Short answer
A time and motion study watches a job closely to answer two questions: what is the best way to do it, and how long should that take a trained person at a normal pace? The answer is a standard time you can cost, staff and plan with.
Fix the method first, then time it. Split the job into elements, time them over enough cycles, rate the operator's pace and add allowances: standard time = observed time x rating x (1 + allowance). In the worked example below, 67.6 seconds observed becomes an 80.5 second standard, which is 44.7 units an hour.
Last reviewed:
What is a time and motion study?
A time and motion study in one picture
Example numbers- 1Motion study
Watch the job
Film or observe a few cycles before you time anything. - 2Motion study
Fix the method
Cut wasted motion. Agree one way and write it down. - 3Time study
Time the elements
67.6 sobserved: 5 elements, 20 cycles, plus the tote swap - 4Time study
Rate the pace
70.0 snormal time: what the job takes at a normal pace - 5Time study
Add allowances
80.5 sstandard time: 70.0 × 1.15
Five stages. Watch the job, then fix the method: that is the motion study. Time the elements, 67.6 seconds a unit observed. Rate the pace, 70.0 seconds normal. Add allowances, 80.5 seconds standard: that is the time study.
A time and motion study is two studies done in order. The motion study asks how the job should be done: which movements, in what sequence, with what within reach. The time study asks how long that method takes a trained person working at a normal pace, with fair allowances for rest and small delays. What comes out is a standard time.
The order matters. Time a clumsy method and you get a precise number for a job nobody should be doing that way. So you fix the method first, then put a stopwatch or a camera on it.
Four terms get used as if they meant the same thing. They don't, and a textbook, an auditor or a union representative will hold you to the difference.
How the four terms fit together
Work study
Examine the work, improve it, then measure it
First half
Method study
How should the job be done?
- Motion studyThe hands, eyes and feet, up close
- Process chartsEvery step of the job in sequence
- Spaghetti diagramThe walking, drawn on the floor plan
Second half
Work measurement
How long should it take?
- Time studyDirect timing with a stopwatch or video
- Work samplingRandom observations over several days
- Predetermined timesMTM, MOST and MODAPTS: times built from motions
- EstimatesFrom similar jobs done before
Time and motion study = motion study + time study
Method first, then time.
Work study has two halves. Method study asks how the job should be done and includes motion study, process charts and the spaghetti diagram. Work measurement asks how long the job should take and includes time study, work sampling, predetermined times and estimates. A time and motion study is motion study followed by time study.
| Term | Question it answers | What you do | Where the name comes from |
|---|---|---|---|
| Work study | Can this work be done better, and how long should it take? | The umbrella term: method study plus work measurement | The International Labour Organization (ILO) and British practice |
| Method study | What is the best way to do the job? | Record the present method, question every step, then design and install a better one | The ILO's term for the first half of work study |
| Motion study | Which hand and body movements can go? | Watch or film the hands, eyes and feet, and cut reaches, searches and regrasps | Frank and Lillian Gilbreth. Today it is the close-up end of method study |
| Work measurement | How long should the job take a qualified worker? | Time study, work sampling, predetermined times or estimates | The ILO's term for the second half of work study |
| Time study | How long does this method take, measured directly? | Time each element over many cycles, rate the pace and add allowances | Frederick W. Taylor |
Who developed it
Frederick W. Taylor began timing work with a stopwatch at the Midvale Steel Company in Philadelphia in 1881. His idea was to split a job into small elements, time each one, and build a fair day's work from the parts instead of from a foreman's guess.
Frank and Lillian Gilbreth came at it from the other side. Frank was a bricklaying contractor, and he studied the movements themselves: in Taylor's own 1911 account, Gilbreth cut bricklaying from 18 motions a brick to 5. The Gilbreths filmed people working with a clock in the frame and gave names to the basic hand motions, which they called therbligs (their surname, more or less backwards). A video time study today is the same idea with a better camera.
Taylor cared most about the time and the Gilbreths about the one best way. Current practice keeps both and follows the Gilbreths' order: method first, then time.
