalds, Niebel's Methods, Standards, and Work Design, 12th ed. (McGraw-Hill, 2009): standard time as normal time × (1 + allowance), and normal time ÷ (1 − allowance) when the allowance is a fraction of the workday.
Unit tests work the drill press job by hand under both conventions, check the conversion between them and the example table, and cover a zero allowance, a share of the shift of 100% and blank optional fields. This is general practice, not advice on any labor agreement: where allowances are negotiated, the agreed figures apply.
Embed this calculator
Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.
<iframe src="https://www.theleansuite.com/tools/allowance-calculator/embed" title="Allowance calculator: personal, fatigue and delay by LeanSuite" width="100%" height="2300" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/allowance-calculator">Allowance calculator: personal, fatigue and delay</a> by LeanSuite</p>How LeanSuite helps
LeanSuite's AI time and motion study times every element from one phone video of the process, and its study report gives cycle time, standard time, takt and units per hour, each linked to the video it came from. Use this calculator to build or check the allowance that goes into that standard.
See Time and Motion StudyRead more
- Free template: Time study sheet
- Time study in the lean glossary
- Standard time calculator: observed times, rating and allowance to a standard
- Work sampling observations calculator: size the delay study
- Work sampling: measuring delays with random observations
- Standard time: where personal, fatigue and delay allowances come from
FAQ
Allowance calculator: personal, fatigue and delay: common questions
Time added to normal time for things that are part of a working day but not part of the task: personal needs, recovery from fatigue and unavoidable delays. Normal time assumes the operator works every second of the shift. Nobody does, so the allowance turns normal time into a standard time you can plan a whole shift on. In the US the three parts are called PFD.
Add four parts. Take the personal and basic fatigue figures from your site's table. Walk the job and add a variable fatigue figure for each condition it has, such as standing or lifting. Measure the unavoidable delays and divide by working time. In the worked example, 5 + 4 + 2 for standing + 4 for delay makes 15%, added to normal time.
Personal is time for the washroom, a drink and a short pause, and it hardly depends on the job. Fatigue is time to recover from the effort: a basic amount for every job, plus more for standing, awkward posture, force, heat, noise, close attention or monotony. Delay covers short interruptions a trained operator could not have prevented, such as a tote change or a word from the supervisor.
No. Each site sets or negotiates its own. The most quoted figures come from an example table the ILO printed in earlier editions of Introduction to Work Study, where personal needs are 5% and basic fatigue 4% of normal time, with additions such as 2% for standing. The 1992 edition replaced that table with a points system. Treat any table as a starting point for your own.
It depends on what your percentages are percentages of. If each part is added to working time, as in the ILO table, use normal time × (1 + A). If each part is minutes out of the whole shift, such as 72 of 480, use normal time ÷ (1 − A). At 15% the second gives a standard 2.3% longer, so mixing them up moves every standard.
Watch the job for a full shift, or take random observations over several days, and add up the unavoidable delay time. Divide it by the time spent working. A study that finds 16 minutes of unavoidable delay against 400 minutes of work gives 16 ÷ 400 = 4%. Leave out avoidable delays: a late start, a chat, or hunting for a tool that has no home.
More free lean tools
All tools- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
- First pass yield (FPY) calculatorFirst pass yield at each step and rolled throughput yield (RTY) across the whole process.
- Cost of poor quality (COPQ) calculatorTotal COPQ and cost of quality, and each as a share of revenue, from the four quality cost categories.
- Process capability (Cp, Cpk) calculatorCp and Cpk against your specification limits, plus Pp and Ppk from pasted measurements, with a distribution chart.
- DPMO and sigma level calculatorDPMO, defects per unit, yield and sigma level from the defects found, units checked and opportunities per unit.
- MTBF and MTTR calculatorMean time between failures, mean time to repair and availability from operating time, failures and repair time.
- Lead time calculatorManufacturing lead time from WIP and throughput (Little's Law), and the share of it that adds value.
- Throughput time calculatorThroughput time from process, inspection, move and wait time, the share of it that adds value, and units per hour.
- Kaizen savings calculatorYearly savings, payback in months and first-year ROI of an improvement, from time saved, scrap avoided and its costs.
- TEEP calculatorTotal effective equipment performance: OEE multiplied by how much of all calendar time you plan to run.
- Overall labor effectiveness (OLE) calculatorHow well paid labor hours turn into good output: availability, performance and quality of the crew.
- Inventory turnover and days on hand calculatorHow many times stock turns over in a period and how many days of it you hold, from COGS and average inventory.
- Safety stock calculatorSafety stock and reorder point from the service level you want, average demand and lead time, and how much each varies.
- Scrap rate calculatorScrap rate, the cost of scrap per period and per year, and what reaching a target rate would save.
- TRIR and DART rate calculatorOSHA recordable and DART incident rates from your 300A case counts and hours, and what one more case does to them.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
- Production capacity calculatorMachine and labor steps in; each step's capacity per shift, the bottleneck, line capacity, takt time and utilization against demand out, with the working.
- TMU to seconds converterA time in TMU, MODs, seconds, minutes or hours, shown in all five at once, with the standard time and units per hour after your allowance.
- Work sampling observations calculatorThe number of random observations a work sampling study needs for the accuracy you want, with the working, the rounds and the days it takes.
- Maintenance strategy selectorAnswer the RCM questions for one failure mode and get the maintenance strategy, the reasoning and the check or test interval.
- Noise dose and TWA calculatorDose and 8-hour TWA for a shift of noise levels under OSHA and NIOSH, which limits are reached and how much loud time to cut.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
- Repair or replace calculatorEquivalent annual cost of keeping and repairing an old machine against buying a new one, with each one's economic life and the break-even figures.
- Compressed air leak cost calculatorAir lost, kW and cost a year for each tagged leak from its size and the pressure, ranked so the biggest gets fixed first.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
- Total manufacturing cost calculatorTotal manufacturing cost, cost of goods manufactured, cost per unit and the overhead rate from materials, labor and overhead.
- Acceptance sampling calculatorRead the OC curve and the real risks of a sampling plan, find the plan for your AQL and LTPD, or size a zero-defect test.
- Shift schedule plannerTen shift patterns on real dates: calendar for each crew, hours a week, weekends off, coverage and the weeks over 40 hours.
- Pareto chart makerPaste categories and counts: sorted bars, cumulative percentage line and the vital few at the 80% line, as a PNG or SVG.
- Histogram makerPaste measurements: the histogram with automatic or chosen bins, plus mean, median and standard deviation, as a PNG or SVG.
- Box plot makerPaste one or more groups of numbers: box plots with quartiles, IQR, whiskers and outliers by the 1.5 IQR rule, as a PNG or SVG.
- Fishbone diagram makerName the problem, list causes under the 6M bones, and download the Ishikawa diagram as a PNG or SVG.
- 5 Whys canvasWrite the problem, answer up to five whys, state the root cause and countermeasure, then print the one-page canvas.
- Lean maturity self-assessmentScore 27 statements across nine dimensions and get a band for each, an overall band, where to start and the guides to read.
- Lean method navigatorSix questions about one problem, then the lean method to start with, the two that follow, why each fits, five steps for Monday and what it will not solve.
- Manufacturing ROI calculatorAnswer a few questions about your shop floor, shifts and downtime to estimate your potential ROI with LeanSuite.