Why do a time study: the eight decisions it feeds
A standard time is an input. Without one, the decisions below get made on last year's numbers or on somebody's feel for the job. The figures use the example further down this page: one bench assembly job with a standard time of 80.5 seconds a unit.
Eight decisions one standard time feeds
Example numbersStandard time
80.5 s a unit
Costing
What does the labor in one unit cost?
80.5 s x $24.00 an hour / 3,600 = $0.54 a unit
Quoting
How many hours is this order?
5,000 units x 80.5 s / 3,600 = 111.8 standard hours
Staffing
How many people does demand need?
600 units a day x 80.5 s = 13.4 hours of work, so 2 operators on an 8 hour shift
Line balance
Does the job fit inside takt?
Takt is 28,800 s / 600 = 48 s. 80.5 s does not fit, so the work is split across 2 stations
Capacity
What can one bench make in a shift?
28,800 s / 80.5 s = 357 units
Layout
Where do the seconds go?
Fetching the housing takes 9 of the 65 observed seconds (14%), so its rack is the first thing to move
Ergonomics
How often is each motion repeated?
4 screws x 357 units = 1,428 screws a shift, all driven with the same hand
Incentives
What counts as fair performance?
380 units in 8 hours = 8.5 standard hours earned, a performance of 106%
The study itself shows you things no report does. Watch 20 cycles closely and you see the reach behind the operator, the part that never seats the first time, the wait for a shared tool. Sometimes those fixes are worth more than the number.
Each decision has its own guide: takt time for the pace demand sets, how many operators for the staffing sum, and line balancing for sharing the work across stations.
When a time study is the wrong tool
Direct timing suits repetitive manual work with a settled method and a cycle short enough to watch many times in one sitting: assembly, packing, machine loading, kitting. Outside that, another tool is cheaper or more honest.
| Situation | Use this | Why |
|---|---|---|
| Long, irregular work: maintenance, material handling, supervision, office work | Work sampling | Random observations over several days give the share of time spent on each activity, without following anyone with a watch |
| The job does not exist yet: a new product or a new line | A predetermined motion time system (MTM, MOST or MODAPTS), or times from a similar part | These build a time from the motions on paper. Check it with a time study once the job is running |
| The machine sets the pace | The machine's own cycle data | A counter is more exact than a watch. Time only the manual loading, unloading and checks |
| The method changes from cycle to cycle | Standard work, then a time study | Timing an unsettled job gives you the average of several methods |
| Very short cycles, a few seconds long | Video played frame by frame, or a predetermined motion time system | An observer with a stopwatch cannot read break points that close together |
| One-off or rarely repeated jobs | An estimate from similar past jobs | There are not enough cycles to measure |
| A changeover, not a production cycle | A SMED study | The filming and timing are the same, but the aim is to move work outside the stop, not to set a standard |
| The question is distance or posture, not time | A spaghetti diagram or an ergonomic assessment | They measure walking and physical risk directly |
Is a time study the right tool for this job?
Does the job exist yet, with a trained person doing it?
If no
Build the time from a predetermined motion time system or a similar part, then check it with a time study once the job runs.
Is the method settled, the same way on every cycle?
If no
Fix the method first. Timing a job that changes from cycle to cycle gives the average of several methods.
Does the work repeat in a cycle you can watch many times in one session?
If no
Use work sampling. It suits maintenance, material handling and other long, irregular work.
Is the time set by the person and not by the machine?
If no
Take the machine's cycle from its counter or controller, and time only the manual loading, unloading and checks.
Every answer right
Run a time study: direct timing, by stopwatch or from video.
Four questions in order. If the job does not exist yet, use predetermined times. If the method is not settled, fix the method first. If the work does not repeat in a cycle you can watch many times, use work sampling. If the machine sets the time, use machine data. If every answer is yes, run a time study.
Even where it fits, a time study has limits. It measures the job as one person did it, on one day, with those parts. It says nothing about quality. It does not see work that happens away from the bench. And the two judgment steps, rating and allowances, are only as good as the plant's agreed definitions. Say so when you present the number.
The steps of a time and motion study, in brief
Six steps cover it. How to conduct a time study takes the timing steps one at a time, with a filled-in observation sheet.
The six steps of a time and motion study
- 1
Decide what the number is for
- 2
Tell the people
- 3
Study and fix the method
- 4
Break the job into elements and time them
- 5
Rate the pace and add allowances
- 6
Use the standard and keep it current
- 1
Decide what the number is for
A standard for costing needs less precision than one that sets incentive pay. Write down the job, the purpose and the accuracy you need before anything else.
- 2
Tell the people
Explain the study to the operator and the supervisor, and to the union representative where there is one, before the first observation. Say what is being measured, why, and what will happen with the result.
- 3
Study and fix the method
Watch or film several cycles. Remove the wasted motion you can see, agree the method and write it down. This is the motion study, and it comes before any timing.
- 4
Break the job into elements and time them
Split the cycle into elements with clear end points and time each one over enough cycles. The General Electric guide suggests 20 cycles for a job of one to two minutes, and the sample size calculator checks it against your own readings.
- 5
Rate the pace and add allowances
Adjust the observed time to a normal pace, which is performance rating, then add allowances for personal needs, fatigue and unavoidable delays. Standard time explains both in depth.
- 6
Use the standard and keep it current
Publish the time together with the method it belongs to. Study the job again when the method, tooling, material or layout changes.
The time study sheet has the columns for steps 4 and 5, and the Excel version does the sums.
A worked example, start to finish
Illustrative example. A plant assembles electrical junction boxes at a bench. One operator seats a housing in a fixture, fits a gasket and cover, drives four screws, labels the unit and places it in a tote. Once every 20 units the operator swaps the full tote and restocks screws. The plant wants a standard time for costing and to decide how many benches it needs.
Method first
The engineer films five cycles before timing anything. Two things stand out: the screw bin sits behind the operator, and housings arrive in a pallet box on the floor. The bin moves to the front of the bench and the housings go on a waist-high rack. Only then does the timing start.
Time the elements
The job splits into five elements, each ending at something you can see or hear. The General Electric guide suggests 20 cycles for a job of this length, so the engineer times 20. In cycle 8 the operator drops a screw. That reading is circled and left out of the average for element 3.
| Element | Ends when | Average observed | Rating | Normal time |
|---|---|---|---|---|
| 1. Get housing and seat it in the fixture | Housing clicks into the fixture | 9.0 | 110 | 9.9 |
| 2. Fit gasket and position cover | Hand leaves the cover | 15.0 | 110 | 16.5 |
| 3. Drive four screws | Driver is back in its holder | 23.0 | 100 | 23.0 |
| 4. Apply label and check | Hand leaves the label | 12.0 | 100 | 12.0 |
| 5. Place unit in tote | Unit is released into the tote | 6.0 | 100 | 6.0 |
| Swap tote and restock screws, once every 20 units | Empty tote is in place | 52.0 / 20 = 2.6 | 100 | 2.6 |
| Total per unit | 67.6 | 70.0 |
Normal time = average observed time x rating / 100. Averages are over 20 cycles (19 for element 3). The how-to guide shows every reading on the sheet.
Rate the pace, then add allowances
Rating adjusts for pace. This operator was quicker than the plant's definition of normal on the two handling elements, so those are rated 110. Screw driving is paced by the tool and the last two elements looked normal, so they stay at 100. That turns 67.6 observed seconds into 70.0 normal seconds.
Allowances cover what nobody can avoid over a shift. This plant uses 15 percent for bench assembly: 5 for personal needs, 4 for basic fatigue, 2 for standing and 4 for unavoidable delays. Standard time = 70.0 x 1.15 = 80.5 seconds, or 1.34 minutes a unit.
From observed time to standard time
Example numbers- Observed
- Added by rating
- Added by allowances
Observed timeWhat the timer said, averaged over the good readings
67.6 s
Rating: elements 1 and 2 at 110 add 2.4 s
Normal timeThe same work at a normal pace
70.0 s
Allowance: 15% of normal time adds 10.5 s
Standard timeNormal time plus allowances for a full shift
80.5 s
- Units an hour
- 44.7
- 3,600 ÷ 80.5
- Minutes a unit
- 1.34
- 80.5 ÷ 60
- Standard hours per 100 units
- 2.24
- 80.5 × 100 ÷ 3,600
Three bars on the same scale. Observed time is 67.6 seconds a unit. Rating adds 2.4 seconds to give a normal time of 70.0 seconds. The 15 percent allowance adds 10.5 seconds to give a standard time of 80.5 seconds.
| Measure | Working | Result |
|---|---|---|
| Units an hour | 3,600 / 80.5 | 44.7 |
| Standard hours per 100 units | 80.5 x 100 / 3,600 | 2.24 |
| One bench in an 8 hour shift | 28,800 / 80.5 | 357 units |
| Benches for 600 units a day | 600 / 357 = 1.68 | 2 benches |
One caution on the allowance. Some plants state it as a percent of normal time, as here. Others state it as a percent of the working day, and then standard time = normal time / (1 minus allowance): 70.0 / 0.85 = 82.4 seconds. Both conventions are in the textbooks. Know which one your plant uses before you compare two standards.
The motion half: what to look for before you time
Most of the gain in a time and motion study comes from the motion half. Before you time anything, watch the hands and feet for these.
- Reaches beyond the forearm: parts, tools and bins that sit behind, above or across the operator.
- Walking: to a shared tool, a printer, a rack. A spaghetti diagram adds up the distance.
- Searching and choosing: picking the right part from a mixed bin, reading a label to find a setting.
- Regrasping: turning a part over in the hand because it arrived the wrong way up.
- One hand used as a clamp while the other works. A fixture can hold the part.
- Waiting: for a machine to finish, a cure time, a second person.
- Bending, twisting and lifting above the shoulder. These cost time and they hurt people. An ergonomic assessment scores the risk.
The junction box bench before and after the motion study
Example numbersBefore
Screws behind the operator, housings in a pallet box on the floor. Two picks a unit leave the easy reach zone.
After
Screws at the front of the bench, housings on a waist-high rack. Every pick is inside easy reach.
For each one, ask four questions in this order: can it be eliminated, combined with another step, rearranged or simplified? Engineers call that ECRS. Each motion you remove comes off the cycle for every unit made afterwards, which is why it is worth doing before the standard is set and not after.
Stopwatch, video or AI from video
The method is the same whichever tool does the timing. What changes is who watches, what record is left behind and where the analyst's hours go.
| Stopwatch at the bench | Video, timed by a person | AI from video | |
|---|---|---|---|
| How it works | An observer stands at the job with a watch and a board and writes each reading as it happens | The job is filmed once. An analyst plays it back and marks each break point | The job is filmed once. Software marks the elements and times each cycle, then a person checks and corrects the draft |
| Timing | To 0.01 minute on a decimal-minute watch, limited by how fast the observer can read and write | To one frame: 1/30 of a second at 30 frames a second | To one frame, as with any video |
| Record left behind | A sheet of numbers. Nobody can recheck a reading | The film. Anyone can replay a cycle and check a break point | The film, plus a timeline that ties each time to its frames |
| Rating the pace | Done live, once, by the observer | Can be done again later, by more than one person | Still a human judgment. Software does not know your plant's normal pace |
| Where the hours go | The observation, then the write-up | Often the most: filming, then replaying each cycle several times | Into review. The timing itself is drafted for you |
| What it misses | Short elements, two hands doing different things, anything that happens during a glance at the watch | Anything out of frame. Weight and effort are hard to judge from a screen | Anything out of frame, unusual work, and every judgment call |
| How operators take it | Someone standing over them with a watch | A camera. The footage can be shown to them and questioned | A camera, plus the question of who sees the film and how long it is kept |
| Best for | A quick check on one job with no setup | Disputed standards, training and method improvement | Many jobs, long recordings, and studies repeated after each change |
One stopwatch tick against video frames
Stopwatch: 1 tick = 0.01 min = 0.6 s
Video: 0.6 s × 30 frames a second = 18 frames
Each frame is 1/30 of a second.
One tick of a decimal-minute stopwatch is 0.01 minute, which is 0.6 seconds. Video at 30 frames a second has 18 frames in that time.
LeanSuite's time and motion study software works the third way: you film the station on a phone, it times every element and cycle and drafts the report, and you correct and certify it. AI video analysis lists the other studies the same film can feed. Whichever tool you pick, the rating, the allowances and the decision to publish a standard stay with a person who knows the job.
If you film, the filming guide and the video time study filming checklist cover camera angle, distance and what to agree with the operator first.
The people side: operators, unions and being watched
Operators have good reasons to distrust a time study. For more than a century the stopwatch has been followed by a higher quota often enough that the fear is reasonable. Ignore it and what you time is a show put on for the observer.
What to tell the operator before the study
- Why this job, and why now.
- What the number will be used for. If it will affect pay or staffing, say so. If it will not, say that, and only if it is true.
- That you are studying the job, not the person. The rating step exists so that one person's fast or slow day does not become the standard.
- That they will see the readings first and can question any element.
- For video: who will see the film, where it is kept and when it is deleted.
- Then ask a question: what gets in your way on this job? The answer is usually the start of the motion study.
What the operator should hear, and when
- Before
Why, what and what for
Why this job, what is being measured, what the number will and will not be used for, and who sees any film. - During
Work the way you normally do
Stand where you agreed to stand. Let the first cycles pass. Ask about anything unusual and do not guess. - After
Here are the readings
Show the sheet or the film first to the person on it. Let them question any element before the standard is published.
Where there is a union
Read the collective agreement before you plan the study. Many agreements say how standards are set, who may be present, what data the union may see and how a standard is challenged. Bring the steward in early, share the method and the readings, and never study anyone covertly. This is general practice, not legal advice. Your labor relations or HR lead should confirm what applies at your site.
The observer effect
People work differently when they are watched. Some speed up, some slow down, most become more careful. Three things reduce it. Let the first few cycles pass before you record. Watch long enough for the novelty to wear off. And rate the pace, so that an unusual tempo is corrected and not built into the standard.
Video helps, because a camera on a tripod is less of a presence than a person with a clipboard, and because the operator can go through the footage with you afterwards. A hidden camera does the opposite. It destroys trust and may breach the law or your agreement.
Two guides help with the conversations: resistance to change on the shop floor and difficult conversations at work.
Common mistakes
- Timing before fixing the method. You set a careful standard for a wasteful job, and every later improvement makes the standard wrong.
- Studying the fastest operator, or the newest. Pick a trained person who works at a steady pace, and rate what you see.
- Too few cycles. Three or five readings can hide most of the variation. Use a table or the formula to decide.
- Elements with fuzzy end points. If two observers would stop the watch at different moments, the element is not defined yet.
- Skipping the rating, or giving everyone 100. Then the standard is simply how fast that person happened to work.
- Forgetting occasional work: tote changes, restocking, a check on every tenth unit. Time it and spread it over the units it serves.
- Dropping readings you do not like. Leave a reading out only when you saw the cause and wrote it down.
- Copying an allowance from a website. Allowances belong to a plant and its conditions, and should be agreed before the study.
- Publishing the time without the method. A standard time only means something next to the method, layout and tools it was set for.
- Never studying the job again. A new fixture, a new material or a moved rack makes the old number fiction.
Tools and templates for a time and motion study
- Time study sheet: elements by cycles, with rating, allowance and standard time. Excel does the sums.
- Time study sample size calculator: how many cycles to time, from your first readings.
- Video time study filming checklist: what to set up and agree before you film.
- How to conduct a time study: the 10 step procedure with a filled-in sheet.
- Standard time: observed, normal and standard time, rating and allowances in depth.
- Work sampling: the method for long and irregular work.
- Line balancing: sharing the element times across stations to meet takt.
- Standard work: writing the method down once the times are set.
Time and motion study software
Run a time study in LeanSuite
Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownThe three standard work documents that the element times from a study are written into.
- The Three Elements of Standard Work: Takt Time, Work Sequence, Standard WIPHow the timed work sequence is set against takt time to define a job.
- Value-Added vs Non-Value-Added Time in ManufacturingHow to sort each timed element into value-added work, necessary work and waste.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsStacking each operator's element times against takt once the study is done.
- Manufacturing Bottleneck Elimination: 5 Proven StrategiesWhat to do with the station the study shows is slower than the rest.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Operator staffing calculatorTakt, work content, the operators a line needs, a check of your station plan and the roster with absence cover, from your own demand and element times.
- Process capacity sheet templateEach machine in a part's routing with manual, auto and tool change time, its capacity per shift, and the step that limits the cell against demand.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
Doing this in LeanSuite
Time and Motion Study
Film the station on a phone and LeanSuite times every element and cycle, gives cycle time and standard time, and draws a Yamazumi chart.
See Time and Motion StudyAI Video Analysis
Upload one process video and get time and motion, SMED, ergonomic and line balancing studies to review and certify.
See AI Video AnalysisLine Balancing
Drop in a video of your line and get a Yamazumi chart, a takt comparison and rebalancing recommendations.
See Line Balancing
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time and motion study
A time and motion study is a close look at one job to find the best way to do it and how long that should take. The motion study removes wasted movement and settles the method. The time study then times that method over many cycles, adjusts for the operator's pace and adds allowances. The result is a standard time for a trained person working at a normal pace.
To give a plant a time it can trust for one job done one way. That standard time feeds costing and quoting, staffing, line balancing, capacity planning, layout, ergonomics and, in some plants, incentive pay. The study also exposes wasted motion, because someone has to watch the job closely for 20 cycles or more.
Frederick Taylor used time study from the 1880s to set a fair day's work and the pay that went with it, in place of a foreman's guess. Frank and Lillian Gilbreth used motion study to find the least tiring way to do a job, starting with bricklaying. Plants still use both for the same ends: labor standards, costing, staffing and better methods.
Two sets of people. Frederick W. Taylor developed stopwatch time study at the Midvale Steel Company, starting in 1881. Frank and Lillian Gilbreth developed motion study in the early 1900s, filming work and naming the basic hand motions therbligs. The two approaches were later combined under the name time and motion study.
Work study is the umbrella term used by the International Labour Organization. It has two halves: method study, which improves how the job is done, and work measurement, which sets how long it should take. Time study is one technique of work measurement, next to work sampling and predetermined motion time systems. So every time study is work study, but not the other way round.
An engineer films a bench assembly job, moves the screw bin within reach, then times five elements over 20 cycles. The elements average 65.0 seconds, plus 2.6 seconds a unit for an occasional tote change. Rating brings that to 70.0 normal seconds and a 15 percent allowance gives a standard time of 80.5 seconds, or 44.7 units an hour. These are illustrative numbers.
When the work is long and irregular, such as maintenance or material handling, use work sampling. When the job does not exist yet, use a predetermined motion time system such as MTM or MOST. When a machine sets the pace, use its cycle data. And when the method still changes from cycle to cycle, settle the method before you time anything.
Whenever the job changes: a new method, fixture, tool, material, layout or product variant. Some plants also review standards on a set cycle, such as yearly, and look again when actual output drifts well away from the standard for no clear reason. A standard time is only valid for the method it was set on.
Related guides and tools
- How to conduct a time study: the 10 step procedure with a filled-in sheet
- Standard time: observed, normal and standard time, rating and allowances
- Work sampling: measuring long and irregular work by random observation
- Line balancing: sharing work across stations to meet takt
- Spaghetti diagram: drawing and adding up the walking in a job
- Ergonomic assessment in manufacturing: the methods and when to use each
- SMED: a time and motion study of a changeover
- Takt time: the pace customer demand sets
- How many operators do you need: work content divided by takt
- Time and motion study software: AI time study from phone video
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.